M4 eastbound Jct 18 - lane closure (172/3 to 170/0)
ClearedM4 eastbound Jct 18 - lane closure (172/3 to 170/0)
- Start time
- Sun, Oct 4, 2026 8:00 PM
- Expected end
- Mon, Oct 5, 2026 5:00 AM
- Duration
- 15 minutes 1 second
- Road
- M4 – M4 Eastbound Between J19 And J18
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- 1 of 3 lanes affected, 1 of 2 lanes affected
- Reason
- Repair Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Sep 30, 2026 8:20 AM
- Last updated
- Sun, Oct 4, 2026 7:52 PM
- Cleared
- Sun, Oct 4, 2026 8:15 PM
- Latest update: M4 eastbound Jct 18 - lane closure (172/3 to 170/0)
- Coordinates
- 51.499651, -2.371690
- Latitude span
- 51.498008 – 51.501723
- Longitude span
- -2.390656 – -2.358474
- Bounding box centre
- 51.499866, -2.374565
- Location descriptions
-
- M4 eastbound between J19 and J18
- M4 J18 eastbound exit
- Feed validity status
- Planned
- Overall feed start
- Sun, Oct 4, 2026 8:00 PM
- Overall feed end
- Mon, Oct 5, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
31 coordinate pairs- Description
- M4 eastbound between J19 and J18
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M4
- Linear Element Model
- The Network Model
- Linear Element Id
- {AE403C52-5D62-47F7-9FDF-592C93083448}
- Linear Element Type
- B Carriageway
- From Distance
- 2,797 m
- To Distance
- 4,868 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.498015 -2.390656 51.498019 -2.39034 51.498014 -2.389332 51.498008 -2.388179 51.498021 -2.387185 51.498026 -2.386739 51.498046 -2.384981 51.498086 -2.383743 51.498231 -2.38056 51.498297 -2.379567 51.498447 -2.37771 51.498459 -2.377599 51.498531 -2.376904 51.498596 -2.376112 51.498616 -2.375939 51.498726 -2.374975 51.498864 -2.373852 51.499141 -2.371737 51.499379 -2.370241 51.499709 -2.368298 51.499901 -2.367248 51.500221 -2.365668 51.500367 -2.364947 51.500422 -2.364645 51.500495 -2.364372 51.500622 -2.363768 51.500896 -2.36256 51.500987 -2.362143 51.501005 -2.362044 51.501097 -2.361553 51.501124 -2.361438
Segment 2
7 coordinate pairs- Description
- M4 J18 eastbound exit
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M4
- Linear Element Model
- The Network Model
- Linear Element Id
- {DEA95468-DA18-4D1C-A7EF-D4998BEAE254}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 217 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.501124 -2.361438 51.501297 -2.360949 51.501406 -2.36046 51.50151 -2.359859 51.501589 -2.359396 51.501708 -2.35859 51.501723 -2.358474
- Geometry type
- MultiLineString
- Geometry points
- 38
- First coordinate pair
- -2.390656, 51.498015
- Road section segments
- 1
- Road section points
- 38
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.390656,
51.498015
],
[
-2.39034,
51.498019
],
[
-2.389332,
51.498014
],
[
-2.388179,
51.498008
],
[
-2.387185,
51.498021
],
[
-2.386739,
51.498026
],
[
-2.384981,
51.498046
],
[
-2.383743,
51.498086
],
[
-2.38056,
51.498231
],
[
-2.379567,
51.498297
],
[
-2.37771,
51.498447
],
[
-2.377599,
51.498459
],
[
-2.376904,
51.498531
],
[
-2.376112,
51.498596
],
[
-2.375939,
51.498616
],
[
-2.374975,
51.498726
],
[
-2.373852,
51.498864
],
[
-2.371737,
51.499141
