M25 Clockwise Jct 27 to Jct 28 lane 1 closure
ClearedM25 Clockwise Jct 27 to Jct 28 lane 1 closure
- Start time
- Tue, Jul 28, 2026 9:00 PM
- Expected end
- Wed, Jul 29, 2026 4:30 AM
- Duration
- 3 hours 2 seconds
- Road
- M25 – M25 Clockwise Between J27 And J28
- Category
- Road Maintenance
- Direction
- Clockwise
- Carriageway
- Dual Carriageway
- Lanes affected
- 1 of 4 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Jul 28, 2026 8:53 PM
- Last updated
- Tue, Jul 28, 2026 11:26 PM
- Cleared
- Wed, Jul 29, 2026 12:00 AM
- Latest update: M25 Clockwise Jct 27 to Jct 28 lane 1 closure
- Coordinates
- 51.625439, 0.234607
- Latitude span
- 51.622964 – 51.627518
- Longitude span
- 0.230683 – 0.239469
- Bounding box centre
- 51.625241, 0.235076
- Location descriptions
-
- M25 clockwise between J27 and J28
- Feed validity status
- Active
- Overall feed start
- Tue, Jul 28, 2026 9:00 PM
- Overall feed end
- Wed, Jul 29, 2026 4:30 AM
- Feed window length
- 7 hours 30 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
7 coordinate pairs- Description
- M25 clockwise between J27 and J28
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {1519D89C-D492-4C1D-9FDB-F6BD6D868B39}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 589 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.626325 0.232882 51.626195 0.233121 51.625213 0.234954 51.625094 0.235176 51.623776 0.237784 51.623468 0.238419 51.622964 0.239469
Segment 2
3 coordinate pairs- Description
- M25 clockwise between J27 and J28
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {30258F20-69F5-4B5C-84BC-DC5E41FCC458}
- Linear Element Type
- A Carriageway
- From Distance
- 652 m
- To Distance
- 854 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.627518 0.230683 51.627509 0.2307 51.626325 0.232882
- Geometry type
- MultiLineString
- Geometry points
- 10
- First coordinate pair
- 0.232882, 51.626325
- Road section segments
- 1
- Road section points
- 10
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
0.232882,
51.626325
],
[
0.233121,
51.626195
],
[
0.234954,
51.625213
],
[
0.235176,
51.625094
],
[
0.237784,
51.623776
],
[
0.238419,
51.623468
],
[
0.239469,
51.622964
],
[
0.230683,
51.627518
],
[
0.2307,
51.627509
],
[
0.232882,
51.626325
]
]
]
}
View road section coordinates
[
[
[
0.232882,
51.626325
],
[
0.233121,
51.626195
],
[
0.234954,
51.625213
],
[
0.235176,
51.625094
],
[
0.237784,
51.623776
],
[
0.238419,
51.623468
],
[
0.239469,
51.622964
],
[
0.230683,
51.627518
],
[
0.2307,
51.627509
],
[
0.232882,
51.626325
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Tue, Jul 28, 2026 8:53 PM
- Record versioned
- Tue, Jul 28, 2026 11:26 PM
- Coordinate source
- Geometry
Driving on the M25? See every live closure, roadwork and planned restriction on this road.
M25 live closuresRelated incidents
M25 Clockwise Jct 25 to Jct 26 lane 1,2 closure
Planned Roadworks National HighwaysStarts in 38 minutes 41 seconds
M25 Clockwise Jct 25 to Jct 26 lane 1,2 closure
M25 Jct 28 roundabout lane 3,2 closure
Planned Roadworks National HighwaysStarts in 38 minutes 41 seconds
M25 Jct 28 roundabout lane 3,2 closure
M25 Anti-Clockwise Jct 12 to Jct 11 lane 4,3,2 closure
Planned Roadworks National HighwaysStarts in 38 minutes 41 seconds
M25 Anti-Clockwise Jct 12 to Jct 11 lane 4,3,2 closure
M25 Anticlockwise Jct 16 lane 4,3 closure
Planned Roadworks National HighwaysStarts in 38 minutes 41 seconds
M25 Anticlockwise Jct 16 lane 4,3 closure
M25 Anti-clockwise Jct 9 to Jct 8 lane 4,3 closure
Planned Roadworks National HighwaysStarts in 38 minutes 41 seconds
M25 Anti-clockwise Jct 9 to Jct 8 lane 4,3 closure
M25 anti clockwise Jct 20 entry slip road closure
Cleared Roadworks National HighwaysExpected to clear in 8 hours 8 minutes
M25 anti clockwise Jct 20 entry slip road closure