M20 northbound hard shoulder closure (101/4-100/8)
PlannedM20 northbound hard shoulder closure (101/4-100/8)
- Start time
- Wed, Oct 14, 2026 8:00 AM
- Expected end
- Wed, Oct 14, 2026 3:00 PM
- Duration
- 7 hours
- Road
- M20 – M20 Westbound Between J11 And J10A
- Category
- Road Maintenance
- Direction
- Westbound
- Carriageway
- Dual Carriageway
- Lanes affected
- 1 of 1 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Oct 14, 2026 8:42 AM
- Last updated
- Wed, Oct 14, 2026 9:38 AM
- Cleared
- Wed, Oct 14, 2026 3:00 PM
- Latest update: M20 northbound hard shoulder closure (101/4-100/8)
- Coordinates
- 51.096465, 1.041347
- Latitude span
- 51.096044 – 51.096816
- Longitude span
- 1.039003 – 1.043920
- Bounding box centre
- 51.096430, 1.041462
- Location descriptions
-
- M20 westbound between J11 and J10A
- M20 J11 westbound access
- Feed validity status
- Planned
- Overall feed start
- Wed, Oct 14, 2026 8:00 AM
- Overall feed end
- Wed, Oct 14, 2026 3:00 PM
- Feed window length
- 7 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- M20 westbound between J11 and J10A
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- West Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M20
- Linear Element Model
- The Network Model
- Linear Element Id
- {E5628339-9E07-46A9-8A39-42A0A9C546CA}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 158 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.096244 1.043022 51.096426 1.041677 51.096542 1.040809 51.096543 1.040807
Segment 2
5 coordinate pairs- Description
- M20 westbound between J11 and J10A
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- West Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M20
- Linear Element Model
- The Network Model
- Linear Element Id
- {26263ACB-C355-4885-8325-882CBB98ED1F}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 129 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.096543 1.040807 51.096547 1.04077 51.096557 1.040686 51.096612 1.04029 51.096816 1.039003
Segment 3
2 coordinate pairs- Description
- M20 J11 westbound access
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- West Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M20
- Linear Element Model
- The Network Model
- Linear Element Id
- {F8C4402B-27E1-4C81-B613-CCFB439CB5A8}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 317 m
- To Distance
- 384 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.096044 1.04392 51.096244 1.043022
- Geometry type
- MultiLineString
- Geometry points
- 11
- First coordinate pair
- 1.043022, 51.096244
- Road section segments
- 1
- Road section points
- 11
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
1.043022,
51.096244
],
[
1.041677,
51.096426
],
[
1.040809,
51.096542
],
[
1.040807,
51.096543
],
[
1.040807,
51.096543
],
[
1.04077,
51.096547
],
[
1.040686,
51.096557
],
[
1.04029,
51.096612
],
[
1.039003,
51.096816
],
[
1.04392,
51.096044
],
[
1.043022,
51.096244
]
]
]
}
View road section coordinates
[
[
[
1.043022,
51.096244
],
[
1.041677,
51.096426
],
[
1.040809,
51.096542
],
[
1.040807,
51.096543
],
[
1.040807,
51.096543
],
[
1.04077,
51.096547
],
[
1.040686,
51.096557
],
[
1.04029,
51.096612
],
[
1.039003,
51.096816
],
[
1.04392,
51.096044
],
[
1.043022,
51.096244
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, Oct 14, 2026 8:42 AM
- Record versioned
- Wed, Oct 14, 2026 9:38 AM
- Coordinate source
- Geometry
Driving on the M20? See every live closure, roadwork and planned restriction on this road.
M20 live closuresRelated incidents
M20 eastbound Jct 8 to Jct 9 hardshoulder closure (72/0 to 72/9)
Active Roadworks National HighwaysExpected to clear in 4 hours 14 minutes
M20 eastbound Jct 8 to Jct 9 hardshoulder closure (72/0 to 72/9)
M20 Eastbound Jct 2 to Jct 3 lane 1,2 closure
Planned Roadworks National HighwaysStarts in 11 hours 14 minutes
M20 Eastbound Jct 2 to Jct 3 lane 1,2 closure
M20 Eastbound Jct 1 to Jct 2 lane 1,2 closure
Planned Roadworks National HighwaysStarts in 11 hours 14 minutes
M20 Eastbound Jct 1 to Jct 2 lane 1,2 closure
M20 eastbound lane 1 closure (91/4A to 94/2A)
Planned Roadworks National HighwaysStarts in 9 hours 14 minutes
M20 eastbound lane 1 closure (91/4A to 94/2A)
M20 eastbound lane 1 closure including lane 1 closure on Jct 7 exit slip road
Planned Roadworks National HighwaysStarts in 9 hours 14 minutes
M20 eastbound lane 1 closure including lane 1 closure on Jct 7 exit slip road
M20 eastbound Jct 8 to Jct 9 hardshoulder closure (72/0 to 72/9)
Cleared Roadworks National HighwaysCleared 1 hour 5 seconds ago
M20 eastbound Jct 8 to Jct 9 hardshoulder closure (72/0 to 72/9)