Lane 2 closure northbound
ClearedLane 2 closure northbound
- Start time
- Fri, Jun 26, 2026 8:00 PM
- Expected end
- Sat, Jun 27, 2026 5:00 AM
- Duration
- 55 minutes 2 seconds
- Road
- M6 – A500 Southbound Between A519 And M6
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 2 closed, 1 of 1 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Jun 1, 2026 1:38 PM
- Last updated
- Fri, Jun 26, 2026 7:16 PM
- Cleared
- Fri, Jun 26, 2026 8:55 PM
- Latest update: Lane 2 closure northbound
- Coordinates
- 52.975757, -2.224881
- Latitude span
- 52.975735 – 52.975776
- Longitude span
- -2.225516 – -2.224244
- Bounding box centre
- 52.975756, -2.224880
- Location descriptions
-
- A500 southbound between A519 and M6
- M6 J15 southbound access
- Feed validity status
- Planned
- Overall feed start
- Fri, Jun 26, 2026 8:00 PM
- Overall feed end
- Sat, Jun 27, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
6 coordinate pairs- Description
- A500 southbound between A519 and M6
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M6
- Linear Element Model
- The Network Model
- Linear Element Id
- {F4CC7A81-28B9-4A2A-BADC-E2A908251DC6}
- Linear Element Type
- Other
- From Distance
- 8 m
- To Distance
- 91 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.975735 -2.224244 52.975758 -2.224367 52.975776 -2.22453 52.975776 -2.224605 52.975775 -2.224828 52.97575 -2.22548
Segment 2
2 coordinate pairs- Description
- M6 J15 southbound access
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M6
- Linear Element Model
- The Network Model
- Linear Element Id
- {888B04DF-993E-43A7-BEB2-9AF2A50BD9CF}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 2 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.97575 -2.22548 52.975739 -2.225516
- Geometry type
- MultiLineString
- Geometry points
- 8
- First coordinate pair
- -2.224244, 52.975735
- Road section segments
- 1
- Road section points
- 8
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.224244,
52.975735
],
[
-2.224367,
52.975758
],
[
-2.22453,
52.975776
],
[
-2.224605,
52.975776
],
[
-2.224828,
52.975775
],
[
-2.22548,
52.97575
],
[
-2.22548,
52.97575
],
[
-2.225516,
52.975739
]
]
]
}
View road section coordinates
[
[
[
-2.224244,
52.975735
],
[
-2.224367,
52.975758
],
[
-2.22453,
52.975776
],
[
-2.224605,
52.975776
],
[
-2.224828,
52.975775
],
[
-2.22548,
52.97575
],
[
-2.22548,
52.97575
],
[
-2.225516,
52.975739
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Mon, Jun 1, 2026 1:38 PM
- Record versioned
- Fri, Jun 26, 2026 7:16 PM
- Coordinate source
- Geometry
Driving on the M6? See every live closure, roadwork and planned restriction on this road.
M6 live closuresRelated incidents
M6 Southbound Jct 42 to 41 Lane 1/2 closure (Mp 471/2 - 466/6)
Active Roadworks National HighwaysExpected to clear in 8 hours 23 minutes
M6 Southbound Jct 42 to 41 Lane 1/2 closure (Mp 471/2 - 466/6)
M6 Southbound Jct 41 entry slip road Lane 1 closure
Planned Roadworks National HighwaysExpected to clear in 4 years 5 months
M6 Southbound Jct 41 entry slip road Lane 1 closure
M6 southbound Jct 44 to 45 Lane 1 closure (Mp 503/2 - 498/1)
Active Roadworks National HighwaysExpected to clear in 5 days 8 hours
M6 southbound Jct 44 to 45 Lane 1 closure (Mp 503/2 - 498/1)
M6 northbound J16 to J17 - lane closure for structure - maintenance on behalf of National Highways
Planned Roadworks National HighwaysExpected to clear in 2 months 1 week
M6 northbound J16 to J17 - lane closure for structure - maintenance on behalf of National Highways
M6 southbound jct 17 exit slip road closure
Planned Roadworks National HighwaysStarts in 2 hours 23 minutes
M6 southbound jct 17 exit slip road closure
M6 Southbound Jct 18 to 17 carriageway closure
Planned Roadworks National HighwaysStarts in 2 hours 23 minutes
M6 Southbound Jct 18 to 17 carriageway closure