Lane 3/2 closure
Clearedlane 3/2 closure
- Start time
- Wed, Jul 15, 2026 8:00 PM
- Expected end
- Thu, Jul 16, 2026 5:00 AM
- Duration
- 5 minutes 2 seconds
- Road
- M5 – M5 Northbound Between J12 And J11A
- Category
- Road Maintenance
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Lanes affected
- 2 of 2 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Jul 15, 2026 2:03 AM
- Last updated
- Wed, Jul 15, 2026 7:42 PM
- Cleared
- Wed, Jul 15, 2026 8:05 PM
- Latest update: lane 3/2 closure
- Coordinates
- 51.806277, -2.255922
- Latitude span
- 51.804948 – 51.807761
- Longitude span
- -2.261646 – -2.250518
- Bounding box centre
- 51.806355, -2.256082
- Location descriptions
-
- M5 northbound between J12 and J11A
- Feed validity status
- Planned
- Overall feed start
- Wed, Jul 15, 2026 8:00 PM
- Overall feed end
- Thu, Jul 16, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- M5 northbound between J12 and J11A
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {D3788972-695F-4E72-B3F0-7AF7A7187F6A}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 108 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.807322 -2.251922 51.807761 -2.250518
Segment 2
10 coordinate pairs- Description
- M5 northbound between J12 and J11A
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {0196E222-8682-4A26-8966-706856876C74}
- Linear Element Type
- B Carriageway
- From Distance
- 435 m
- To Distance
- 1,156 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.804948 -2.261646 51.80499 -2.261404 51.805373 -2.259483 51.805732 -2.257829 51.805765 -2.257678 51.80611 -2.256274 51.806354 -2.255292 51.80667 -2.254094 51.806979 -2.253006 51.807322 -2.251922
- Geometry type
- MultiLineString
- Geometry points
- 12
- First coordinate pair
- -2.251922, 51.807322
- Road section segments
- 1
- Road section points
- 12
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.251922,
51.807322
],
[
-2.250518,
51.807761
],
[
-2.261646,
51.804948
],
[
-2.261404,
51.80499
],
[
-2.259483,
51.805373
],
[
-2.257829,
51.805732
],
[
-2.257678,
51.805765
],
[
-2.256274,
51.80611
],
[
-2.255292,
51.806354
],
[
-2.254094,
51.80667
],
[
-2.253006,
51.806979
],
[
-2.251922,
51.807322
]
]
]
}
View road section coordinates
[
[
[
-2.251922,
51.807322
],
[
-2.250518,
51.807761
],
[
-2.261646,
51.804948
],
[
-2.261404,
51.80499
],
[
-2.259483,
51.805373
],
[
-2.257829,
51.805732
],
[
-2.257678,
51.805765
],
[
-2.256274,
51.80611
],
[
-2.255292,
51.806354
],
[
-2.254094,
51.80667
],
[
-2.253006,
51.806979
],
[
-2.251922,
51.807322
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, Jul 15, 2026 2:03 AM
- Record versioned
- Wed, Jul 15, 2026 7:42 PM
- Coordinate source
- Geometry
Driving on the M5? See every live closure, roadwork and planned restriction on this road.
M5 live closuresRelated incidents
M5 Southbound Jct 11a to 12 - hard shoulder closure on the entry slip from Gloucester services onto the M5
Active Roadworks National HighwaysExpected to clear in 1 week 4 days
M5 Southbound Jct 11a to 12 - hard shoulder closure on the entry slip from Gloucester services onto the M5
M5 northbound Jct 17 to 15 lane closures 133/5B to 131/3
Planned Roadworks National HighwaysStarts in 3 hours 11 minutes
M5 northbound Jct 17 to 15 lane closures 133/5B to 131/3
M5 northbound Jct 27 to 25 carriageway closure
Planned Roadworks National HighwaysStarts in 3 hours 11 minutes
M5 northbound Jct 27 to 25 carriageway closure
M5 Northbound Jct 12 to 11a lane 1 closure 94/7b - 93/9b
Planned Roadworks National HighwaysStarts in 3 hours 11 minutes
M5 Northbound Jct 12 to 11a lane 1 closure 94/7b - 93/9b
M5 northbound Jct 21 to Jct 20 single lane running (167/4 to 161/4)
Planned Roadworks National HighwaysStarts in 3 hours 11 minutes
M5 northbound Jct 21 to Jct 20 single lane running (167/4 to 161/4)
M5 northbound lane closures (167/4 to 161/4)
Planned Roadworks National HighwaysStarts in 3 hours 11 minutes
M5 northbound lane closures (167/4 to 161/4)