M5 southbound Jct 13 entry slip lane 1 closure
ClearedM5 southbound Jct 13 entry slip lane 1 closure
- Start time
- Thu, Oct 8, 2026 7:00 PM
- Expected end
- Fri, Oct 9, 2026 5:00 AM
- Duration
- 10 hours
- Road
- M5 – M5 J13 Southbound Access
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Lanes affected
- 1 of 2 lanes affected, 1 of 3 lanes affected
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Sep 28, 2026 8:59 AM
- Last updated
- Thu, Oct 8, 2026 12:06 AM
- Cleared
- Fri, Oct 9, 2026 5:00 AM
- Latest update: M5 southbound Jct 13 entry slip lane 1 closure
- Coordinates
- 51.755679, -2.327562
- Latitude span
- 51.754424 – 51.757706
- Longitude span
- -2.329262 – -2.324596
- Bounding box centre
- 51.756065, -2.326929
- Location descriptions
-
- M5 J13 southbound access
- M5 southbound between J13 and J14
- Feed validity status
- Suspended
- Overall feed start
- Thu, Oct 8, 2026 7:00 PM
- Overall feed end
- Fri, Oct 9, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- M5 J13 southbound access
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {015B164E-A914-4C18-8CAE-771440F6C068}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 219 m
- To Distance
- 550 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.757706 -2.324596 51.756614 -2.326243 51.75572 -2.32754 51.755521 -2.327857
Segment 2
4 coordinate pairs- Description
- M5 southbound between J13 and J14
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {50B205B2-FFD9-4601-95F9-AC45860F8017}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 155 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.755521 -2.327857 51.755458 -2.327929 51.754465 -2.329212 51.754424 -2.329262
- Geometry type
- MultiLineString
- Geometry points
- 8
- First coordinate pair
- -2.324596, 51.757706
- Road section segments
- 1
- Road section points
- 8
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.324596,
51.757706
],
[
-2.326243,
51.756614
],
[
-2.32754,
51.75572
],
[
-2.327857,
51.755521
],
[
-2.327857,
51.755521
],
[
-2.327929,
51.755458
],
[
-2.329212,
51.754465
],
[
-2.329262,
51.754424
]
]
]
}
View road section coordinates
[
[
[
-2.324596,
51.757706
],
[
-2.326243,
51.756614
],
[
-2.32754,
51.75572
],
[
-2.327857,
51.755521
],
[
-2.327857,
51.755521
],
[
-2.327929,
51.755458
],
[
-2.329212,
51.754465
],
[
-2.329262,
51.754424
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Suspended
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Sep 28, 2026 8:59 AM
- Record versioned
- Thu, Oct 8, 2026 12:06 AM
- Coordinate source
- Geometry
Driving on the M5? See every live closure, roadwork and planned restriction on this road.
M5 live closuresRelated incidents
Hard shoulder closure southbound
Active Roadworks National HighwaysExpected to clear in 1 hour 39 minutes
Hard shoulder closure southbound
A417 both directions Brockworth roundabout - lane closure
Active Roadworks National HighwaysExpected to clear in 1 week 4 days
A417 both directions Brockworth roundabout - lane closure
M5 northbound Jct 22 to Jct 21 narrow lanes (166/3 to 161/9)
Planned Roadworks National HighwaysExpected to clear in 3 years 3 weeks
M5 northbound Jct 22 to Jct 21 narrow lanes (166/3 to 161/9)
M5 northbound Jct 10 entry slip road closed
Planned Roadworks National HighwaysStarts in 7 hours 39 minutes
M5 northbound Jct 10 entry slip road closed
M5 Northbound Jct 19 to Jct 18 lane closure 144/1-141/9
Planned Roadworks National HighwaysStarts in 7 hours 39 minutes
M5 Northbound Jct 19 to Jct 18 lane closure 144/1-141/9
M5 northbound Western Arm northbound to M6 link road closure
Planned Roadworks National HighwaysStarts in 7 hours 39 minutes
M5 northbound Western Arm northbound to M6 link road closure