Lane closure eastbound
ClearedLane closure eastbound
- Start time
- Mon, Jul 20, 2026 7:00 PM
- Expected end
- Tue, Jul 21, 2026 4:00 AM
- Duration
- 55 minutes 2 seconds
- Road
- A50 – A50 Eastbound Within The A514 Junction
- Category
- Construction Work
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 2 closed, 1 of 1 lanes affected
- Reason
- Construction Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Jul 9, 2026 8:26 AM
- Last updated
- Mon, Jul 20, 2026 7:31 PM
- Cleared
- Mon, Jul 20, 2026 7:55 PM
- Latest update: Lane closure eastbound
- Coordinates
- 52.861251, -1.436560
- Latitude span
- 52.860194 – 52.863057
- Longitude span
- -1.455531 – -1.415440
- Bounding box centre
- 52.861626, -1.435486
- Location descriptions
-
- A50 eastbound within the A514 junction
- A50 eastbound between A38 and A514
- A50 eastbound between A514 and A6
- Feed validity status
- Planned
- Overall feed start
- Mon, Jul 20, 2026 7:00 PM
- Overall feed end
- Tue, Jul 21, 2026 4:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- A50 eastbound within the A514 junction
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A50
- Linear Element Model
- The Network Model
- Linear Element Id
- {B26FED36-812E-4EF2-BBAD-0515F8C19C0C}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 144 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.86085 -1.440451 52.860791 -1.44003 52.860701 -1.439383 52.860613 -1.438692 52.86057 -1.43836
Segment 2
3 coordinate pairs- Description
- A50 eastbound between A38 and A514
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A50
- Linear Element Model
- The Network Model
- Linear Element Id
- {158A4BAF-E1B6-4319-925B-BACD9D046684}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 43 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.861988 -1.447529 52.861923 -1.446987 52.861914 -1.446898
Segment 3
10 coordinate pairs- Description
- A50 eastbound between A514 and A6
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A50
- Linear Element Model
- The Network Model
- Linear Element Id
- {8405FE7E-994E-48E5-AC02-D6FD84562D7C}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 694 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.86076 -1.425003 52.860856 -1.424385 52.860944 -1.423913 52.861044 -1.423347 52.861187 -1.422637 52.861284 -1.422176 52.861662 -1.420418 52.862156 -1.418466 52.86258 -1.416945 52.863057 -1.41544
Segment 4
7 coordinate pairs- Description
- A50 eastbound within the A514 junction
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A50
- Linear Element Model
- The Network Model
- Linear Element Id
- {66A4CBE7-278C-4B26-8C5F-845BEE943CCB}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 368 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.86057 -1.43836 52.860402 -1.43704 52.860402 -1.43701 52.86033 -1.436001 52.860258 -1.434977 52.860206 -1.433329 52.860194 -1.432929
Segment 5
7 coordinate pairs- Description
- A50 eastbound within the A514 junction
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A50
- Linear Element Model
- The Network Model
- Linear Element Id
- {590BBDE2-86F6-4EE3-BC26-E3504F7CAAF4}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 449 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.861914 -1.446898 52.86171 -1.445594 52.861525 -1.444452 52.86128 -1.442968 52.861229 -1.442659 52.860878 -1.440643 52.86085 -1.440451
Segment 6
8 coordinate pairs- Description
- A50 eastbound between A514 and A6
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A50
- Linear Element Model
- The Network Model
- Linear Element Id
- {87C0D95A-593C-47F4-B979-61CA9524073A}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 538 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.860194 -1.432929 52.860201 -1.432423 52.860212 -1.431072 52.860302 -1.429229 52.860456 -1.427534 52.860546 -1.426691 52.860651 -1.425801 52.86076 -1.425003
Segment 7
8 coordinate pairs- Description
- A50 eastbound between A38 and A514
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A50
- Linear Element Model
- The Network Model
- Linear Element Id
- {932B0E19-3706-42B4-A10B-F8E30D39D79A}
