M25 Clockwise Jct 2 entry slip road closure.
ClearedM25 Clockwise Jct 2 entry slip road closure.
- Start time
- Mon, Sep 21, 2026 9:00 PM
- Expected end
- Tue, Sep 22, 2026 4:30 AM
- Duration
- 2 seconds
- Road
- M25 – M25 J2 Clockwise Access
- Category
- Road Maintenance
- Direction
- Clockwise
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Apr 29, 2026 2:49 PM
- Last updated
- Mon, Sep 21, 2026 5:28 PM
- Cleared
- Mon, Sep 21, 2026 9:00 PM
- Latest update: M25 Clockwise Jct 2 entry slip road closure.
- Coordinates
- 51.424517, 0.237852
- Latitude span
- 51.423257 – 51.425366
- Longitude span
- 0.236510 – 0.238698
- Bounding box centre
- 51.424312, 0.237604
- Location descriptions
-
- M25 J2 clockwise access
- Feed validity status
- Planned
- Overall feed start
- Mon, Sep 21, 2026 9:00 PM
- Overall feed end
- Tue, Sep 22, 2026 4:30 AM
- Feed window length
- 7 hours 30 minutes
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- M25 J2 clockwise access
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {2E33EAA2-4D52-4D07-94AB-A627BFC6B53F}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 27 m
- To Distance
- 126 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.425366 0.238698 51.425362 0.238694 51.42534 0.23867 51.425116 0.238437 51.424606 0.23794
Segment 2
5 coordinate pairs- Description
- M25 J2 clockwise access
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {EB0020C6-A7F1-4746-BA79-DB474800CDEA}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 180 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.424606 0.23794 51.424153 0.237498 51.42388 0.237263 51.423486 0.236866 51.423257 0.23651
- Geometry type
- MultiLineString
- Geometry points
- 10
- First coordinate pair
- 0.238698, 51.425366
- Road section segments
- 1
- Road section points
- 10
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
0.238698,
51.425366
],
[
0.238694,
51.425362
],
[
0.23867,
51.42534
],
[
0.238437,
51.425116
],
[
0.23794,
51.424606
],
[
0.23794,
51.424606
],
[
0.237498,
51.424153
],
[
0.237263,
51.42388
],
[
0.236866,
51.423486
],
[
0.23651,
51.423257
]
]
]
}
View road section coordinates
[
[
[
0.238698,
51.425366
],
[
0.238694,
51.425362
],
[
0.23867,
51.42534
],
[
0.238437,
51.425116
],
[
0.23794,
51.424606
],
[
0.23794,
51.424606
],
[
0.237498,
51.424153
],
[
0.237263,
51.42388
],
[
0.236866,
51.423486
],
[
0.23651,
51.423257
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, Apr 29, 2026 2:49 PM
- Record versioned
- Mon, Sep 21, 2026 5:28 PM
- Coordinate source
- Geometry
Driving on the M25? See every live closure, roadwork and planned restriction on this road.
M25 live closuresRelated incidents
M25 Anti-clockwise Jct 10 to Jct 9 carriageway closure
Planned Roadworks National HighwaysStarts in 11 hours 30 minutes
M25 Anti-clockwise Jct 10 to Jct 9 carriageway closure
M25 Clockwise Jct 4 to Jct 5 carriageway closure
Cleared Roadworks National HighwaysExpected to clear in 19 hours 16 seconds
M25 Clockwise Jct 4 to Jct 5 carriageway closure
M25 Clockwise Jct 4 to Jct 5 lane 1 closure
Planned Roadworks National HighwaysStarts in 11 hours 30 minutes
M25 Clockwise Jct 4 to Jct 5 lane 1 closure
M25 Anti-Clockwise Jct 17 Exit Slip Road Lane 1 Closure
Planned Roadworks National HighwaysStarts in 11 hours 30 minutes
M25 Anti-Clockwise Jct 17 Exit Slip Road Lane 1 Closure
M25 Clockwise jct 21 to Jct 21A Lane 4,3 closure
Planned Roadworks National HighwaysStarts in 11 hours 30 minutes
M25 Clockwise jct 21 to Jct 21A Lane 4,3 closure
A282 Northbound Dartford Crossing West Tunnel closure
Planned Roadworks National HighwaysStarts in 10 hours 30 minutes
A282 Northbound Dartford Crossing West Tunnel closure