M5 southbound jct 21 to 22 hard shoulder closure
PlannedM5 southbound jct 21 to 22 hard shoulder closure
- Start time
- Tue, Aug 4, 2026 8:00 AM
- Expected end
- Tue, Aug 4, 2026 2:00 PM
- Duration
- 6 hours
- Road
- M5 – M5 Southbound Between J21 And J22
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Repair Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Jul 29, 2026 6:53 AM
- Last updated
- Tue, Aug 4, 2026 1:55 AM
- Cleared
- Tue, Aug 4, 2026 2:00 PM
- Latest update: M5 southbound jct 21 to 22 hard shoulder closure
- Coordinates
- 51.262457, -2.921575
- Latitude span
- 51.258818 – 51.265539
- Longitude span
- -2.922069 – -2.920668
- Bounding box centre
- 51.262179, -2.921369
- Location descriptions
-
- M5 southbound between J21 and J22
- Feed validity status
- Planned
- Overall feed start
- Tue, Aug 4, 2026 8:00 AM
- Overall feed end
- Tue, Aug 4, 2026 2:00 PM
- Feed window length
- 6 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
7 coordinate pairs- Description
- M5 southbound between J21 and J22
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {29DB5FE3-8A6C-4B23-9081-9889F06A62E3}
- Linear Element Type
- A Carriageway
- From Distance
- 104 m
- To Distance
- 364 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.265539 -2.922045 51.265387 -2.92206 51.265091 -2.922069 51.26456 -2.922058 51.264237 -2.922037 51.263518 -2.921937 51.263213 -2.921872
Segment 2
10 coordinate pairs- Description
- M5 southbound between J21 and J22
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {10999514-07C7-4ACE-B771-63BC526CCD8B}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 496 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.263213 -2.921872 51.262997 -2.921826 51.26289 -2.921797 51.261768 -2.921486 51.261275 -2.921342 51.260772 -2.921194 51.259929 -2.920955 51.259525 -2.92084 51.259031 -2.920715 51.258818 -2.920668
- Geometry type
- MultiLineString
- Geometry points
- 17
- First coordinate pair
- -2.922045, 51.265539
- Road section segments
- 1
- Road section points
- 17
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.922045,
51.265539
],
[
-2.92206,
51.265387
],
[
-2.922069,
51.265091
],
[
-2.922058,
51.26456
],
[
-2.922037,
51.264237
],
[
-2.921937,
51.263518
],
[
-2.921872,
51.263213
],
[
-2.921872,
51.263213
],
[
-2.921826,
51.262997
],
[
-2.921797,
51.26289
],
[
-2.921486,
51.261768
],
[
-2.921342,
51.261275
],
[
-2.921194,
51.260772
],
[
-2.920955,
51.259929
],
[
-2.92084,
51.259525
],
[
-2.920715,
51.259031
],
[
-2.920668,
51.258818
]
]
]
}
View road section coordinates
[
[
[
-2.922045,
51.265539
],
[
-2.92206,
51.265387
],
[
-2.922069,
51.265091
],
[
-2.922058,
51.26456
],
[
-2.922037,
51.264237
],
[
-2.921937,
51.263518
],
[
-2.921872,
51.263213
],
[
-2.921872,
51.263213
],
[
-2.921826,
51.262997
],
[
-2.921797,
51.26289
],
[
-2.921486,
51.261768
],
[
-2.921342,
51.261275
],
[
-2.921194,
51.260772
],
[
-2.920955,
51.259929
],
[
-2.92084,
51.259525
],
[
-2.920715,
51.259031
],
[
-2.920668,
51.258818
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Repair Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, Jul 29, 2026 6:53 AM
- Record versioned
- Tue, Aug 4, 2026 1:55 AM
- Coordinate source
- Geometry
Driving on the M5? See every live closure, roadwork and planned restriction on this road.
M5 live closuresRelated incidents
Lane 1 closure northbound
Planned Roadworks National HighwaysExpected to clear in 2 hours 4 minutes
Lane 1 closure northbound
Lane 3/2 closure
Planned Roadworks National HighwaysStarts in 17 hours 4 minutes
lane 3/2 closure
Lanes 2 and 3 closure northbound
Planned Roadworks National HighwaysStarts in 17 hours 4 minutes
Lanes 2 and 3 closure northbound
M5 Both Directions Jct 9 to Jct 15 mobile lane closures
Planned Roadworks National HighwaysStarts in 16 hours 4 minutes
M5 Both Directions Jct 9 to Jct 15 mobile lane closures
M5 northbound Jct 31 to Jct 30 hard shoulder running 259/8-256/7
Planned Roadworks National HighwaysStarts in 16 hours 4 minutes
M5 northbound Jct 31 to Jct 30 hard shoulder running 259/8-256/7
Lane 1 closure northbound
Planned Roadworks National HighwaysStarts in 16 hours 4 minutes
Lane 1 closure northbound