M5 southbound Jct 24 entry slip carriageway closure
ClearedM5 southbound Jct 24 entry slip carriageway closure
- Start time
- Wed, Jul 8, 2026 7:30 PM
- Expected end
- Thu, Jul 9, 2026 5:00 AM
- Duration
- 10 minutes 2 seconds
- Road
- M5 – M5 Southbound Between J24 And J25
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Jul 8, 2026 4:38 AM
- Last updated
- Wed, Jul 8, 2026 7:16 PM
- Cleared
- Wed, Jul 8, 2026 7:40 PM
- Latest update: M5 southbound Jct 24 entry slip carriageway closure
- Coordinates
- 51.099645, -2.996019
- Latitude span
- 51.096928 – 51.101251
- Longitude span
- -2.999174 – -2.993626
- Bounding box centre
- 51.099090, -2.996400
- Location descriptions
-
- M5 southbound between J24 and J25
- M5 J24 southbound access
- Feed validity status
- Planned
- Overall feed start
- Wed, Jul 8, 2026 7:30 PM
- Overall feed end
- Thu, Jul 9, 2026 5:00 AM
- Feed window length
- 9 hours 30 minutes
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
6 coordinate pairs- Description
- M5 southbound between J24 and J25
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 4 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {2FF51EAC-1DD3-40D5-834D-74AD1541A7E1}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 290 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.099127 -2.996942 51.098971 -2.997112 51.097927 -2.998213 51.097692 -2.998451 51.097438 -2.998688 51.096928 -2.999174
Segment 2
9 coordinate pairs- Description
- M5 J24 southbound access
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {D163D2F3-76F0-4B19-85CB-52BB41C6F974}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 3 m
- To Distance
- 339 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.101251 -2.993626 51.101184 -2.993827 51.101137 -2.994012 51.101101 -2.994111 51.101064 -2.994239 51.101008 -2.994395 51.100935 -2.994507 51.099789 -2.996039 51.099127 -2.996942
- Geometry type
- MultiLineString
- Geometry points
- 15
- First coordinate pair
- -2.996942, 51.099127
- Road section segments
- 1
- Road section points
- 15
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.996942,
51.099127
],
[
-2.997112,
51.098971
],
[
-2.998213,
51.097927
],
[
-2.998451,
51.097692
],
[
-2.998688,
51.097438
],
[
-2.999174,
51.096928
],
[
-2.993626,
51.101251
],
[
-2.993827,
51.101184
],
[
-2.994012,
51.101137
],
[
-2.994111,
51.101101
],
[
-2.994239,
51.101064
],
[
-2.994395,
51.101008
],
[
-2.994507,
51.100935
],
[
-2.996039,
51.099789
],
[
-2.996942,
51.099127
]
]
]
}
View road section coordinates
[
[
[
-2.996942,
51.099127
],
[
-2.997112,
51.098971
],
[
-2.998213,
51.097927
],
[
-2.998451,
51.097692
],
[
-2.998688,
51.097438
],
[
-2.999174,
51.096928
],
[
-2.993626,
51.101251
],
[
-2.993827,
51.101184
],
[
-2.994012,
51.101137
],
[
-2.994111,
51.101101
],
[
-2.994239,
51.101064
],
[
-2.994395,
51.101008
],
[
-2.994507,
51.100935
],
[
-2.996039,
51.099789
],
[
-2.996942,
51.099127
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, Jul 8, 2026 4:38 AM
- Record versioned
- Wed, Jul 8, 2026 7:16 PM
- Coordinate source
- Geometry
Driving on the M5? See every live closure, roadwork and planned restriction on this road.
M5 live closuresRelated incidents
M5 northbound Jct 17 slip road closed
Planned Roadworks National HighwaysStarts in 18 hours 39 minutes
M5 northbound Jct 17 slip road closed
Lane 3/2 closure
Planned Roadworks National HighwaysStarts in 17 hours 39 minutes
lane 3/2 closure
M5 Jct 18a lane closure on slip road to M49
Planned Roadworks National HighwaysStarts in 17 hours 39 minutes
M5 Jct 18a lane closure on slip road to M49
Lanes 2 and 3 closure northbound
Planned Roadworks National HighwaysStarts in 17 hours 39 minutes
Lanes 2 and 3 closure northbound
Lane 1 closure northbound
Planned Roadworks National HighwaysStarts in 16 hours 39 minutes
Lane 1 closure northbound
M5 northbound Jct 12 to Jct 11a hard shoulder closure 91/9-90/8
Planned Roadworks National HighwaysStarts in 4 hours 39 minutes
M5 northbound Jct 12 to Jct 11a hard shoulder closure 91/9-90/8