M25 Clockwise Jct 11 exit slip road closure
ClearedM25 Clockwise Jct 11 exit slip road closure
- Start time
- Mon, Sep 14, 2026 9:00 PM
- Expected end
- Tue, Sep 15, 2026 4:00 AM
- Duration
- 7 hours
- Road
- M25 – M25 J11 Clockwise Exit
- Category
- Road Maintenance
- Direction
- Clockwise
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Aug 14, 2026 12:52 PM
- Last updated
- Tue, Sep 15, 2026 3:45 AM
- Cleared
- Tue, Sep 15, 2026 4:00 AM
- Latest update: M25 Clockwise Jct 11 exit slip road closure
- Coordinates
- 51.373440, -0.508967
- Latitude span
- 51.371126 – 51.374353
- Longitude span
- -0.509611 – -0.507445
- Bounding box centre
- 51.372740, -0.508528
- Location descriptions
-
- M25 J11 clockwise exit
- Feed validity status
- Planned
- Overall feed start
- Mon, Sep 14, 2026 9:00 PM
- Overall feed end
- Tue, Sep 15, 2026 4:00 AM
- Feed window length
- 7 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
8 coordinate pairs- Description
- M25 J11 clockwise exit
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {019E8EDA-DEAA-45C7-AE03-1165F48975B8}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 371 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.371126 -0.507445 51.371507 -0.507706 51.372065 -0.508084 51.372378 -0.508295 51.373266 -0.508855 51.373746 -0.509141 51.374163 -0.509413 51.374212 -0.509468
Segment 2
6 coordinate pairs- Description
- M25 J11 clockwise exit
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {136952C3-EE8C-499E-A4C9-172F6F66C23D}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 18 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.374212 -0.509468 51.374258 -0.50949 51.37427 -0.5095 51.374282 -0.509512 51.374318 -0.509554 51.374353 -0.509611
- Geometry type
- MultiLineString
- Geometry points
- 14
- First coordinate pair
- -0.507445, 51.371126
- Road section segments
- 1
- Road section points
- 14
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.507445,
51.371126
],
[
-0.507706,
51.371507
],
[
-0.508084,
51.372065
],
[
-0.508295,
51.372378
],
[
-0.508855,
51.373266
],
[
-0.509141,
51.373746
],
[
-0.509413,
51.374163
],
[
-0.509468,
51.374212
],
[
-0.509468,
51.374212
],
[
-0.50949,
51.374258
],
[
-0.5095,
51.37427
],
[
-0.509512,
51.374282
],
[
-0.509554,
51.374318
],
[
-0.509611,
51.374353
]
]
]
}
View road section coordinates
[
[
[
-0.507445,
51.371126
],
[
-0.507706,
51.371507
],
[
-0.508084,
51.372065
],
[
-0.508295,
51.372378
],
[
-0.508855,
51.373266
],
[
-0.509141,
51.373746
],
[
-0.509413,
51.374163
],
[
-0.509468,
51.374212
],
[
-0.509468,
51.374212
],
[
-0.50949,
51.374258
],
[
-0.5095,
51.37427
],
[
-0.509512,
51.374282
],
[
-0.509554,
51.374318
],
[
-0.509611,
51.374353
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Fri, Aug 14, 2026 12:52 PM
- Record versioned
- Tue, Sep 15, 2026 3:45 AM
- Coordinate source
- Geometry
Driving on the M25? See every live closure, roadwork and planned restriction on this road.
M25 live closuresRelated incidents
M25 Clockwise Jct 4 to Jct 5 lane 1 closure
Planned Roadworks National HighwaysStarts in 17 hours 47 minutes
M25 Clockwise Jct 4 to Jct 5 lane 1 closure
M25 Anti-Clockwise Jct 17 Exit Slip Road Lane 1 Closure
Planned Roadworks National HighwaysStarts in 17 hours 47 minutes
M25 Anti-Clockwise Jct 17 Exit Slip Road Lane 1 Closure
M25 Clockwise jct 21 to Jct 21A Lane 4,3 closure
Planned Roadworks National HighwaysStarts in 17 hours 47 minutes
M25 Clockwise jct 21 to Jct 21A Lane 4,3 closure
M25 Anti-clockwise Jct 4 to Jct 3 lane 3 closure
Cleared Roadworks National HighwaysCleared 2 hours 57 minutes ago
M25 Anti-clockwise Jct 4 to Jct 3 lane 3 closure
M25 Clockwise Jct 29 to Jct 31 lane 4,3 closure
Cleared Roadworks National HighwaysCleared 2 hours 42 minutes ago
M25 Clockwise Jct 29 to Jct 31 lane 4,3 closure
M25 Anti-clockwise Jct 17 to Jct 16 lane 1 and lane 2 closures.
Cleared Roadworks National HighwaysCleared 23 hours 12 minutes ago
M25 Anti-clockwise Jct 17 to Jct 16 lane 1 and lane 2 closures.