- Linear Element Type
- B Carriageway
- From Distance
- 272 m
- To Distance
- 818 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.862777 -1.455531 52.862752 -1.455176 52.862675 -1.454107 52.86258 -1.452905 52.862542 -1.452431 52.862485 -1.451867 52.862316 -1.450265 52.861988 -1.447529
- Geometry type
- MultiLineString
- Geometry points
- 48
- First coordinate pair
- -1.440451, 52.860850
- Road section segments
- 1
- Road section points
- 48
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.440451,
52.86085
],
[
-1.44003,
52.860791
],
[
-1.439383,
52.860701
],
[
-1.438692,
52.860613
],
[
-1.43836,
52.86057
],
[
-1.447529,
52.861988
],
[
-1.446987,
52.861923
],
[
-1.446898,
52.861914
],
[
-1.425003,
52.86076
],
[
-1.424385,
52.860856
],
[
-1.423913,
52.860944
],
[
-1.423347,
52.861044
],
[
-1.422637,
52.861187
],
[
-1.422176,
52.861284
],
[
-1.420418,
52.861662
],
[
-1.418466,
52.862156
],
[
-1.416945,
52.86258
],
[
-1.41544,
52.863057
],
[
-1.43836,
52.86057
],
[
-1.43704,
52.860402
],
[
-1.43701,
52.860402
],
[
-1.436001,
52.86033
],
[
-1.434977,
52.860258
],
[
-1.433329,
52.860206
],
[
-1.432929,
52.860194
],
[
-1.446898,
52.861914
],
[
-1.445594,
52.86171
],
[
-1.444452,
52.861525
],
[
-1.442968,
52.86128
],
[
-1.442659,
52.861229
],
[
-1.440643,
52.860878
],
[
-1.440451,
52.86085
],
[
-1.432929,
52.860194
],
[
-1.432423,
52.860201
],
[
-1.431072,
52.860212
],
[
-1.429229,
52.860302
],
[
-1.427534,
52.860456
],
[
-1.426691,
52.860546
],
[
-1.425801,
52.860651
],
[
-1.425003,
52.86076
],
[
-1.455531,
52.862777
],
[
-1.455176,
52.862752
],
[
-1.454107,
52.862675
],
[
-1.452905,
52.86258
],
[
-1.452431,
52.862542
],
[
-1.451867,
52.862485
],
[
-1.450265,
52.862316
],
[
-1.447529,
52.861988
]
]
]
}
View road section coordinates
[
[
[
-1.440451,
52.86085
],
[
-1.44003,
52.860791
],
[
-1.439383,
52.860701
],
[
-1.438692,
52.860613
],
[
-1.43836,
52.86057
],
[
-1.447529,
52.861988
],
[
-1.446987,
52.861923
],
[
-1.446898,
52.861914
],
[
-1.425003,
52.86076
],
[
-1.424385,
52.860856
],
[
-1.423913,
52.860944
],
[
-1.423347,
52.861044
],
[
-1.422637,
52.861187
],
[
-1.422176,
52.861284
],
[
-1.420418,
52.861662
],
[
-1.418466,
52.862156
],
[
-1.416945,
52.86258
],
[
-1.41544,
52.863057
],
[
-1.43836,
52.86057
],
[
-1.43704,
52.860402
],
[
-1.43701,
52.860402
],
[
-1.436001,
52.86033
],
[
-1.434977,
52.860258
],
[
-1.433329,
52.860206
],
[
-1.432929,
52.860194
],
[
-1.446898,
52.861914
],
[
-1.445594,
52.86171
],
[
-1.444452,
52.861525
],
[
-1.442968,
52.86128
],
[
-1.442659,
52.861229
],
[
-1.440643,
52.860878
],
[
-1.440451,
52.86085
],
[
-1.432929,
52.860194
],
[
-1.432423,
52.860201
],
[
-1.431072,
52.860212
],
[
-1.429229,
52.860302
],
[
-1.427534,
52.860456
],
[
-1.426691,
52.860546
],
[
-1.425801,
52.860651
],
[
-1.425003,
52.86076
],
[
-1.455531,
52.862777
],
[
-1.455176,
52.862752
],
[
-1.454107,
52.862675
],
[
-1.452905,
52.86258
],
[
-1.452431,
52.862542
],
[
-1.451867,
52.862485
],
[
-1.450265,
52.862316
],
[
-1.447529,
52.861988
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Construction Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Jul 9, 2026 8:26 AM
- Record versioned
- Mon, Jul 20, 2026 7:31 PM
- Coordinate source
- Geometry
Driving on the A50? See every live closure, roadwork and planned restriction on this road.
A50 live closuresRelated incidents
Eastbound Full Closure
Planned Roadworks National HighwaysStarts in 9 hours 27 minutes
Eastbound Full Closure
Eastbound Lane 2 Closure
Planned Roadworks National HighwaysStarts in 8 hours 27 minutes
Eastbound Lane 2 Closure
Grindley Eastbound Exit Slip
Cleared Roadworks National HighwaysCleared 14 hours 32 minutes ago
Grindley Eastbound Exit Slip
Lane closure northbound
Cleared Roadworks National HighwaysCleared 10 hours 22 minutes ago
Lane closure northbound
A522 to B5030 Roundabout Eastbound Full Closure
Cleared Roadworks National HighwaysCleared 5 hours 32 minutes ago
A522 to B5030 Roundabout Eastbound Full Closure
Lane closure northbound (64/2-65/2)
Cleared Roadworks National HighwaysCleared 10 hours 47 minutes ago
Lane closure northbound (64/2-65/2)