M40 Southbound Jct 4 exit slip road closure
ClearedM40 Southbound Jct 4 exit slip road closure
- Start time
- Sat, Jul 4, 2026 9:15 PM
- Expected end
- Sun, Jul 5, 2026 5:00 AM
- Duration
- 1 second
- Road
- M40 – M40 J4 Southbound Exit
- Category
- Road Maintenance
- Direction
- Southbound
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Jun 4, 2026 11:20 AM
- Last updated
- Sat, Jul 4, 2026 4:46 AM
- Cleared
- Sat, Jul 4, 2026 9:15 PM
- Latest update: M40 Southbound Jct 4 exit slip road closure
- Coordinates
- 51.612549, -0.769871
- Latitude span
- 51.612422 – 51.612739
- Longitude span
- -0.770119 – -0.769592
- Bounding box centre
- 51.612581, -0.769856
- Location descriptions
-
- M40 J4 southbound exit
- Feed validity status
- Planned
- Overall feed start
- Sat, Jul 4, 2026 9:15 PM
- Overall feed end
- Sun, Jul 5, 2026 5:00 AM
- Feed window length
- 7 hours 45 minutes
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- M40 J4 southbound exit
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {DCA8F35E-48F2-4A8B-8AAE-2A57CB7C967B}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 44 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.612458 -0.770025 51.612564 -0.769797 51.612654 -0.769665 51.612739 -0.769592
Segment 2
2 coordinate pairs- Description
- M40 J4 southbound exit
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {BF5C6AB8-5941-4E82-BAA5-0172908D626F}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 390 m
- To Distance
- 398 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.612422 -0.770119 51.612458 -0.770025
- Geometry type
- MultiLineString
- Geometry points
- 6
- First coordinate pair
- -0.770025, 51.612458
- Road section segments
- 1
- Road section points
- 6
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.770025,
51.612458
],
[
-0.769797,
51.612564
],
[
-0.769665,
51.612654
],
[
-0.769592,
51.612739
],
[
-0.770119,
51.612422
],
[
-0.770025,
51.612458
]
]
]
}
View road section coordinates
[
[
[
-0.770025,
51.612458
],
[
-0.769797,
51.612564
],
[
-0.769665,
51.612654
],
[
-0.769592,
51.612739
],
[
-0.770119,
51.612422
],
[
-0.770025,
51.612458
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 3
- Record created
- Thu, Jun 4, 2026 11:20 AM
- Record versioned
- Sat, Jul 4, 2026 4:46 AM
- Coordinate source
- Geometry
Driving on the M40? See every live closure, roadwork and planned restriction on this road.
M40 live closuresRelated incidents
M40 Southbound, Jct 8a exit slip road lane one closure
Planned Roadworks National HighwaysExpected to clear in 8 hours 42 minutes
M40 Southbound, Jct 8a exit slip road lane one closure
M40 Northbound Jct 4 to Jct 5 hardshoulder closure
Planned Roadworks National HighwaysExpected to clear in 13 hours 41 minutes
M40 Northbound Jct 4 to Jct 5 hardshoulder closure
M40 Southbound, Jct 7 to Jct 6 hard shoulder closure
Active Roadworks National HighwaysExpected to clear in 13 hours 41 minutes
M40 Southbound, Jct 7 to Jct 6 hard shoulder closure
M40 Southbound, Jct 11 to Jct 10 lane 2 and 3 closure
Cleared Roadworks National HighwaysExpected to clear in 19 hours 42 minutes
M40 Southbound, Jct 11 to Jct 10 lane 2 and 3 closure
M40 Southbound Jct 2 to Jct 1a hard shoulder, lane 1 and 2 closure
Cleared Roadworks National HighwaysExpected to clear in 19 hours 42 minutes
M40 Southbound Jct 2 to Jct 1a hard shoulder, lane 1 and 2 closure
M40 northbound, Jct 9 to Jct 10, lane 3 and 2 closure
Planned Roadworks National HighwaysStarts in 10 hours 42 minutes
M40 northbound, Jct 9 to Jct 10, lane 3 and 2 closure