M5 southbound Jct 20 to Jct 21 single lane running (160/4 to 167/4)
ClearedM5 southbound Jct 20 to Jct 21 single lane running (160/4 to 167/4)
- Start time
- Thu, Sep 24, 2026 8:00 PM
- Expected end
- Fri, Sep 25, 2026 5:00 AM
- Duration
- 20 minutes 1 second
- Road
- M5 – M5 Southbound Between J21 And J22
- Category
- Construction Work
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Lanes affected
- 2 of 2 lanes affected
- Reason
- Road Improvement Or Upgrading
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Sep 24, 2026 12:35 AM
- Last updated
- Thu, Sep 24, 2026 7:41 PM
- Cleared
- Thu, Sep 24, 2026 8:20 PM
- Latest update: M5 southbound Jct 20 to Jct 21 single lane running (160/4 to 167/4)
- Coordinates
- 51.347161, -2.894723
- Latitude span
- 51.335855 – 51.354003
- Longitude span
- -2.895009 – -2.893665
- Bounding box centre
- 51.344929, -2.894337
- Location descriptions
-
- M5 southbound between J21 and J22
- Feed validity status
- Planned
- Overall feed start
- Thu, Sep 24, 2026 8:00 PM
- Overall feed end
- Fri, Sep 25, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
13 coordinate pairs- Description
- M5 southbound between J21 and J22
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {B6592E68-F1B3-4190-831B-B52AB3858079}
- Linear Element Type
- A Carriageway
- From Distance
- 33 m
- To Distance
- 661 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.354003 -2.894454 51.353652 -2.894519 51.353067 -2.894636 51.35268 -2.894672 51.352149 -2.894748 51.351735 -2.894783 51.351402 -2.89482 51.351042 -2.89486 51.350412 -2.894929 51.349458 -2.894983 51.349009 -2.894988 51.348604 -2.895009 51.348376 -2.895003
Segment 2
12 coordinate pairs- Description
- M5 southbound between J21 and J22
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {86AB052E-0FAE-4EF9-87FD-785B7C5DEA7D}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 992 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.348376 -2.895003 51.348145 -2.895 51.34739 -2.895 51.346779 -2.894988 51.346725 -2.894987 51.346464 -2.894982 51.345026 -2.894911 51.344657 -2.894875 51.344334 -2.894854 51.342636 -2.894663 51.340839 -2.894399 51.33947 -2.894208
Segment 3
3 coordinate pairs- Description
- M5 southbound between J21 and J22
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {6A0AEE5B-C814-4780-97A6-270B4B5E3519}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 403 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.33947 -2.894208 51.338747 -2.8941 51.335855 -2.893665
- Geometry type
- MultiLineString
- Geometry points
- 28
- First coordinate pair
- -2.894454, 51.354003
- Road section segments
- 1
- Road section points
- 28
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.894454,
51.354003
],
[
-2.894519,
51.353652
],
[
-2.894636,
51.353067
],
[
-2.894672,
51.35268
],
[
-2.894748,
51.352149
],
[
-2.894783,
51.351735
],
[
-2.89482,
51.351402
],
[
-2.89486,
51.351042
],
[
-2.894929,
51.350412
],
[
-2.894983,
51.349458
],
[
-2.894988,
51.349009
],
[
-2.895009,
51.348604
],
[
-2.895003,
51.348376
],
[
-2.895003,
51.348376
],
[
-2.895,
51.348145
],
[
-2.895,
51.34739
],
[
-2.894988,
51.346779
],
[
-2.894987,
51.346725
],
[
-2.894982,
51.346464
],
[
-2.894911,
51.345026
],
[
-2.894875,
51.344657
],
[
-2.894854,
51.344334
],
[
-2.894663,
51.342636
],
[
-2.894399,
51.340839
],
[
-2.894208,
51.33947
],
[
-2.894208,
51.33947
],
[
-2.8941,
51.338747
],
[
-2.893665,
51.335855
]
]
]
}
View road section coordinates
[
[
[
-2.894454,
51.354003
],
[
-2.894519,
51.353652
],
[
-2.894636,
51.353067
],
[
-2.894672,
51.35268
],
[
-2.894748,
51.352149
],
[
-2.894783,
51.351735
],
[
-2.89482,
51.351402
],
[
-2.89486,
51.351042
],
[
-2.894929,
51.350412
],
[
-2.894983,
51.349458
],
[
-2.894988,
51.349009
],
[
-2.895009,
51.348604
],
[
-2.895003,
51.348376
],
[
-2.895003,
51.348376
],
[
-2.895,
51.348145
],
[
-2.895,
51.34739
],
[
-2.894988,
51.346779
],
[
-2.894987,
51.346725
],
[
-2.894982,
51.346464
],
[
-2.894911,
51.345026
],
[
-2.894875,
51.344657
],
[
-2.894854,
51.344334
],
[
-2.894663,
51.342636
],
[
-2.894399,
51.340839
],
[
-2.894208,
51.33947
],
[
-2.894208,
51.33947
],
[
-2.8941,
51.338747
],
[
-2.893665,
51.335855
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Road Improvement Or Upgrading
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Sep 24, 2026 12:35 AM
- Record versioned
- Thu, Sep 24, 2026 7:41 PM
- Coordinate source
- Geometry
Driving on the M5? See every live closure, roadwork and planned restriction on this road.
M5 live closuresRelated incidents
M5 northbound Jct 10 entry slip road closed
Planned Roadworks National HighwaysExpected to clear in 8 hours 46 minutes
M5 northbound Jct 10 entry slip road closed
M5 northbound Western Arm northbound to M6 link road closure
Planned Roadworks National HighwaysExpected to clear in 8 hours 46 minutes
M5 northbound Western Arm northbound to M6 link road closure
M5 both directions Jct 24 to Jct 23 - lane closure for for structure
Planned Roadworks National HighwaysExpected to clear in 8 hours 46 minutes
M5 both directions Jct 24 to Jct 23 - lane closure for for structure
M5 northbound Jct 20 to Jct 19 lane closure 155/8-152/8
Active Roadworks National HighwaysExpected to clear in 8 hours 46 minutes
M5 northbound Jct 20 to Jct 19 lane closure 155/8-152/8
A417 both directions Brockworth roundabout - lane closure
Active Roadworks National HighwaysExpected to clear in 1 week 4 days
A417 both directions Brockworth roundabout - lane closure
M5 northbound Jct 10 to 9 - hardshoulder closure (78/2 to 77/3)
Planned Roadworks National HighwaysExpected to clear in 2 months 6 days
M5 northbound Jct 10 to 9 - hardshoulder closure (78/2 to 77/3)