M40 Southbound Jct 10 to Jct 9, hardshoulder closure
ClearedM40 Southbound Jct 10 to Jct 9, hardshoulder closure
- Start time
- Fri, Jul 24, 2026 7:00 AM
- Expected end
- Fri, Jul 24, 2026 4:00 PM
- Duration
- 1 hour 50 minutes 2 seconds
- Road
- M40 – M40 Southbound Between J10 And J9
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Jul 20, 2026 1:27 PM
- Last updated
- Fri, Jul 24, 2026 8:32 AM
- Cleared
- Fri, Jul 24, 2026 8:50 AM
- Latest update: M40 Southbound Jct 10 to Jct 9, hardshoulder closure
- Coordinates
- 51.929277, -1.201798
- Latitude span
- 51.928602 – 51.931008
- Longitude span
- -1.201831 – -1.201715
- Bounding box centre
- 51.929805, -1.201773
- Location descriptions
-
- M40 southbound between J10 and J9
- Feed validity status
- Planned
- Overall feed start
- Fri, Jul 24, 2026 7:00 AM
- Overall feed end
- Fri, Jul 24, 2026 4:00 PM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- M40 southbound between J10 and J9
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {3845C451-118E-4BE1-B410-0A748C8AAE64}
- Linear Element Type
- B Carriageway
- From Distance
- 1,051 m
- To Distance
- 1,302 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.931008 -1.201715 51.929816 -1.201774 51.928753 -1.201822
Segment 2
3 coordinate pairs- Description
- M40 southbound between J10 and J9
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {2E13C270-C586-435B-B084-A82D5D315F3F}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 16 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.928753 -1.201822 51.928728 -1.201823 51.928602 -1.201831
- Geometry type
- MultiLineString
- Geometry points
- 6
- First coordinate pair
- -1.201715, 51.931008
- Road section segments
- 1
- Road section points
- 6
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.201715,
51.931008
],
[
-1.201774,
51.929816
],
[
-1.201822,
51.928753
],
[
-1.201822,
51.928753
],
[
-1.201823,
51.928728
],
[
-1.201831,
51.928602
]
]
]
}
View road section coordinates
[
[
[
-1.201715,
51.931008
],
[
-1.201774,
51.929816
],
[
-1.201822,
51.928753
],
[
-1.201822,
51.928753
],
[
-1.201823,
51.928728
],
[
-1.201831,
51.928602
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Jul 20, 2026 1:27 PM
- Record versioned
- Fri, Jul 24, 2026 8:32 AM
- Coordinate source
- Geometry
Driving on the M40? See every live closure, roadwork and planned restriction on this road.
M40 live closuresRelated incidents
M40 northbound, Jct 5 exit slip road closure
Planned Roadworks National HighwaysStarts in 8 hours 49 minutes
M40 northbound, Jct 5 exit slip road closure
M40 Southbound Jct 5 to Jct 4 lane 3 and 2 closure
Planned Roadworks National HighwaysStarts in 8 hours 49 minutes
M40 Southbound Jct 5 to Jct 4 lane 3 and 2 closure
M40 Southbound Jct 11 to Jct 10 lane 1 and lane 2 closures.
Planned Roadworks National HighwaysStarts in 7 hours 34 minutes
M40 Southbound Jct 11 to Jct 10 lane 1 and lane 2 closures.
M40 Southbound, Jct 11 to Jct 10, hard shoulder, lane 3 and 2 closure.
Planned Roadworks National HighwaysStarts in 7 hours 34 minutes
M40 Southbound, Jct 11 to Jct 10, hard shoulder, lane 3 and 2 closure.
Lane 3 closure southbound
Planned Roadworks National HighwaysStarts in 7 hours 34 minutes
Lane 3 closure southbound
M40 Southbound, Jct 11 to Jct 10 lane 2 and 3 closure
Cleared Roadworks National HighwaysExpected to clear in 16 hours 34 minutes
M40 Southbound, Jct 11 to Jct 10 lane 2 and 3 closure