M1 southbound Jct 38 to Jct 37 lane 1 and 2 closure (280/9 - 279/8)
ClearedM1 southbound Jct 38 to Jct 37 lane 1 and 2 closure (280/9 - 279/8)
- Start time
- Thu, Sep 24, 2026 8:00 PM
- Expected end
- Fri, Sep 25, 2026 5:00 AM
- Duration
- 2 seconds
- Road
- M1 – M1 Southbound Between J38 And J37
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Lanes affected
- 2 of 2 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Sep 24, 2026 2:02 AM
- Last updated
- Thu, Sep 24, 2026 1:05 PM
- Cleared
- Thu, Sep 24, 2026 8:00 PM
- Latest update: M1 southbound Jct 38 to Jct 37 lane 1 and 2 closure (280/9 - 279/8)
- Coordinates
- 53.570219, -1.540559
- Latitude span
- 53.565473 – 53.575307
- Longitude span
- -1.541086 – -1.539290
- Bounding box centre
- 53.570390, -1.540188
- Location descriptions
-
- M1 southbound between J38 and J37
- Feed validity status
- Planned
- Overall feed start
- Thu, Sep 24, 2026 8:00 PM
- Overall feed end
- Fri, Sep 25, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
19 coordinate pairs- Description
- M1 southbound between J38 and J37
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {FA1435F1-44FC-44B6-8E01-2969B30ABA42}
- Linear Element Type
- B Carriageway
- From Distance
- 531 m
- To Distance
- 1,371 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.575307 -1.540268 53.575283 -1.540278 53.574666 -1.540501 53.574645 -1.540508 53.573905 -1.540744 53.573651 -1.54081 53.572741 -1.540978 53.572162 -1.541058 53.571669 -1.541086 53.571452 -1.541075 53.571174 -1.541073 53.57051 -1.54106 53.569659 -1.540949 53.569263 -1.540885 53.568943 -1.540816 53.568649 -1.540728 53.568374 -1.54066 53.568371 -1.540659 53.567826 -1.540465
Segment 2
7 coordinate pairs- Description
- M1 southbound between J38 and J37
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {12A01F19-52F5-40E2-84DE-632C2BA29C72}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 273 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.567826 -1.540465 53.567739 -1.540439 53.567273 -1.540248 53.56665 -1.539974 53.566335 -1.539809 53.566153 -1.539711 53.565473 -1.53929
- Geometry type
- MultiLineString
- Geometry points
- 26
- First coordinate pair
- -1.540268, 53.575307
- Road section segments
- 1
- Road section points
- 26
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.540268,
53.575307
],
[
-1.540278,
53.575283
],
[
-1.540501,
53.574666
],
[
-1.540508,
53.574645
],
[
-1.540744,
53.573905
],
[
-1.54081,
53.573651
],
[
-1.540978,
53.572741
],
[
-1.541058,
53.572162
],
[
-1.541086,
53.571669
],
[
-1.541075,
53.571452
],
[
-1.541073,
53.571174
],
[
-1.54106,
53.57051
],
[
-1.540949,
53.569659
],
[
-1.540885,
53.569263
],
[
-1.540816,
53.568943
],
[
-1.540728,
53.568649
],
[
-1.54066,
53.568374
],
[
-1.540659,
53.568371
],
[
-1.540465,
53.567826
],
[
-1.540465,
53.567826
],
[
-1.540439,
53.567739
],
[
-1.540248,
53.567273
],
[
-1.539974,
53.56665
],
[
-1.539809,
53.566335
],
[
-1.539711,
53.566153
],
[
-1.53929,
53.565473
]
]
]
}
View road section coordinates
[
[
[
-1.540268,
53.575307
],
[
-1.540278,
53.575283
],
[
-1.540501,
53.574666
],
[
-1.540508,
53.574645
],
[
-1.540744,
53.573905
],
[
-1.54081,
53.573651
],
[
-1.540978,
53.572741
],
[
-1.541058,
53.572162
],
[
-1.541086,
53.571669
],
[
-1.541075,
53.571452
],
[
-1.541073,
53.571174
],
[
-1.54106,
53.57051
],
[
-1.540949,
53.569659
],
[
-1.540885,
53.569263
],
[
-1.540816,
53.568943
],
[
-1.540728,
53.568649
],
[
-1.54066,
53.568374
],
[
-1.540659,
53.568371
],
[
-1.540465,
53.567826
],
[
-1.540465,
53.567826
],
[
-1.540439,
53.567739
],
[
-1.540248,
53.567273
],
[
-1.539974,
53.56665
],
[
-1.539809,
53.566335
],
[
-1.539711,
53.566153
],
[
-1.53929,
53.565473
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Sep 24, 2026 2:02 AM
- Record versioned
- Thu, Sep 24, 2026 1:05 PM
- Coordinate source
- Geometry
Driving on the M1? See every live closure, roadwork and planned restriction on this road.
M1 live closuresRelated incidents
M1 southbound Jct 15 to Jct 14 lane closure
Planned Roadworks National HighwaysExpected to clear in 6 hours 34 minutes
M1 southbound Jct 15 to Jct 14 lane closure
M1 Southbound Jct 5 to Jct 4 lane 3,2 closure
Planned Roadworks National HighwaysExpected to clear in 7 hours 4 minutes
M1 Southbound Jct 5 to Jct 4 lane 3,2 closure
Lane 1,2,3 closure northbound
Active Roadworks National HighwaysExpected to clear in 7 hours 34 minutes
Lane 1,2,3 closure northbound
M1 southbound Jct 33 entry slip lane 1 closure
Active Roadworks National HighwaysExpected to clear in 7 hours 34 minutes
M1 southbound Jct 33 entry slip lane 1 closure
Lane 2,3,4 closure southbound
Active Roadworks National HighwaysExpected to clear in 7 hours 34 minutes
Lane 2,3,4 closure southbound
M1 northbound Jct 44 hardshoulder closure (305/2 - 306/1)
Planned Roadworks National HighwaysExpected to clear in 3 weeks 6 days
M1 northbound Jct 44 hardshoulder closure (305/2 - 306/1)