M40 Southbound Jct 8 to Jct 7 OX lane 2 closure

Cleared

M40 Southbound Jct 8 to Jct 7 OX lane 2 closure

Start time
Mon, Jul 20, 2026 9:15 PM
Expected end
Tue, Jul 21, 2026 5:00 AM
Duration
7 hours 45 minutes
Road
M40 – A40 Eastbound Between A4142 And M40
Category
Road Maintenance
Direction
Eastbound
Carriageway
Dual Carriageway
Lanes affected
Lane 2 closed, 1 of 1 lanes affected, 1 of 2 lanes affected
Reason
Repair Work
Live incident
Active roadworks
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Thu, Jan 22, 2026 7:56 AM
Last updated
Tue, Jul 21, 2026 4:29 AM
Cleared
Tue, Jul 21, 2026 5:00 AM
  • Latest update: M40 Southbound Jct 8 to Jct 7 OX lane 2 closure
Coordinates
51.739931, -1.105676
Latitude span
51.738628 – 51.741228
Longitude span
-1.108062 – -1.103262
Bounding box centre
51.739928, -1.105662
Location descriptions
  • A40 eastbound between A4142 and M40
  • M40 J8 southbound access
Feed validity status
Planned
Overall feed start
Mon, Jul 20, 2026 9:15 PM
Overall feed end
Tue, Jul 21, 2026 5:00 AM
Feed window length
7 hours 45 minutes
Probability code (raw)
probable
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
other
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

5 coordinate pairs
Description
A40 eastbound between A4142 and M40
Carriageway
Dual Carriageway
Lane Usage
Cl2
Lane Number
2
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
1 lane restricted
Operational Lanes
1 operational lane
Direction On Section
East Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M40
Linear Element Model
The Network Model
Linear Element Id
{A5E4DCC5-CE2A-4A5B-936F-B1294781CB12}
Linear Element Type
B Carriageway
From Distance
0 m
To Distance
209 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
51.74074 -1.107174
51.740684 -1.107074
51.740311 -1.106401
51.739746 -1.10534
51.739509 -1.104881

Segment 2

2 coordinate pairs
Description
A40 eastbound between A4142 and M40
Carriageway
Dual Carriageway
Lane Usage
Cl2
Lane Number
2
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
1 lane restricted
Operational Lanes
1 operational lane
Direction On Section
East Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M40
Linear Element Model
The Network Model
Linear Element Id
{E2B7302B-0979-4AA7-AAB4-C93874D9C937}
Linear Element Type
B Carriageway
From Distance
44 m
To Distance
126 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
51.741228 -1.108062
51.74074 -1.107174

Segment 3

4 coordinate pairs
Description
M40 J8 southbound access
Carriageway
Dual Carriageway
Lane Usage
Cl2
Lane Number
2
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
1 lane restricted
Operational Lanes
2 operational lanes
Direction On Section
South Bound
Direction Relative
Aligned
Height Grade
Start1 End2
Linear Element Road
M40
Linear Element Model
The Network Model
Linear Element Id
{2C3DFA4B-B4ED-4453-AF79-9E77207659C9}
Linear Element Type
B Carriageway Entry Slip
From Distance
0 m
To Distance
148 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
51.739509 -1.104881
51.739399 -1.104695
51.738743 -1.103492
51.738628 -1.103262
Geometry type
MultiLineString
Geometry points
11
First coordinate pair
-1.107174, 51.740740
Road section segments
1
Road section points
11
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                -1.107174,
                51.74074
            ],
            [
                -1.107074,
                51.740684
            ],
            [
                -1.106401,
                51.740311
            ],
            [
                -1.10534,
                51.739746
            ],
            [
                -1.104881,
                51.739509
            ],
            [
                -1.108062,
                51.741228
            ],
            [
                -1.107174,
                51.74074
            ],
            [
                -1.104881,
                51.739509
            ],
            [
                -1.104695,
                51.739399
            ],
            [
                -1.103492,
                51.738743
            ],
            [
                -1.103262,
                51.738628
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            -1.107174,
            51.74074
        ],
        [
            -1.107074,
            51.740684
        ],
        [
            -1.106401,
            51.740311
        ],
        [
            -1.10534,
            51.739746
        ],
        [
            -1.104881,
            51.739509
        ],
        [
            -1.108062,
            51.741228
        ],
        [
            -1.107174,
            51.74074
        ],
        [
            -1.104881,
            51.739509
        ],
        [
            -1.104695,
            51.739399
        ],
        [
            -1.103492,
            51.738743
        ],
        [
            -1.103262,
            51.738628
        ]
    ]
]
Cause type
Road Maintenance
Detailed cause
Repair Work
Compliance
Mandatory
Probability
Probable
Validity status
Planned
Road management
Other
Feed provider
National Highways
Data source
Roadworks
Feed version
3
Record created
Thu, Jan 22, 2026 7:56 AM
Record versioned
Tue, Jul 21, 2026 4:29 AM
Coordinate source
Geometry

Driving on the M40? See every live closure, roadwork and planned restriction on this road.

M40 live closures

Related incidents

M40 southbound, Jct 12 to Jct 11, lane 1 and 2 closure

Planned Roadworks National Highways
Bicester M40 · M40 Southbound Between J12 And J11

Expected to clear in 2 hours 44 minutes

Started 4 Aug 2026, 20:00 Expected clear 5 Aug 2026, 05:00

M40 southbound, Jct 12 to Jct 11, lane 1 and 2 closure

Category: Road Maintenance
View update

M40 Southbound Jct 5 to Jct 4 lane 3 and 2 closure

Planned Roadworks National Highways
Wycombe M40 · M40 Southbound Between J5 And J4

Starts in 18 hours 59 minutes

Starts 5 Aug 2026, 21:15 Expected clear 6 Aug 2026, 05:00

M40 Southbound Jct 5 to Jct 4 lane 3 and 2 closure

Category: Road Maintenance
View update

M40 northbound, Jct 5 exit slip road closure

Planned Roadworks National Highways
Wycombe M40 · M40 J5 Northbound Exit

Starts in 18 hours 59 minutes

Starts 5 Aug 2026, 21:15 Expected clear 6 Aug 2026, 05:00

M40 northbound, Jct 5 exit slip road closure

Category: Road Maintenance
View update

M40 Southbound, Jct 11 to Jct 10, hard shoulder, lane 1 and 2 closure.

Planned Roadworks National Highways
Bicester M40 · M40 Southbound Between J11 And J10

Starts in 17 hours 44 minutes

Starts 5 Aug 2026, 20:00 Expected clear 6 Aug 2026, 05:00

M40 Southbound, Jct 11 to Jct 10, hard shoulder, lane 1 and 2 closure.

Category: Road Maintenance
View update

Lane 3 closure southbound

Planned Roadworks National Highways
Royal Leamington Spa M40 · Link Road From M42 J3A Northbound To M40 Southbound

Starts in 17 hours 44 minutes

Starts 5 Aug 2026, 20:00 Expected clear 6 Aug 2026, 05:00

Lane 3 closure southbound

Category: Road Maintenance
View update

M40 Southbound Jct 11 to Jct 10 lane 1 and lane 2 closures.

Planned Roadworks National Highways
Bicester M40 · M40 Southbound Between J11 And J10

Starts in 17 hours 44 minutes

Starts 5 Aug 2026, 20:00 Expected clear 6 Aug 2026, 05:00

M40 Southbound Jct 11 to Jct 10 lane 1 and lane 2 closures.

Category: Road Maintenance
View update