M40 Southbound, Jct 14 to Jct 13, hard shoulder closure.
ClearedM40 Southbound, Jct 14 to Jct 13, hard shoulder closure.
- Start time
- Thu, Sep 24, 2026 9:01 AM
- Expected end
- Thu, Sep 24, 2026 10:59 PM
- Duration
- 13 hours 29 minutes 1 second
- Road
- M40 – M40 Southbound Between J13 And J12
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Sep 24, 2026 9:08 AM
- Last updated
- Thu, Sep 24, 2026 10:05 PM
- Cleared
- Thu, Sep 24, 2026 10:30 PM
- Latest update: M40 Southbound, Jct 14 to Jct 13, hard shoulder closure.
- Coordinates
- 52.231467, -1.533362
- Latitude span
- 52.230150 – 52.232886
- Longitude span
- -1.536803 – -1.529801
- Bounding box centre
- 52.231518, -1.533302
- Location descriptions
-
- M40 southbound between J13 and J12
- Feed validity status
- Active
- Overall feed start
- Thu, Sep 24, 2026 9:01 AM
- Overall feed end
- Thu, Sep 24, 2026 10:59 PM
- Feed window length
- 13 hours 58 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- M40 southbound between J13 and J12
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {4F720C61-9DDF-4387-80C0-5A71FE6C80A1}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 313 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.231548 -1.533779 52.231082 -1.532548 52.230588 -1.531147 52.230275 -1.530184 52.23015 -1.529801
Segment 2
4 coordinate pairs- Description
- M40 southbound between J13 and J12
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {3E2C4451-C319-4506-8EA7-519B0A7B37D5}
- Linear Element Type
- B Carriageway
- From Distance
- 954 m
- To Distance
- 1,209 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.232886 -1.536803 52.232825 -1.536676 52.232302 -1.535545 52.231548 -1.533779
- Geometry type
- MultiLineString
- Geometry points
- 9
- First coordinate pair
- -1.533779, 52.231548
- Road section segments
- 1
- Road section points
- 9
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.533779,
52.231548
],
[
-1.532548,
52.231082
],
[
-1.531147,
52.230588
],
[
-1.530184,
52.230275
],
[
-1.529801,
52.23015
],
[
-1.536803,
52.232886
],
[
-1.536676,
52.232825
],
[
-1.535545,
52.232302
],
[
-1.533779,
52.231548
]
]
]
}
View road section coordinates
[
[
[
-1.533779,
52.231548
],
[
-1.532548,
52.231082
],
[
-1.531147,
52.230588
],
[
-1.530184,
52.230275
],
[
-1.529801,
52.23015
],
[
-1.536803,
52.232886
],
[
-1.536676,
52.232825
],
[
-1.535545,
52.232302
],
[
-1.533779,
52.231548
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Sep 24, 2026 9:08 AM
- Record versioned
- Thu, Sep 24, 2026 10:05 PM
- Coordinate source
- Geometry
Driving on the M40? See every live closure, roadwork and planned restriction on this road.
M40 live closuresRelated incidents
Hard shoulder closure northbound
Planned Roadworks National HighwaysExpected to clear in 1 hour 27 minutes
Hard shoulder closure northbound
M40 Southbound, Jct 10 to Jct 9 hard shoulder closure
Planned Roadworks National HighwaysExpected to clear in 3 hours 27 minutes
M40 Southbound, Jct 10 to Jct 9 hard shoulder closure
M40 Northbound, Jct 11 entry slip road closure
Planned Roadworks National HighwaysStarts in 6 hours 42 minutes
M40 Northbound, Jct 11 entry slip road closure
M40 Southbound, Jct 11 to Jct 10 hard shoulder, lane 1 and 2 closure
Cleared Roadworks National HighwaysExpected to clear in 14 hours 27 minutes
M40 Southbound, Jct 11 to Jct 10 hard shoulder, lane 1 and 2 closure
M40 Southbound Jct 5 to Jct 4 hard shoulder and lane 1 and 2 closure
Planned Roadworks National HighwaysStarts in 5 hours 27 minutes
M40 Southbound Jct 5 to Jct 4 hard shoulder and lane 1 and 2 closure
M40 Southbound Jct 4 to Jct 3 lane 3 and lane 2 closures.
Planned Roadworks National HighwaysStarts in 5 hours 27 minutes
M40 Southbound Jct 4 to Jct 3 lane 3 and lane 2 closures.