M1 northbound Jct 18 entry slip road closure
ClearedM1 northbound Jct 18 entry slip road closure
- Start time
- Sat, Jul 18, 2026 11:14 PM
- Expected end
- Sun, Jul 19, 2026 5:00 AM
- Duration
- 2 hours 26 minutes 2 seconds
- Category
- Road Maintenance
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Sat, Jul 18, 2026 11:14 PM
- Last updated
- Sun, Jul 19, 2026 1:20 AM
- Cleared
- Sun, Jul 19, 2026 1:40 AM
- Latest update: M1 northbound Jct 18 entry slip road closure
- Feed validity status
- Active
- Overall feed start
- Sat, Jul 18, 2026 11:14 PM
- Overall feed end
- Sun, Jul 19, 2026 5:00 AM
- Feed window length
- 5 hours 46 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Sat, Jul 18, 2026 11:14 PM
- Record versioned
- Sun, Jul 19, 2026 1:20 AM
Related incidents
A1M southbound Jct 37 to Jct 36 lane 1 closure
Active Roadworks National HighwaysExpected to clear in 5 hours 36 minutes
A1M southbound Jct 37 to Jct 36 lane 1 closure
M56 Eastbound lanes 2 and 3 closure (MP 52/1 to 47/0)
Active Roadworks National HighwaysExpected to clear in 5 hours 36 minutes
M56 Eastbound lanes 2 and 3 closure (MP 52/1 to 47/0)
M20 eastbound lane 1 and lane 2 closure (93/2A to 96/4A)
Planned Roadworks National HighwaysExpected to clear in 3 hours 36 minutes
M20 eastbound lane 1 and lane 2 closure (93/2A to 96/4A)
A282 Northbound Dartford Crossing West Tunnel closure
Active Roadworks National HighwaysExpected to clear in 5 hours 6 minutes
A282 Northbound Dartford Crossing West Tunnel closure
M42 southbound Jct 6 between the exit and entry slip roads carriageway closure
Planned Roadworks National HighwaysExpected to clear in 3 hours 36 minutes
M42 southbound Jct 6 between the exit and entry slip roads carriageway closure
A1 both directions approach to Biggleswade south roundabout to Edworth Road (AL12321) - lane 2 closure
Planned Roadworks National HighwaysExpected to clear in 4 hours 36 minutes
A1 both directions approach to Biggleswade south roundabout to Edworth Road (AL12321) - lane 2 closure