M5 northbound Jct 9 entry slip road closure
ActiveM5 northbound Jct 9 entry slip road closure
- Start time
- Fri, Jul 31, 2026 8:04 PM
- Expected end
- Sat, Aug 1, 2026 5:00 AM
- Duration
- 8 hours 56 minutes
- Category
- Road Maintenance
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Jul 31, 2026 11:38 PM
- Last updated
- Sat, Aug 1, 2026 2:57 AM
- Cleared
- Sat, Aug 1, 2026 5:00 AM
- Latest update: M5 northbound Jct 9 entry slip road closure
- Feed validity status
- Active
- Overall feed start
- Fri, Jul 31, 2026 8:04 PM
- Overall feed end
- Sat, Aug 1, 2026 5:00 AM
- Feed window length
- 8 hours 56 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Fri, Jul 31, 2026 11:38 PM
- Record versioned
- Sat, Aug 1, 2026 2:57 AM
Related incidents
M25 Clockwise Jct 20 Exit Slip Road Lane 2 Closure
Active Roadworks National HighwaysExpected to clear in 1 hour 48 minutes
M25 Clockwise Jct 20 Exit Slip Road Lane 2 Closure
M25 anticlockwise Jct 12 to Jct 11 lane 4,3,2 closure
Active Roadworks National HighwaysExpected to clear in 1 hour 48 minutes
M25 anticlockwise Jct 12 to Jct 11 lane 4,3,2 closure
M25 Anti-clockwise Jct 6 to Jct 5 carriageway closure
Active Roadworks National HighwaysExpected to clear in 1 hour 18 minutes
M25 Anti-clockwise Jct 6 to Jct 5 carriageway closure
A3 Northbound WIsley carriageway closure between the exit and entry slip road
Active Roadworks National HighwaysExpected to clear in 1 hour 48 minutes
A3 Northbound WIsley carriageway closure between the exit and entry slip road
M1 southbound Jct 13 exit slip to Salford Road lane 1 closure
Planned Roadworks National HighwaysExpected to clear in 48 minutes 49 seconds
M1 southbound Jct 13 exit slip to Salford Road lane 1 closure
M1 southbound Jct 13 to Jct 11A lane 1 and 2 closure (MP 64/1 to 60/1)
Active Roadworks National HighwaysExpected to clear in 48 minutes 49 seconds
M1 southbound Jct 13 to Jct 11A lane 1 and 2 closure (MP 64/1 to 60/1)