M5 Northbound Jct 14 to 13 lane 3 closure 106/4b - 105/8b
ClearedM5 Northbound Jct 14 to 13 lane 3 closure 106/4b - 105/8b
- Start time
- Fri, Sep 18, 2026 8:00 PM
- Expected end
- Sat, Sep 19, 2026 5:00 AM
- Duration
- 5 hours 25 minutes 1 second
- Road
- M5 – M5 Northbound Between J14 And J13
- Category
- Road Maintenance
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 3 closed, 1 of 3 lanes affected
- Reason
- Repair Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Sat, Sep 19, 2026 12:31 AM
- Last updated
- Sat, Sep 19, 2026 1:10 AM
- Cleared
- Sat, Sep 19, 2026 1:25 AM
- Latest update: M5 Northbound Jct 14 to 13 lane 3 closure 106/4b - 105/8b
- Coordinates
- 51.728301, -2.349224
- Latitude span
- 51.726223 – 51.730892
- Longitude span
- -2.351009 – -2.347387
- Bounding box centre
- 51.728558, -2.349198
- Location descriptions
-
- M5 northbound between J14 and J13
- Feed validity status
- Active
- Overall feed start
- Fri, Sep 18, 2026 8:00 PM
- Overall feed end
- Sat, Sep 19, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
6 coordinate pairs- Description
- M5 northbound between J14 and J13
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl3
- Lane Number
- 3
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {413750E6-35DB-4AC9-ACA0-32B634D1C5B3}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 287 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.728504 -2.348989 51.728657 -2.348889 51.728801 -2.348793 51.729279 -2.348474 51.729738 -2.348159 51.730892 -2.347387
Segment 2
7 coordinate pairs- Description
- M5 northbound between J14 and J13
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl3
- Lane Number
- 3
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {8AD3C250-D6DC-4AEA-9E78-C3D992355681}
- Linear Element Type
- B Carriageway
- From Distance
- 1,402 m
- To Distance
- 1,692 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.726223 -2.351009 51.726349 -2.350869 51.727089 -2.350137 51.727449 -2.349827 51.72799 -2.349362 51.728441 -2.349032 51.728504 -2.348989
- Geometry type
- MultiLineString
- Geometry points
- 13
- First coordinate pair
- -2.348989, 51.728504
- Road section segments
- 1
- Road section points
- 13
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.348989,
51.728504
],
[
-2.348889,
51.728657
],
[
-2.348793,
51.728801
],
[
-2.348474,
51.729279
],
[
-2.348159,
51.729738
],
[
-2.347387,
51.730892
],
[
-2.351009,
51.726223
],
[
-2.350869,
51.726349
],
[
-2.350137,
51.727089
],
[
-2.349827,
51.727449
],
[
-2.349362,
51.72799
],
[
-2.349032,
51.728441
],
[
-2.348989,
51.728504
]
]
]
}
View road section coordinates
[
[
[
-2.348989,
51.728504
],
[
-2.348889,
51.728657
],
[
-2.348793,
51.728801
],
[
-2.348474,
51.729279
],
[
-2.348159,
51.729738
],
[
-2.347387,
51.730892
],
[
-2.351009,
51.726223
],
[
-2.350869,
51.726349
],
[
-2.350137,
51.727089
],
[
-2.349827,
51.727449
],
[
-2.349362,
51.72799
],
[
-2.349032,
51.728441
],
[
-2.348989,
51.728504
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Repair Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Sat, Sep 19, 2026 12:31 AM
- Record versioned
- Sat, Sep 19, 2026 1:10 AM
- Coordinate source
- Geometry
Driving on the M5? See every live closure, roadwork and planned restriction on this road.
M5 live closuresRelated incidents
M5 northbound Jct 10 entry slip road closed
Active Roadworks National HighwaysExpected to clear in 5 hours 37 minutes
M5 northbound Jct 10 entry slip road closed
M5 Northbound Jct 19 to Jct 18 lane closure 144/1-141/9
Active Roadworks National HighwaysExpected to clear in 5 hours 37 minutes
M5 Northbound Jct 19 to Jct 18 lane closure 144/1-141/9
M5 northbound Jct 20 to Jct 19 lane closure 155/8-152/8
Active Roadworks National HighwaysExpected to clear in 5 hours 37 minutes
M5 northbound Jct 20 to Jct 19 lane closure 155/8-152/8
M5 northbound Jct 22 to Jct 21 narrow lanes (166/3 to 161/9)
Active Roadworks National HighwaysExpected to clear in 3 years 3 weeks
M5 northbound Jct 22 to Jct 21 narrow lanes (166/3 to 161/9)
M5 northbound Jct 10 entry slip road closed
Cleared Roadworks National HighwaysCleared 3 hours 2 minutes ago
M5 northbound Jct 10 entry slip road closed
M5 Northbound Jct 19 to Jct 18 lane closure 144/1-141/9
Cleared Roadworks National HighwaysCleared 3 hours 22 minutes ago
M5 Northbound Jct 19 to Jct 18 lane closure 144/1-141/9