M40 southbound, Jct 5 entry slip road closure
ClearedM40 southbound, Jct 5 entry slip road closure
- Start time
- Fri, Jul 10, 2026 9:15 PM
- Expected end
- Sat, Jul 11, 2026 5:00 AM
- Duration
- 4 hours 2 seconds
- Road
- M40 – M40 Southbound Between J5 And J4
- Category
- Construction Work
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Road Improvement Or Upgrading
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Jan 13, 2026 1:18 PM
- Last updated
- Sat, Jul 11, 2026 12:41 AM
- Cleared
- Sat, Jul 11, 2026 1:15 AM
- Latest update: M40 southbound, Jct 5 entry slip road closure
- Coordinates
- 51.659627, -0.908562
- Latitude span
- 51.658078 – 51.660983
- Longitude span
- -0.912291 – -0.903916
- Bounding box centre
- 51.659531, -0.908104
- Location descriptions
-
- M40 southbound between J5 and J4
- M40 J5 southbound access
- M40 J5 southbound exit
- Feed validity status
- Planned
- Overall feed start
- Fri, Jul 10, 2026 9:15 PM
- Overall feed end
- Sat, Jul 11, 2026 5:00 AM
- Feed window length
- 7 hours 45 minutes
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- M40 southbound between J5 and J4
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 4 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {78BD5207-76B6-4C51-AE59-D59BA8BA8DFB}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 161 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.658737 -0.906002 51.65866 -0.905725 51.658419 -0.904936 51.658299 -0.904534 51.658078 -0.903916
Segment 2
6 coordinate pairs- Description
- M40 J5 southbound access
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {BD5CA716-747C-46D2-B527-F44088858FDD}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 480 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.660779 -0.912122 51.660316 -0.91063 51.660029 -0.909755 51.659788 -0.909057 51.659031 -0.906858 51.658737 -0.906002
Segment 3
4 coordinate pairs- Description
- M40 J5 southbound exit
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {8F80F15B-7CA9-439A-9A58-299663D429E7}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 20 m
- To Distance
- 46 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.660983 -0.912291 51.660915 -0.912263 51.660852 -0.912222 51.660779 -0.912122
- Geometry type
- MultiLineString
- Geometry points
- 15
- First coordinate pair
- -0.906002, 51.658737
- Road section segments
- 1
- Road section points
- 15
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.906002,
51.658737
],
[
-0.905725,
51.65866
],
[
-0.904936,
51.658419
],
[
-0.904534,
51.658299
],
[
-0.903916,
51.658078
],
[
-0.912122,
51.660779
],
[
-0.91063,
51.660316
],
[
-0.909755,
51.660029
],
[
-0.909057,
51.659788
],
[
-0.906858,
51.659031
],
[
-0.906002,
51.658737
],
[
-0.912291,
51.660983
],
[
-0.912263,
51.660915
],
[
-0.912222,
51.660852
],
[
-0.912122,
51.660779
]
]
]
}
View road section coordinates
[
[
[
-0.906002,
51.658737
],
[
-0.905725,
51.65866
],
[
-0.904936,
51.658419
],
[
-0.904534,
51.658299
],
[
-0.903916,
51.658078
],
[
-0.912122,
51.660779
],
[
-0.91063,
51.660316
],
[
-0.909755,
51.660029
],
[
-0.909057,
51.659788
],
[
-0.906858,
51.659031
],
[
-0.906002,
51.658737
],
[
-0.912291,
51.660983
],
[
-0.912263,
51.660915
],
[
-0.912222,
51.660852
],
[
-0.912122,
51.660779
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Road Improvement Or Upgrading
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Tue, Jan 13, 2026 1:18 PM
- Record versioned
- Sat, Jul 11, 2026 12:41 AM
- Coordinate source
- Geometry
Driving on the M40? See every live closure, roadwork and planned restriction on this road.
M40 live closuresRelated incidents
M40 Southbound, Jct 8a exit slip road lane one closure
Planned Roadworks National HighwaysExpected to clear in 9 hours 29 minutes
M40 Southbound, Jct 8a exit slip road lane one closure
M40 Southbound, Jct 11 to Jct 10, lane 1 and 2 closure.
Planned Roadworks National HighwaysStarts in 11 hours 29 minutes
M40 Southbound, Jct 11 to Jct 10, lane 1 and 2 closure.
M40 northbound, Jct 9 to Jct 10, lane 3 and 2 closure
Planned Roadworks National HighwaysStarts in 11 hours 29 minutes
M40 northbound, Jct 9 to Jct 10, lane 3 and 2 closure
M40 Southbound, Jct 11 to Jct 10 lane 2 and 3 closure
Cleared Roadworks National HighwaysExpected to clear in 20 hours 29 minutes
M40 Southbound, Jct 11 to Jct 10 lane 2 and 3 closure
M40 Southbound Jct 5 to Jct 4 lane 3 and 2 closure
Cleared Roadworks National HighwaysExpected to clear in 20 hours 29 minutes
M40 Southbound Jct 5 to Jct 4 lane 3 and 2 closure
M40 Southbound, Jct 12 to Jct 11, lane 3 and 2 closure.
Planned Roadworks National HighwaysStarts in 11 hours 29 minutes
M40 Southbound, Jct 12 to Jct 11, lane 3 and 2 closure.