M2 westbound lane 1 closure on Jct 3 exit slip road (52/9B to 52/7B)
PlannedM2 westbound lane 1 closure on Jct 3 exit slip road (52/9B to 52/7B)
- Start time
- Thu, Oct 15, 2026 7:00 PM
- Expected end
- Fri, Oct 16, 2026 3:00 AM
- Duration
- 8 hours
- Road
- M2 – M2 J3 Westbound Exit
- Category
- Road Maintenance
- Direction
- Westbound
- Lanes affected
- Lane 1 closed, 1 of 1 lanes affected
- Reason
- Repair Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Oct 12, 2026 10:00 AM
- Last updated
- Thu, Oct 15, 2026 5:18 AM
- Cleared
- Fri, Oct 16, 2026 3:00 AM
- Latest update: M2 westbound lane 1 closure on Jct 3 exit slip road (52/9B to 52/7B)
- Coordinates
- 51.333354, 0.510915
- Latitude span
- 51.332736 – 51.334304
- Longitude span
- 0.509938 – 0.511498
- Bounding box centre
- 51.333520, 0.510718
- Location descriptions
-
- M2 J3 westbound exit
- Feed validity status
- Planned
- Overall feed start
- Thu, Oct 15, 2026 7:00 PM
- Overall feed end
- Fri, Oct 16, 2026 3:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- M2 J3 westbound exit
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- West Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M2
- Linear Element Model
- The Network Model
- Linear Element Id
- {3BB2FDBA-4D74-4611-B972-BD854236C338}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 158 m
- To Distance
- 235 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.332736 0.511498 51.332759 0.511478 51.333343 0.510958
Segment 2
3 coordinate pairs- Description
- M2 J3 westbound exit
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- West Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M2
- Linear Element Model
- The Network Model
- Linear Element Id
- {0559012B-F379-46C1-A2BF-2F668A83C271}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 128 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.333343 0.510958 51.333639 0.510658 51.334304 0.509938
- Geometry type
- MultiLineString
- Geometry points
- 6
- First coordinate pair
- 0.511498, 51.332736
- Road section segments
- 1
- Road section points
- 6
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
0.511498,
51.332736
],
[
0.511478,
51.332759
],
[
0.510958,
51.333343
],
[
0.510958,
51.333343
],
[
0.510658,
51.333639
],
[
0.509938,
51.334304
]
]
]
}
View road section coordinates
[
[
[
0.511498,
51.332736
],
[
0.511478,
51.332759
],
[
0.510958,
51.333343
],
[
0.510958,
51.333343
],
[
0.510658,
51.333639
],
[
0.509938,
51.334304
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Repair Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Oct 12, 2026 10:00 AM
- Record versioned
- Thu, Oct 15, 2026 5:18 AM
- Coordinate source
- Geometry
Driving on the M2? See every live closure, roadwork and planned restriction on this road.
M2 live closuresRelated incidents
M2 eastbound lane 1 closure (68/8 to 69/6)
Planned Roadworks National HighwaysStarts in 13 hours 25 minutes
M2 eastbound lane 1 closure (68/8 to 69/6)
M2 eastbound lane 1 closure (78/0 to 79/5)
Planned Roadworks National HighwaysStarts in 13 hours 25 minutes
M2 eastbound lane 1 closure (78/0 to 79/5)
M2 eastbound lane 2 closure (59/4 to 63/4)
Planned Roadworks National HighwaysStarts in 13 hours 25 minutes
M2 eastbound lane 2 closure (59/4 to 63/4)
M2 eastbound hard shoulder closure (84/2A to 84/5)
Planned Roadworks National HighwaysStarts in 1 hour 25 minutes
M2 eastbound hard shoulder closure (84/2A to 84/5)
M2 eastbound lane 2 closure (58/5 to 59/9)
Cleared Roadworks National HighwaysCleared 1 hour 34 minutes ago
M2 eastbound lane 2 closure (58/5 to 59/9)
M2 eastbound lane closure (66/2 to 67/7)
Cleared Roadworks National HighwaysCleared 10 hours 4 minutes ago
M2 eastbound lane closure (66/2 to 67/7)