M5 Northbound Jct 31 to 30 hardshoulder closure 258/7b - 256/9b
ClearedM5 Northbound Jct 31 to 30 hardshoulder closure 258/7b - 256/9b
- Start time
- Tue, Aug 4, 2026 6:00 AM
- Expected end
- Tue, Aug 4, 2026 4:00 PM
- Duration
- 10 hours
- Road
- M5 – M5 Northbound Between J31 And J30
- Category
- Road Maintenance
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Jul 15, 2026 3:18 PM
- Last updated
- Tue, Aug 4, 2026 3:52 PM
- Cleared
- Tue, Aug 4, 2026 4:00 PM
- Latest update: M5 Northbound Jct 31 to 30 hardshoulder closure 258/7b - 256/9b
- Coordinates
- 50.697240, -3.473120
- Latitude span
- 50.690466 – 50.705079
- Longitude span
- -3.479177 – -3.468597
- Bounding box centre
- 50.697773, -3.473887
- Location descriptions
-
- M5 northbound between J31 and J30
- Feed validity status
- Planned
- Overall feed start
- Tue, Aug 4, 2026 6:00 AM
- Overall feed end
- Tue, Aug 4, 2026 4:00 PM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- M5 northbound between J31 and J30
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {6B03FC49-3EA8-450E-A109-C0C503E85233}
- Linear Element Type
- B Carriageway
- From Distance
- 1,084 m
- To Distance
- 1,263 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.690466 -3.479177 50.691255 -3.478143 50.691721 -3.477591
Segment 2
13 coordinate pairs- Description
- M5 northbound between J31 and J30
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {3FCDC106-68F5-471B-931A-69261D3115E0}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 716 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.691721 -3.477591 50.691995 -3.47726 50.692642 -3.476558 50.693216 -3.475967 50.694345 -3.474896 50.6944 -3.474844 50.694773 -3.474501 50.695518 -3.473873 50.695809 -3.473642 50.696036 -3.473479 50.696708 -3.472962 50.697239 -3.472564 50.697289 -3.472529
Segment 3
14 coordinate pairs- Description
- M5 northbound between J31 and J30
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {B6E736E4-F046-4F23-9F79-0458E6A89C41}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 910 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.697289 -3.472529 50.697352 -3.472487 50.699039 -3.471421 50.699077 -3.471398 50.699084 -3.471394 50.699664 -3.471058 50.700217 -3.470764 50.700343 -3.470697 50.700696 -3.470524 50.701989 -3.469941 50.702992 -3.469548 50.704267 -3.469007 50.704964 -3.46866 50.705079 -3.468597
- Geometry type
- MultiLineString
- Geometry points
- 30
- First coordinate pair
- -3.479177, 50.690466
- Road section segments
- 1
- Road section points
- 30
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-3.479177,
50.690466
],
[
-3.478143,
50.691255
],
[
-3.477591,
50.691721
],
[
-3.477591,
50.691721
],
[
-3.47726,
50.691995
],
[
-3.476558,
50.692642
],
[
-3.475967,
50.693216
],
[
-3.474896,
50.694345
],
[
-3.474844,
50.6944
],
[
-3.474501,
50.694773
],
[
-3.473873,
50.695518
],
[
-3.473642,
50.695809
],
[
-3.473479,
50.696036
],
[
-3.472962,
50.696708
],
[
-3.472564,
50.697239
],
[
-3.472529,
50.697289
],
[
-3.472529,
50.697289
],
[
-3.472487,
50.697352
],
[
-3.471421,
50.699039
],
[
-3.471398,
50.699077
],
[
-3.471394,
50.699084
],
[
-3.471058,
50.699664
],
[
-3.470764,
50.700217
],
[
-3.470697,
50.700343
],
[
-3.470524,
50.700696
],
[
-3.469941,
50.701989
],
[
-3.469548,
50.702992
],
[
-3.469007,
50.704267
],
[
-3.46866,
50.704964
],
[
-3.468597,
50.705079
]
]
]
}
View road section coordinates
[
[
[
-3.479177,
50.690466
],
[
-3.478143,
50.691255
],
[
-3.477591,
50.691721
],
[
-3.477591,
50.691721
],
[
-3.47726,
50.691995
],
[
-3.476558,
50.692642
],
[
-3.475967,
50.693216
],
[
-3.474896,
50.694345
],
[
-3.474844,
50.6944
],
[
-3.474501,
50.694773
],
[
-3.473873,
50.695518
],
[
-3.473642,
50.695809
],
[
-3.473479,
50.696036
],
[
-3.472962,
50.696708
],
[
-3.472564,
50.697239
],
[
-3.472529,
50.697289
],
[
-3.472529,
50.697289
],
[
-3.472487,
50.697352
],
[
-3.471421,
50.699039
],
[
-3.471398,
50.699077
],
[
-3.471394,
50.699084
],
[
-3.471058,
50.699664
],
[
-3.470764,
50.700217
],
[
-3.470697,
50.700343
],
[
-3.470524,
50.700696
],
[
-3.469941,
50.701989
],
[
-3.469548,
50.702992
],
[
-3.469007,
50.704267
],
[
-3.46866,
50.704964
],
[
-3.468597,
50.705079
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, Jul 15, 2026 3:18 PM
- Record versioned
- Tue, Aug 4, 2026 3:52 PM
- Coordinate source
- Geometry
Driving on the M5? See every live closure, roadwork and planned restriction on this road.
M5 live closuresRelated incidents
Lane 1 closure
Active Roadworks National HighwaysExpected to clear in 9 hours 33 minutes
lane 1 closure
M5 northbound Jct 31 to Jct 30 hard shoulder running 259/8-256/7
Active Roadworks National HighwaysExpected to clear in 9 hours 33 minutes
M5 northbound Jct 31 to Jct 30 hard shoulder running 259/8-256/7
M5 northbound Jct 24 to 23 carriageway closure
Planned Roadworks National HighwaysStarts in 1 hour 33 minutes
M5 northbound Jct 24 to 23 carriageway closure
Lane closures 197/9B to 196/4B
Planned Roadworks National HighwaysStarts in 33 minutes 30 seconds
lane closures 197/9B to 196/4B
M5 Jct 18a lane closure on slip road to M49
Planned Roadworks National HighwaysStarts in 33 minutes 30 seconds
M5 Jct 18a lane closure on slip road to M49
Lane 3/2 closure
Planned Roadworks National HighwaysStarts in 33 minutes 30 seconds
lane 3/2 closure