M1 southbound Jct 37 entry slip road closure

Cleared

M1 southbound Jct 37 entry slip road closure

Start time
Thu, Oct 8, 2026 9:10 PM
Expected end
Fri, Oct 9, 2026 5:00 AM
Duration
5 hours 50 minutes 1 second
Road
M1 – M1 Southbound Between J37 And J36
Category
Construction Work
Direction
Southbound
Reason
Road Improvement Or Upgrading
Live incident
Active roadworks
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Thu, Oct 8, 2026 9:10 PM
Last updated
Fri, Oct 9, 2026 2:44 AM
Cleared
Fri, Oct 9, 2026 3:00 AM
  • Latest update: M1 southbound Jct 37 entry slip road closure
Coordinates
53.544792, -1.511838
Latitude span
53.539906 – 53.548512
Longitude span
-1.514601 – -1.508188
Bounding box centre
53.544209, -1.511395
Location descriptions
  • M1 southbound between J37 and J36
  • M1 J37 southbound access
Feed validity status
Active
Overall feed start
Thu, Oct 8, 2026 9:10 PM
Overall feed end
Fri, Oct 9, 2026 5:00 AM
Feed window length
7 hours 50 minutes
Probability code (raw)
certain
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
carriagewayClosures (Carriageway Closures)
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

2 coordinate pairs
Description
M1 southbound between J37 and J36
Lanes Restricted
2 lanes restricted
Operational Lanes
0 operational lanes
Direction On Section
South Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M1
Linear Element Model
The Network Model
Linear Element Id
{D4E05A91-D2E5-4B98-ABF9-4930DD8B5773}
Linear Element Type
B Carriageway Entry Slip
From Distance
0 m
To Distance
104 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.540762 -1.508819
53.539906 -1.508188

Segment 2

9 coordinate pairs
Description
M1 J37 southbound access
Lanes Restricted
3 lanes restricted
Operational Lanes
0 operational lanes
Direction On Section
South Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M1
Linear Element Model
The Network Model
Linear Element Id
{50B36FC0-50DB-42F5-99A3-C92F1793C469}
Linear Element Type
B Carriageway Entry Slip
From Distance
17 m
To Distance
961 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.548512 -1.514601
53.548308 -1.514503
53.548263 -1.514474
53.547902 -1.514161
53.547253 -1.513685
53.545162 -1.512094
53.543719 -1.511024
53.542159 -1.50985
53.540762 -1.508819
Geometry type
MultiLineString
Geometry points
11
First coordinate pair
-1.508819, 53.540762
Road section segments
1
Road section points
11
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                -1.508819,
                53.540762
            ],
            [
                -1.508188,
                53.539906
            ],
            [
                -1.514601,
                53.548512
            ],
            [
                -1.514503,
                53.548308
            ],
            [
                -1.514474,
                53.548263
            ],
            [
                -1.514161,
                53.547902
            ],
            [
                -1.513685,
                53.547253
            ],
            [
                -1.512094,
                53.545162
            ],
            [
                -1.511024,
                53.543719
            ],
            [
                -1.50985,
                53.542159
            ],
            [
                -1.508819,
                53.540762
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            -1.508819,
            53.540762
        ],
        [
            -1.508188,
            53.539906
        ],
        [
            -1.514601,
            53.548512
        ],
        [
            -1.514503,
            53.548308
        ],
        [
            -1.514474,
            53.548263
        ],
        [
            -1.514161,
            53.547902
        ],
        [
            -1.513685,
            53.547253
        ],
        [
            -1.512094,
            53.545162
        ],
        [
            -1.511024,
            53.543719
        ],
        [
            -1.50985,
            53.542159
        ],
        [
            -1.508819,
            53.540762
        ]
    ]
]
Cause type
Construction Work
Detailed cause
Road Improvement Or Upgrading
Compliance
Mandatory
Probability
Certain
Validity status
Active
Road management
Carriageway Closures
Feed provider
National Highways
Data source
Roadworks
Feed version
1
Record created
Thu, Oct 8, 2026 9:10 PM
Record versioned
Fri, Oct 9, 2026 2:44 AM
Coordinate source
Geometry

Driving on the M1? See every live closure, roadwork and planned restriction on this road.

M1 live closures

Related incidents

M1 Southbound Jct 5 to Jct 4 lane 3,2 closure

Planned Roadworks National Highways
Barnet M1 · M1 Southbound Between J4 And J2

Starts in 12 hours 49 minutes

Starts 13 Oct 2026, 21:00 Expected clear 14 Oct 2026, 04:30

M1 Southbound Jct 5 to Jct 4 lane 3,2 closure

Category: Road Maintenance
View update

M1 Southbound Jct 6 exit slip road Lane 1 closure,

Planned Roadworks National Highways
St Albans M1 · Link Road From M1 J6A Southbound To M25 J21

Starts in 12 hours 49 minutes

Starts 13 Oct 2026, 21:00 Expected clear 14 Oct 2026, 04:30

M1 Southbound Jct 6 exit slip road Lane 1 closure,

Category: Road Maintenance
View update

M1 southbound Jct 15 to Jct 14 lane 1 closure (MP 87/5 to 85/0)

Planned Roadworks National Highways
Milton Keynes M1 · M1 Southbound Between J15 And J14

Starts in 12 hours 49 minutes

Starts 13 Oct 2026, 21:00 Expected clear 14 Oct 2026, 04:00

M1 southbound Jct 15 to Jct 14 lane 1 closure (MP 87/5 to 85/0)

Category: Road Maintenance
View update

M1 southbound Jct 12 exit slip road hard shoulder closure and lane 2 closure (MP 63/9 to 62/5)

Planned Roadworks National Highways
Central Bedfordshire M1 · M1 J12 Southbound Exit

Starts in 11 hours 49 minutes

Starts 13 Oct 2026, 20:00 Expected clear 14 Oct 2026, 04:00

M1 southbound Jct 12 exit slip road hard shoulder closure and lane 2 closure (MP 63/9 to 62/5)

Category: Road Maintenance
View update

M1 southbound Jct 32 Lane 1 closure (252/4 250/8)

Planned Roadworks National Highways
Rotherham M1 · M1 Southbound Within J32

Starts in 10 hours 49 minutes

Starts 13 Oct 2026, 19:00 Expected clear 14 Oct 2026, 04:00

M1 southbound Jct 32 Lane 1 closure (252/4 250/8)

Category: Road Maintenance
View update

Lane 2,3,4 closure southbound

Planned Roadworks National Highways
Sutton-In-Ashfield M1 · M1 Southbound Within J27

Starts in 10 hours 49 minutes

Starts 13 Oct 2026, 19:00 Expected clear 14 Oct 2026, 05:00

Lane 2,3,4 closure southbound

Category: Road Maintenance
View update