M25 Clockwise Jct 27 to Jct 28 lane 1,2,3 closure
ClearedM25 Clockwise Jct 27 to Jct 28 lane 1,2,3 closure
- Start time
- Fri, Sep 25, 2026 10:00 PM
- Expected end
- Sat, Sep 26, 2026 4:30 AM
- Duration
- 2 hours 30 minutes 2 seconds
- Road
- M25 – M25 Clockwise Between J27 And J28
- Category
- Road Maintenance
- Direction
- Clockwise
- Carriageway
- Dual Carriageway
- Lanes affected
- 3 of 2 lanes affected
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Sep 25, 2026 10:06 PM
- Last updated
- Sat, Sep 26, 2026 12:12 AM
- Cleared
- Sat, Sep 26, 2026 12:30 AM
- Latest update: M25 Clockwise Jct 27 to Jct 28 lane 1,2,3 closure
- Coordinates
- 51.664095, 0.164030
- Latitude span
- 51.658037 – 51.668496
- Longitude span
- 0.155652 – 0.174230
- Bounding box centre
- 51.663267, 0.164941
- Location descriptions
-
- M25 clockwise between J27 and J28
- Feed validity status
- Active
- Overall feed start
- Fri, Sep 25, 2026 10:00 PM
- Overall feed end
- Sat, Sep 26, 2026 4:30 AM
- Feed window length
- 6 hours 30 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
33 coordinate pairs- Description
- M25 clockwise between J27 and J28
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {405E48D9-BFC3-4441-A184-CFB4862930B7}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 1,573 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.667736 0.157893 51.66767 0.158078 51.667341 0.158872 51.667219 0.159156 51.666984 0.15968 51.666768 0.160161 51.666656 0.160402 51.666498 0.160698 51.666376 0.160981 51.665771 0.162081 51.665483 0.162573 51.665251 0.162967 51.665029 0.163318 51.664594 0.163962 51.664142 0.164592 51.663635 0.165247 51.663221 0.165777 51.663111 0.165902 51.663046 0.165979 51.662669 0.16643 51.66197 0.167293 51.661498 0.1679 51.661049 0.168501 51.66067 0.169059 51.660347 0.169548 51.659961 0.170188 51.659721 0.170617 51.659515 0.170991 51.659297 0.171425 51.658939 0.172126 51.658658 0.172742 51.658404 0.173323 51.658037 0.17423
Segment 2
7 coordinate pairs- Description
- M25 clockwise between J27 and J28
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {AFE20420-26EA-41D4-98FC-9DC8E272F585}
- Linear Element Type
- A Carriageway
- From Distance
- 27 m
- To Distance
- 204 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.668496 0.155652 51.66842 0.15593 51.668163 0.156728 51.667992 0.157183 51.667879 0.157494 51.667831 0.157623 51.667736 0.157893
- Geometry type
- MultiLineString
- Geometry points
- 40
- First coordinate pair
- 0.157893, 51.667736
- Road section segments
- 1
- Road section points
- 40
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
0.157893,
51.667736
],
[
0.158078,
51.66767
],
[
0.158872,
51.667341
],
[
0.159156,
51.667219
],
[
0.15968,
51.666984
],
[
0.160161,
51.666768
],
[
0.160402,
51.666656
],
[
0.160698,
51.666498
],
[
0.160981,
51.666376
],
[
0.162081,
51.665771
],
[
0.162573,
51.665483
],
[
0.162967,
51.665251
],
[
0.163318,
51.665029
],
[
0.163962,
51.664594
],
[
0.164592,
51.664142
],
[
0.165247,
51.663635
],
[
0.165777,
51.663221
],
[
0.165902,
51.663111
],
[
0.165979,
51.663046
],
[
0.16643,
51.662669
],
[
0.167293,
51.66197
],
[
0.1679,
51.661498
],
[
0.168501,
51.661049
],
[
0.169059,
51.66067
],
[
0.169548,
51.660347
],
[
0.170188,
51.659961
],
[
0.170617,
51.659721
],
[
0.170991,
51.659515
],
[
0.171425,
51.659297
],
[
0.172126,
51.658939
],
[
0.172742,
51.658658
],
[
0.173323,
51.658404
],
[
0.17423,
51.658037
],
[
0.155652,
51.668496
],
[
0.15593,
51.66842
],
[
0.156728,
51.668163
],
[
0.157183,
51.667992
],
[
0.157494,
51.667879
],
[
0.157623,
51.667831
],
[
0.157893,
51.667736
]
]
]
}
View road section coordinates
[
[
[
0.157893,
51.667736
],
[
0.158078,
51.66767
],
[
0.158872,
51.667341
],
[
0.159156,
51.667219
],
[
0.15968,
51.666984
],
[
0.160161,
51.666768
],
[
0.160402,
51.666656
],
[
0.160698,
51.666498
],
[
0.160981,
51.666376
],
[
0.162081,
51.665771
],
[
0.162573,
51.665483
],
[
0.162967,
51.665251
],
[
0.163318,
51.665029
],
[
0.163962,
51.664594
],
[
0.164592,
51.664142
],
[
0.165247,
51.663635
],
[
0.165777,
51.663221
],
[
0.165902,
51.663111
],
[
0.165979,
51.663046
],
[
0.16643,
51.662669
],
[
0.167293,
51.66197
],
[
0.1679,
51.661498
],
[
0.168501,
51.661049
],
[
0.169059,
51.66067
],
[
0.169548,
51.660347
],
[
0.170188,
51.659961
],
[
0.170617,
51.659721
],
[
0.170991,
51.659515
],
[
0.171425,
51.659297
],
[
0.172126,
51.658939
],
[
0.172742,
51.658658
],
[
0.173323,
51.658404
],
[
0.17423,
51.658037
],
[
0.155652,
51.668496
],
[
0.15593,
51.66842
],
[
0.156728,
51.668163
],
[
0.157183,
51.667992
],
[
0.157494,
51.667879
],
[
0.157623,
51.667831
],
[
0.157893,
51.667736
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Fri, Sep 25, 2026 10:06 PM
- Record versioned
- Sat, Sep 26, 2026 12:12 AM
- Coordinate source
- Geometry
Driving on the M25? See every live closure, roadwork and planned restriction on this road.
M25 live closuresRelated incidents
M25 Clockwise Jct 30 exit slip lane 1 closure
Planned Roadworks National HighwaysStarts in 58 minutes 28 seconds
M25 Clockwise Jct 30 exit slip lane 1 closure
M25 Anti-clockwise Jct 10 to Jct 9 carriageway closure
Planned Roadworks National HighwaysStarts in 58 minutes 28 seconds
M25 Anti-clockwise Jct 10 to Jct 9 carriageway closure
M25 Clockwise Jct 4 to Jct 5 carriageway closure
Cleared Roadworks National HighwaysExpected to clear in 8 hours 28 minutes
M25 Clockwise Jct 4 to Jct 5 carriageway closure
M25 Clockwise Jct 4 to Jct 5 lane 1 closure
Planned Roadworks National HighwaysStarts in 58 minutes 28 seconds
M25 Clockwise Jct 4 to Jct 5 lane 1 closure
M25 Anti-Clockwise Jct 17 Exit Slip Road Lane 1 Closure
Planned Roadworks National HighwaysStarts in 58 minutes 28 seconds
M25 Anti-Clockwise Jct 17 Exit Slip Road Lane 1 Closure
M25 Clockwise jct 21 to Jct 21A Lane 4,3 closure
Planned Roadworks National HighwaysStarts in 58 minutes 28 seconds
M25 Clockwise jct 21 to Jct 21A Lane 4,3 closure