],
[
-2.370241,
51.499379
],
[
-2.368298,
51.499709
],
[
-2.367248,
51.499901
],
[
-2.365668,
51.500221
],
[
-2.364947,
51.500367
],
[
-2.364645,
51.500422
],
[
-2.364372,
51.500495
],
[
-2.363768,
51.500622
],
[
-2.36256,
51.500896
],
[
-2.362143,
51.500987
],
[
-2.362044,
51.501005
],
[
-2.361553,
51.501097
],
[
-2.361438,
51.501124
],
[
-2.361438,
51.501124
],
[
-2.360949,
51.501297
],
[
-2.36046,
51.501406
],
[
-2.359859,
51.50151
],
[
-2.359396,
51.501589
],
[
-2.35859,
51.501708
],
[
-2.358474,
51.501723
]
]
]
}
View road section coordinates
[
[
[
-2.390656,
51.498015
],
[
-2.39034,
51.498019
],
[
-2.389332,
51.498014
],
[
-2.388179,
51.498008
],
[
-2.387185,
51.498021
],
[
-2.386739,
51.498026
],
[
-2.384981,
51.498046
],
[
-2.383743,
51.498086
],
[
-2.38056,
51.498231
],
[
-2.379567,
51.498297
],
[
-2.37771,
51.498447
],
[
-2.377599,
51.498459
],
[
-2.376904,
51.498531
],
[
-2.376112,
51.498596
],
[
-2.375939,
51.498616
],
[
-2.374975,
51.498726
],
[
-2.373852,
51.498864
],
[
-2.371737,
51.499141
],
[
-2.370241,
51.499379
],
[
-2.368298,
51.499709
],
[
-2.367248,
51.499901
],
[
-2.365668,
51.500221
],
[
-2.364947,
51.500367
],
[
-2.364645,
51.500422
],
[
-2.364372,
51.500495
],
[
-2.363768,
51.500622
],
[
-2.36256,
51.500896
],
[
-2.362143,
51.500987
],
[
-2.362044,
51.501005
],
[
-2.361553,
51.501097
],
[
-2.361438,
51.501124
],
[
-2.361438,
51.501124
],
[
-2.360949,
51.501297
],
[
-2.36046,
51.501406
],
[
-2.359859,
51.50151
],
[
-2.359396,
51.501589
],
[
-2.35859,
51.501708
],
[
-2.358474,
51.501723
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Repair Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Wed, Sep 30, 2026 8:20 AM
- Record versioned
- Sun, Oct 4, 2026 7:52 PM
- Coordinate source
- Geometry
Driving on the M4? See every live closure, roadwork and planned restriction on this road.
M4 live closuresRelated incidents
M48 eastbound Jct 2 to Jct 1 hard shoulder closure 199/9-194/6
Planned Roadworks National HighwaysExpected to clear in 4 days 11 hours
M48 eastbound Jct 2 to Jct 1 hard shoulder closure 199/9-194/6
A466 : Both directions : M48 J2 Newhouse to A48 Interchange : Resurfacing work : Road closed : Diversions in place : 12/10/26-15/10/26 2000-0600 :
Active Roadworks Traffic WalesDescription: A466 : Both directions : M48 J2 Newhouse to A48 Interchange : Resurfacing work : Road closed : Diversions in place : 12/10/26-15/10/26 2000-0600 :, Start time: 12/10/2026 20:00 , End Date: 15/10/2026 6:00, Severity: Road closure, Source: Welsh Government, Last updated: 09/10/2026 11:57
M4 Eastbound Jct 2 exit slip road closure
Planned Roadworks National HighwaysStarts in 3 hours 15 seconds
M4 Eastbound Jct 2 exit slip road closure
M4 Eastbound Jct 3 to Jct 2 lane 1 closure
Planned Roadworks National HighwaysStarts in 3 hours 15 seconds
M4 Eastbound Jct 3 to Jct 2 lane 1 closure
A40 eastbound lane 2 closure
Planned Roadworks National HighwaysStarts in 2 hours 15 seconds
A40 eastbound lane 2 closure
M5 Both Directions Jct 9 to Jct 15 mobile lane closures
Planned Roadworks National HighwaysStarts in 1 hour 15 seconds
M5 Both Directions Jct 9 to Jct 15 mobile lane closures