M25 Anti-clockwise Jct 8 exit slip road lane 1 closure
ClearedM25 Anti-clockwise Jct 8 exit slip road lane 1 closure
- Start time
- Tue, Sep 15, 2026 9:06 PM
- Expected end
- Wed, Sep 16, 2026 4:00 AM
- Duration
- 2 hours 54 minutes 2 seconds
- Road
- M25 – M25 J8 Anti-Clockwise Exit
- Category
- Road Maintenance
- Direction
- Anticlockwise
- Carriageway
- Dual Carriageway
- Lanes affected
- 1 of 1 lanes affected, 1 of 4 lanes affected
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Sep 15, 2026 9:06 PM
- Last updated
- Tue, Sep 15, 2026 11:32 PM
- Cleared
- Wed, Sep 16, 2026 12:00 AM
- Latest update: M25 Anti-clockwise Jct 8 exit slip road lane 1 closure
- Coordinates
- 51.258588, -0.201148
- Latitude span
- 51.258084 – 51.258994
- Longitude span
- -0.204205 – -0.199344
- Bounding box centre
- 51.258539, -0.201775
- Location descriptions
-
- M25 J8 anti-clockwise exit
- M25 anti-clockwise between J9 and J8
- Feed validity status
- Active
- Overall feed start
- Tue, Sep 15, 2026 9:06 PM
- Overall feed end
- Wed, Sep 16, 2026 4:00 AM
- Feed window length
- 6 hours 54 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
10 coordinate pairs- Description
- M25 J8 anti-clockwise exit
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {487989F0-7249-4F4B-AB23-98A62151AE2F}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 303 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.258148 -0.203461 51.258415 -0.201848 51.258517 -0.201234 51.258575 -0.200931 51.258659 -0.200526 51.258743 -0.200136 51.258828 -0.199832 51.258957 -0.199425 51.258983 -0.199367 51.258994 -0.199344
Segment 2
2 coordinate pairs- Description
- M25 anti-clockwise between J9 and J8
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {A9C06AC2-2C3A-4CC6-8728-E230DC439FBA}
- Linear Element Type
- B Carriageway
- From Distance
- 151 m
- To Distance
- 203 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.258084 -0.204205 51.258148 -0.203461
- Geometry type
- MultiLineString
- Geometry points
- 12
- First coordinate pair
- -0.203461, 51.258148
- Road section segments
- 1
- Road section points
- 12
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.203461,
51.258148
],
[
-0.201848,
51.258415
],
[
-0.201234,
51.258517
],
[
-0.200931,
51.258575
],
[
-0.200526,
51.258659
],
[
-0.200136,
51.258743
],
[
-0.199832,
51.258828
],
[
-0.199425,
51.258957
],
[
-0.199367,
51.258983
],
[
-0.199344,
51.258994
],
[
-0.204205,
51.258084
],
[
-0.203461,
51.258148
]
]
]
}
View road section coordinates
[
[
[
-0.203461,
51.258148
],
[
-0.201848,
51.258415
],
[
-0.201234,
51.258517
],
[
-0.200931,
51.258575
],
[
-0.200526,
51.258659
],
[
-0.200136,
51.258743
],
[
-0.199832,
51.258828
],
[
-0.199425,
51.258957
],
[
-0.199367,
51.258983
],
[
-0.199344,
51.258994
],
[
-0.204205,
51.258084
],
[
-0.203461,
51.258148
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Tue, Sep 15, 2026 9:06 PM
- Record versioned
- Tue, Sep 15, 2026 11:32 PM
- Coordinate source
- Geometry
Driving on the M25? See every live closure, roadwork and planned restriction on this road.
M25 live closuresRelated incidents
M25 Anti-clockwise Jct 6 to Jct 5 lane 1,2 closure
Planned Roadworks National HighwaysStarts in 20 hours 21 minutes
M25 Anti-clockwise Jct 6 to Jct 5 lane 1,2 closure
A12 northbound Jct 11 entry slip road closure from M25 exit
Planned Roadworks National HighwaysStarts in 19 hours 21 minutes
A12 northbound Jct 11 entry slip road closure from M25 exit
M25 Clockwise jct 21 to Jct 21A Lane 4,3 closure
Cleared Roadworks National HighwaysCleared 1 hour 8 minutes ago
M25 Clockwise jct 21 to Jct 21A Lane 4,3 closure
M25 Clockwise Jct 30 exit slip lane 1 closure
Cleared Roadworks National HighwaysCleared 3 hours 38 minutes ago
M25 Clockwise Jct 30 exit slip lane 1 closure
M25 Anti-clockwise Jct 10 to Jct 9 carriageway closure
Cleared Roadworks National HighwaysCleared 3 hours 38 minutes ago
M25 Anti-clockwise Jct 10 to Jct 9 carriageway closure
M25 Clockwise Jct 4 to Jct 5 carriageway closure
Cleared Roadworks National HighwaysExpected to clear in 3 hours 51 minutes
M25 Clockwise Jct 4 to Jct 5 carriageway closure