M1 northbound Jct 45 entry slip road closure
PlannedM1 northbound Jct 45 entry slip road closure
- Start time
- Mon, Aug 3, 2026 9:00 PM
- Expected end
- Tue, Aug 4, 2026 5:00 AM
- Duration
- 8 hours
- Road
- M1 – M1 J45 Northbound Access
- Category
- Road Maintenance
- Direction
- Northbound
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Jul 27, 2026 11:45 AM
- Last updated
- Mon, Aug 3, 2026 12:25 AM
- Cleared
- Tue, Aug 4, 2026 5:00 AM
- Latest update: M1 northbound Jct 45 entry slip road closure
- Coordinates
- 53.777011, -1.466738
- Latitude span
- 53.776866 – 53.777177
- Longitude span
- -1.470334 – -1.460886
- Bounding box centre
- 53.777022, -1.465610
- Location descriptions
-
- M1 J45 northbound access
- roundabout at M1 J45/A63
- Feed validity status
- Planned
- Overall feed start
- Mon, Aug 3, 2026 9:00 PM
- Overall feed end
- Tue, Aug 4, 2026 5:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
10 coordinate pairs- Description
- M1 J45 northbound access
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {ADEE6225-4D48-4584-88BD-6D202FBDD745}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 623 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.776866 -1.470285 53.77687 -1.469696 53.777023 -1.468202 53.777126 -1.467064 53.777177 -1.465743 53.777173 -1.464831 53.777161 -1.464205 53.777118 -1.463317 53.777069 -1.462453 53.776941 -1.460886
Segment 2
3 coordinate pairs- Description
- roundabout at M1 J45/A63
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A63
- Linear Element Model
- The Network Model
- Linear Element Id
- {F0BEF865-17DE-42AA-85EA-C0193FFA6BDD}
- Linear Element Type
- Other
- From Distance
- 55 m
- To Distance
- 59 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.776882 -1.470334 53.776871 -1.470295 53.776866 -1.470285
- Geometry type
- MultiLineString
- Geometry points
- 13
- First coordinate pair
- -1.470285, 53.776866
- Road section segments
- 1
- Road section points
- 13
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.470285,
53.776866
],
[
-1.469696,
53.77687
],
[
-1.468202,
53.777023
],
[
-1.467064,
53.777126
],
[
-1.465743,
53.777177
],
[
-1.464831,
53.777173
],
[
-1.464205,
53.777161
],
[
-1.463317,
53.777118
],
[
-1.462453,
53.777069
],
[
-1.460886,
53.776941
],
[
-1.470334,
53.776882
],
[
-1.470295,
53.776871
],
[
-1.470285,
53.776866
]
]
]
}
View road section coordinates
[
[
[
-1.470285,
53.776866
],
[
-1.469696,
53.77687
],
[
-1.468202,
53.777023
],
[
-1.467064,
53.777126
],
[
-1.465743,
53.777177
],
[
-1.464831,
53.777173
],
[
-1.464205,
53.777161
],
[
-1.463317,
53.777118
],
[
-1.462453,
53.777069
],
[
-1.460886,
53.776941
],
[
-1.470334,
53.776882
],
[
-1.470295,
53.776871
],
[
-1.470285,
53.776866
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Jul 27, 2026 11:45 AM
- Record versioned
- Mon, Aug 3, 2026 12:25 AM
- Coordinate source
- Geometry
Driving on the M1? See every live closure, roadwork and planned restriction on this road.
M1 live closuresRelated incidents
M1 northbound Jct 10 to Jct 11 hard shoulder closure (MP 49/4 to 49/6)
Active Roadworks National HighwaysExpected to clear in 2 months 2 weeks
M1 northbound Jct 10 to Jct 11 hard shoulder closure (MP 49/4 to 49/6)
M1 southbound Jct 15 to Jct 14 lane 1 and 2 closure (MP 93/8 to 90/2)
Planned Roadworks National HighwaysStarts in 16 hours 42 minutes
M1 southbound Jct 15 to Jct 14 lane 1 and 2 closure (MP 93/8 to 90/2)
M1 southbound Jct 12 to Jct 11a hard shoulder closure (MP 59/4 to 58/2)
Planned Roadworks National HighwaysStarts in 16 hours 42 minutes
M1 southbound Jct 12 to Jct 11a hard shoulder closure (MP 59/4 to 58/2)
M1 southbound Jct 14 to Jct 13 hard shoulder closure (MP 78/4 to 74/8)
Planned Roadworks National HighwaysStarts in 16 hours 42 minutes
M1 southbound Jct 14 to Jct 13 hard shoulder closure (MP 78/4 to 74/8)
M1 northbound Jct 31 exit slip lane 1 closure
Planned Roadworks National HighwaysStarts in 15 hours 42 minutes
M1 northbound Jct 31 exit slip lane 1 closure
M621 clockwise Jct 4 to Jct 5 Lane 1 closure ( 9/4 - 9/9 )
Planned Roadworks National HighwaysStarts in 14 hours 42 minutes
M621 clockwise Jct 4 to Jct 5 Lane 1 closure ( 9/4 - 9/9 )