M1 northbound jct 42 entry slip road lane 2 closure
ClearedM1 northbound jct 42 entry slip road lane 2 closure
- Start time
- Fri, Jul 10, 2026 7:00 PM
- Expected end
- Sat, Jul 11, 2026 5:00 AM
- Duration
- 5 hours 2 seconds
- Road
- M1 – Link Road From M62 J29 Roundabout To M1 J42 Northbound Access
- Category
- Road Maintenance
- Direction
- Northbound
- Lanes affected
- Lane 2 closed, 1 of 2 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Jul 10, 2026 2:02 AM
- Last updated
- Fri, Jul 10, 2026 11:51 PM
- Cleared
- Sat, Jul 11, 2026 12:00 AM
- Latest update: M1 northbound jct 42 entry slip road lane 2 closure
- Coordinates
- 53.732782, -1.512186
- Latitude span
- 53.731948 – 53.734123
- Longitude span
- -1.512656 – -1.511787
- Bounding box centre
- 53.733036, -1.512222
- Location descriptions
-
- link road from M62 J29 roundabout to M1 J42 northbound access
- M62 fast slip from M62 J29 eastbound exit to M1 J42 northbound access
- Feed validity status
- Planned
- Overall feed start
- Fri, Jul 10, 2026 7:00 PM
- Overall feed end
- Sat, Jul 11, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- link road from M62 J29 roundabout to M1 J42 northbound access
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {D16E90A6-6AEC-4F1F-AC25-F5528F159D8F}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 10 m
- To Distance
- 41 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.731948 -1.512656 53.732037 -1.512529 53.732136 -1.512421 53.732181 -1.512391
Segment 2
5 coordinate pairs- Description
- link road from M62 J29 roundabout to M1 J42 northbound access
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {9DED5C4A-4089-4256-8D30-DCF8B89D73B1}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 127 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.732181 -1.512391 53.732342 -1.512283 53.732548 -1.512189 53.732737 -1.512127 53.733293 -1.511953
Segment 3
4 coordinate pairs- Description
- M62 fast slip from M62 J29 eastbound exit to M1 J42 northbound access
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {0278773B-9503-411C-A534-CA1D122542CD}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 93 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.733293 -1.511953 53.73341 -1.511922 53.73394 -1.511809 53.734123 -1.511787
- Geometry type
- MultiLineString
- Geometry points
- 13
- First coordinate pair
- -1.512656, 53.731948
- Road section segments
- 1
- Road section points
- 13
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.512656,
53.731948
],
[
-1.512529,
53.732037
],
[
-1.512421,
53.732136
],
[
-1.512391,
53.732181
],
[
-1.512391,
53.732181
],
[
-1.512283,
53.732342
],
[
-1.512189,
53.732548
],
[
-1.512127,
53.732737
],
[
-1.511953,
53.733293
],
[
-1.511953,
53.733293
],
[
-1.511922,
53.73341
],
[
-1.511809,
53.73394
],
[
-1.511787,
53.734123
]
]
]
}
View road section coordinates
[
[
[
-1.512656,
53.731948
],
[
-1.512529,
53.732037
],
[
-1.512421,
53.732136
],
[
-1.512391,
53.732181
],
[
-1.512391,
53.732181
],
[
-1.512283,
53.732342
],
[
-1.512189,
53.732548
],
[
-1.512127,
53.732737
],
[
-1.511953,
53.733293
],
[
-1.511953,
53.733293
],
[
-1.511922,
53.73341
],
[
-1.511809,
53.73394
],
[
-1.511787,
53.734123
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 3
- Record created
- Fri, Jul 10, 2026 2:02 AM
- Record versioned
- Fri, Jul 10, 2026 11:51 PM
- Coordinate source
- Geometry
Driving on the M1? See every live closure, roadwork and planned restriction on this road.
M1 live closuresRelated incidents
M1 southbound Jct 12 to Jct 11a hard shoulder closure (MP 59/4 to 58/2)
Planned Roadworks National HighwaysExpected to clear in 6 hours 56 minutes
M1 southbound Jct 12 to Jct 11a hard shoulder closure (MP 59/4 to 58/2)
M1 southbound Jct 14 to Jct 13 hard shoulder closure (MP 78/4 to 74/8)
Planned Roadworks National HighwaysExpected to clear in 6 hours 56 minutes
M1 southbound Jct 14 to Jct 13 hard shoulder closure (MP 78/4 to 74/8)
M1 southbound Jct 40 to Jct 39 Lane 1 and 2 closure (292/6 290/3)
Active Roadworks National HighwaysExpected to clear in 7 hours 56 minutes
M1 southbound Jct 40 to Jct 39 Lane 1 and 2 closure (292/6 290/3)
M1 northbound Jct 31 exit slip lane 1 closure
Planned Roadworks National HighwaysExpected to clear in 7 hours 56 minutes
M1 northbound Jct 31 exit slip lane 1 closure
Lane 3,4 closure southbound
Active Roadworks National HighwaysExpected to clear in 7 hours 56 minutes
Lane 3,4 closure southbound
M1 northbound Jct 45 to Jct 46 carriageway closure
Cleared Roadworks National HighwaysCleared 3 minutes 31 seconds ago
M1 northbound Jct 45 to Jct 46 carriageway closure