M42 southbound Jct 6 dedicated exit slip road closure to A45
ClearedM42 southbound Jct 6 dedicated exit slip road closure to A45
- Start time
- Mon, Jul 27, 2026 8:00 PM
- Expected end
- Tue, Jul 28, 2026 4:00 AM
- Duration
- 7 hours 35 minutes 2 seconds
- Road
- M42 – M42 J6 Southbound Exit
- Category
- Construction Work
- Direction
- Southbound
- Reason
- Road Improvement Or Upgrading
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Jul 15, 2026 11:31 AM
- Last updated
- Tue, Jul 28, 2026 3:03 AM
- Cleared
- Tue, Jul 28, 2026 3:35 AM
- Latest update: M42 southbound Jct 6 dedicated exit slip road closure to A45
- Coordinates
- 52.447046, -1.708360
- Latitude span
- 52.445942 – 52.448808
- Longitude span
- -1.708523 – -1.707910
- Bounding box centre
- 52.447375, -1.708217
- Location descriptions
-
- M42 J6 southbound exit
- link road from M42 J6 southbound exit to A452 junction with the A45
- Feed validity status
- Planned
- Overall feed start
- Mon, Jul 27, 2026 8:00 PM
- Overall feed end
- Tue, Jul 28, 2026 4:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- M42 J6 southbound exit
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M42
- Linear Element Model
- The Network Model
- Linear Element Id
- {51E9E747-C99E-C4FB-3205-901541E606CC}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 75 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.448454 -1.708328 52.447785 -1.708492
Segment 2
2 coordinate pairs- Description
- M42 J6 southbound exit
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M42
- Linear Element Model
- The Network Model
- Linear Element Id
- {B23EB7DB-49A4-4A79-86E4-C9D8B5426AF1}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 24 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.447785 -1.708492 52.447569 -1.708523
Segment 3
2 coordinate pairs- Description
- M42 J6 southbound exit
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M42
- Linear Element Model
- The Network Model
- Linear Element Id
- {D177EFD0-6749-E6DA-8584-E01434BADF70}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 289 m
- To Distance
- 328 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.448808 -1.708287 52.448454 -1.708328
Segment 4
11 coordinate pairs- Description
- link road from M42 J6 southbound exit to A452 junction with the A45
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M42
- Linear Element Model
- The Network Model
- Linear Element Id
- {BB561887-108B-4224-9B4C-7705AA65F7EF}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 195 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.447569 -1.708523 52.446868 -1.708499 52.44685 -1.708498 52.446481 -1.708486 52.4464 -1.708472 52.446355 -1.708457 52.446274 -1.708399 52.446166 -1.708282 52.446049 -1.708135 52.445977 -1.708004 52.445942 -1.70791
- Geometry type
- MultiLineString
- Geometry points
- 17
- First coordinate pair
- -1.708328, 52.448454
- Road section segments
- 1
- Road section points
- 17
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.708328,
52.448454
],
[
-1.708492,
52.447785
],
[
-1.708492,
52.447785
],
[
-1.708523,
52.447569
],
[
-1.708287,
52.448808
],
[
-1.708328,
52.448454
],
[
-1.708523,
52.447569
],
[
-1.708499,
52.446868
],
[
-1.708498,
52.44685
],
[
-1.708486,
52.446481
],
[
-1.708472,
52.4464
],
[
-1.708457,
52.446355
],
[
-1.708399,
52.446274
],
[
-1.708282,
52.446166
],
[
-1.708135,
52.446049
],
[
-1.708004,
52.445977
],
[
-1.70791,
52.445942
]
]
]
}
View road section coordinates
[
[
[
-1.708328,
52.448454
],
[
-1.708492,
52.447785
],
[
-1.708492,
52.447785
],
[
-1.708523,
52.447569
],
[
-1.708287,
52.448808
],
[
-1.708328,
52.448454
],
[
-1.708523,
52.447569
],
[
-1.708499,
52.446868
],
[
-1.708498,
52.44685
],
[
-1.708486,
52.446481
],
[
-1.708472,
52.4464
],
[
-1.708457,
52.446355
],
[
-1.708399,
52.446274
],
[
-1.708282,
52.446166
],
[
-1.708135,
52.446049
],
[
-1.708004,
52.445977
],
[
-1.70791,
52.445942
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Road Improvement Or Upgrading
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 3
- Record created
- Wed, Jul 15, 2026 11:31 AM
- Record versioned
- Tue, Jul 28, 2026 3:03 AM
- Coordinate source
- Geometry
Driving on the M42? See every live closure, roadwork and planned restriction on this road.
M42 live closuresRelated incidents
A45 clockwise M42 Jct 6 (Bickenhill Interchange) partial roundabout closure (from the M42 northbound entry slip to the M42 southbound exit slip)
Active Roadworks National HighwaysExpected to clear in 4 months 4 weeks
A45 clockwise M42 Jct 6 (Bickenhill Interchange) partial roundabout closure (from the M42 northbound entry slip to the M42 southbound exit slip)
Lane 1 closure northbound (closing ERA)
Active Roadworks National HighwaysExpected to clear in 4 months 3 weeks
Lane 1 closure northbound (closing ERA)
Lane closure
Active Roadworks National HighwaysExpected to clear in 3 months 1 week
lane closure
M6 Southbound Jct 6 to Jct 5 carriageway closure
Planned Roadworks National HighwaysStarts in 8 hours 2 minutes
M6 Southbound Jct 6 to Jct 5 carriageway closure
M42 southbound Jct 9 entry slip road closure
Planned Roadworks National HighwaysStarts in 8 hours 2 minutes
M42 southbound Jct 9 entry slip road closure
M6 southbound Jct 4a to M42 Jct 8 northbound link road closure
Planned Roadworks National HighwaysStarts in 8 hours 2 minutes
M6 southbound Jct 4a to M42 Jct 8 northbound link road closure