M40 Southbound, Jct 2 to Jct 1a, hard shoulder closure.
ClearedM40 Southbound, Jct 2 to Jct 1a, hard shoulder closure.
- Start time
- Fri, Jul 24, 2026 6:00 AM
- Expected end
- Fri, Jul 24, 2026 6:00 PM
- Duration
- 12 hours
- Road
- M40 – M40 Southbound Between J2 And J1A
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Jul 9, 2026 3:15 PM
- Last updated
- Fri, Jul 24, 2026 5:37 PM
- Cleared
- Fri, Jul 24, 2026 6:00 PM
- Latest update: M40 Southbound, Jct 2 to Jct 1a, hard shoulder closure.
- Coordinates
- 51.590779, -0.615302
- Latitude span
- 51.589085 – 51.591479
- Longitude span
- -0.617653 – -0.609580
- Bounding box centre
- 51.590282, -0.613617
- Location descriptions
-
- M40 southbound between J2 and J1A
- Feed validity status
- Planned
- Overall feed start
- Fri, Jul 24, 2026 6:00 AM
- Overall feed end
- Fri, Jul 24, 2026 6:00 PM
- Feed window length
- 12 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- M40 southbound between J2 and J1A
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 5 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {875BE831-F8B6-48ED-A93E-E31959A664F3}
- Linear Element Type
- B Carriageway
- From Distance
- 289 m
- To Distance
- 363 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.591479 -0.617653 51.591212 -0.616756 51.591191 -0.616699
Segment 2
5 coordinate pairs- Description
- M40 southbound between J2 and J1A
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 5 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {16524750-4191-49F0-81E2-2781BC2BE10D}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 546 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.591191 -0.616699 51.59119 -0.616697 51.590866 -0.615597 51.590019 -0.612734 51.589085 -0.60958
- Geometry type
- MultiLineString
- Geometry points
- 8
- First coordinate pair
- -0.617653, 51.591479
- Road section segments
- 1
- Road section points
- 8
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.617653,
51.591479
],
[
-0.616756,
51.591212
],
[
-0.616699,
51.591191
],
[
-0.616699,
51.591191
],
[
-0.616697,
51.59119
],
[
-0.615597,
51.590866
],
[
-0.612734,
51.590019
],
[
-0.60958,
51.589085
]
]
]
}
View road section coordinates
[
[
[
-0.617653,
51.591479
],
[
-0.616756,
51.591212
],
[
-0.616699,
51.591191
],
[
-0.616699,
51.591191
],
[
-0.616697,
51.59119
],
[
-0.615597,
51.590866
],
[
-0.612734,
51.590019
],
[
-0.60958,
51.589085
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Jul 9, 2026 3:15 PM
- Record versioned
- Fri, Jul 24, 2026 5:37 PM
- Coordinate source
- Geometry
Driving on the M40? See every live closure, roadwork and planned restriction on this road.
M40 live closuresRelated incidents
M40 Southbound Jct 5 to Jct 4 lane 3 and 2 closure
Planned Roadworks National HighwaysExpected to clear in 1 hour 18 minutes
M40 Southbound Jct 5 to Jct 4 lane 3 and 2 closure
M40 lane closures southbound (up to 4.05k)
Planned Roadworks National HighwaysExpected to clear in 1 hour 18 minutes
M40 lane closures southbound (up to 4.05k)
M40 northbound, Jct 9 to Jct 10, lane 3 and 2 closure
Planned Roadworks National HighwaysStarts in 16 hours 18 minutes
M40 northbound, Jct 9 to Jct 10, lane 3 and 2 closure
M40 Southbound, Jct 11 to Jct 10, hard shoulder, lane 1 and 2 closure.
Planned Roadworks National HighwaysStarts in 16 hours 18 minutes
M40 Southbound, Jct 11 to Jct 10, hard shoulder, lane 1 and 2 closure.
M40 Southbound, Jct 13 to Jct 12 lane 2 and 3 closure
Planned Roadworks National HighwaysStarts in 16 hours 18 minutes
M40 Southbound, Jct 13 to Jct 12 lane 2 and 3 closure
M40 southbound, Jct 12 to Jct 11, lane 1 and 2 closure
Planned Roadworks National HighwaysStarts in 16 hours 18 minutes
M40 southbound, Jct 12 to Jct 11, lane 1 and 2 closure