M3 Eastbound Jct 3 to Jct 2 Lane 1,2 closure
ClearedM3 Eastbound Jct 3 to Jct 2 Lane 1,2 closure
- Start time
- Mon, Jul 20, 2026 9:00 PM
- Expected end
- Tue, Jul 21, 2026 4:30 AM
- Duration
- 2 hours 15 minutes 1 second
- Road
- M3 – M3 Eastbound Between J3 And J2
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- 2 of 2 lanes affected
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Jul 20, 2026 8:48 PM
- Last updated
- Mon, Jul 20, 2026 10:39 PM
- Cleared
- Mon, Jul 20, 2026 11:15 PM
- Latest update: M3 Eastbound Jct 3 to Jct 2 Lane 1,2 closure
- Coordinates
- 51.390939, -0.566631
- Latitude span
- 51.386152 – 51.395900
- Longitude span
- -0.580521 – -0.554934
- Bounding box centre
- 51.391026, -0.567728
- Location descriptions
-
- M3 eastbound between J3 and J2
- Feed validity status
- Active
- Overall feed start
- Mon, Jul 20, 2026 9:00 PM
- Overall feed end
- Tue, Jul 21, 2026 4:30 AM
- Feed window length
- 7 hours 30 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- M3 eastbound between J3 and J2
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M3
- Linear Element Model
- The Network Model
- Linear Element Id
- {5ECD2732-E870-4FE0-B1FC-5F3076F1298C}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 79 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.395436 -0.555804 51.395744 -0.555215 51.3959 -0.554934
Segment 2
23 coordinate pairs- Description
- M3 eastbound between J3 and J2
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M3
- Linear Element Model
- The Network Model
- Linear Element Id
- {B65B95C1-5968-434F-AF02-E898979DDB88}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 1,822 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.386836 -0.577991 51.387031 -0.577305 51.387281 -0.576426 51.387695 -0.57497 51.388223 -0.573287 51.388847 -0.571357 51.389429 -0.569714 51.389699 -0.568952 51.39002 -0.568043 51.390512 -0.56677 51.390779 -0.566077 51.391006 -0.565522 51.391573 -0.564128 51.391851 -0.563457 51.392224 -0.562565 51.392578 -0.561759 51.392672 -0.561546 51.393189 -0.560393 51.393812 -0.559037 51.394266 -0.558107 51.394777 -0.557101 51.395204 -0.556261 51.395436 -0.555804
Segment 3
4 coordinate pairs- Description
- M3 eastbound between J3 and J2
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M3
- Linear Element Model
- The Network Model
- Linear Element Id
- {D87BDA3C-C86C-4A74-8094-249D0062A770}
- Linear Element Type
- B Carriageway
- From Distance
- 910 m
- To Distance
- 1,102 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.386152 -0.580521 51.386497 -0.579233 51.386652 -0.578654 51.386836 -0.577991
- Geometry type
- MultiLineString
- Geometry points
- 30
- First coordinate pair
- -0.555804, 51.395436
- Road section segments
- 1
- Road section points
- 30
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.555804,
51.395436
],
[
-0.555215,
51.395744
],
[
-0.554934,
51.3959
],
[
-0.577991,
51.386836
],
[
-0.577305,
51.387031
],
[
-0.576426,
51.387281
],
[
-0.57497,
51.387695
],
[
-0.573287,
51.388223
],
[
-0.571357,
51.388847
],
[
-0.569714,
51.389429
],
[
-0.568952,
51.389699
],
[
-0.568043,
51.39002
],
[
-0.56677,
51.390512
],
[
-0.566077,
51.390779
],
[
-0.565522,
51.391006
],
[
-0.564128,
51.391573
],
[
-0.563457,
51.391851
],
[
-0.562565,
51.392224
],
[
-0.561759,
51.392578
],
[
-0.561546,
51.392672
],
[
-0.560393,
51.393189
],
[
-0.559037,
51.393812
],
[
-0.558107,
51.394266
],
[
-0.557101,
51.394777
],
[
-0.556261,
51.395204
],
[
-0.555804,
51.395436
],
[
-0.580521,
51.386152
],
[
-0.579233,
51.386497
],
[
-0.578654,
51.386652
],
[
-0.577991,
51.386836
]
]
]
}
View road section coordinates
[
[
[
-0.555804,
51.395436
],
[
-0.555215,
51.395744
],
[
-0.554934,
51.3959
],
[
-0.577991,
51.386836
],
[
-0.577305,
51.387031
],
[
-0.576426,
51.387281
],
[
-0.57497,
51.387695
],
[
-0.573287,
51.388223
],
[
-0.571357,
51.388847
],
[
-0.569714,
51.389429
],
[
-0.568952,
51.389699
],
[
-0.568043,
51.39002
],
[
-0.56677,
51.390512
],
[
-0.566077,
51.390779
],
[
-0.565522,
51.391006
],
[
-0.564128,
51.391573
],
[
-0.563457,
51.391851
],
[
-0.562565,
51.392224
],
[
-0.561759,
51.392578
],
[
-0.561546,
51.392672
],
[
-0.560393,
51.393189
],
[
-0.559037,
51.393812
],
[
-0.558107,
51.394266
],
[
-0.557101,
51.394777
],
[
-0.556261,
51.395204
],
[
-0.555804,
51.395436
],
[
-0.580521,
51.386152
],
[
-0.579233,
51.386497
],
[
-0.578654,
51.386652
],
[
-0.577991,
51.386836
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Jul 20, 2026 8:48 PM
- Record versioned
- Mon, Jul 20, 2026 10:39 PM
- Coordinate source
- Geometry
Driving on the M3? See every live closure, roadwork and planned restriction on this road.
M3 live closuresRelated incidents
M25 Anti-Clockwise Jct 11 carriageway closure between the exit and entry slip road
Planned Roadworks National HighwaysStarts in 3 hours 4 minutes
M25 Anti-Clockwise Jct 11 carriageway closure between the exit and entry slip road
M3 northbound Jct 6 lane 1 closure on exit slip road and link to Black Dam roundabout
Cleared Roadworks National HighwaysExpected to clear in 10 hours 34 minutes
M3 northbound Jct 6 lane 1 closure on exit slip road and link to Black Dam roundabout
M3 northbound Jct 4 Lane 1 closure on exit slip road
Cleared Roadworks National HighwaysCleared 18 hours 10 minutes ago
M3 northbound Jct 4 Lane 1 closure on exit slip road
M3 northbound Jct 4 Lane 1 closure on exit slip road
Cleared Roadworks National HighwaysCleared 20 hours 30 minutes ago
M3 northbound Jct 4 Lane 1 closure on exit slip road
M3 northbound Jct 10 to Jct 8 carriageway closure
Cleared Roadworks National HighwaysCleared 15 hours 55 minutes ago
M3 northbound Jct 10 to Jct 8 carriageway closure
M25 Anti-clockwise Jct 11 to Jct 10 lane 1,2,3 closure
Cleared Roadworks National HighwaysCleared 1 day 17 hours ago
M25 Anti-clockwise Jct 11 to Jct 10 lane 1,2,3 closure