Lane 1,2 closure eastbound
ClearedLane 1,2 closure eastbound
- Start time
- Fri, Jul 17, 2026 7:00 PM
- Expected end
- Sat, Jul 18, 2026 5:00 AM
- Duration
- 2 seconds
- Road
- A50 – A50 Eastbound Between B6540 And M1
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- 2 of 1 lanes affected, 1 of 1 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Jul 17, 2026 1:29 AM
- Last updated
- Fri, Jul 17, 2026 5:32 PM
- Cleared
- Fri, Jul 17, 2026 7:00 PM
- Latest update: Lane 1,2 closure eastbound
- Coordinates
- 52.857974, -1.312343
- Latitude span
- 52.856006 – 52.860499
- Longitude span
- -1.319510 – -1.305493
- Bounding box centre
- 52.858253, -1.312502
- Location descriptions
-
- A50 eastbound between B6540 and M1
- A50 eastbound within the B6540 junction
- link road from A50 eastbound to M1 J24A northbound
- Feed validity status
- Planned
- Overall feed start
- Fri, Jul 17, 2026 7:00 PM
- Overall feed end
- Sat, Jul 18, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
7 coordinate pairs- Description
- A50 eastbound between B6540 and M1
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- A50
- Linear Element Model
- The Network Model
- Linear Element Id
- {7DEE70F1-7157-43FD-8A71-121261915483}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 277 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.856651 -1.309858 52.856602 -1.309703 52.856398 -1.309007 52.856253 -1.308257 52.856104 -1.307141 52.856067 -1.306794 52.856006 -1.305915
Segment 2
2 coordinate pairs- Description
- A50 eastbound within the B6540 junction
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A50
- Linear Element Model
- The Network Model
- Linear Element Id
- {D6C0F251-4378-4AF1-A3B5-32A400AA4604}
- Linear Element Type
- B Carriageway
- From Distance
- 378 m
- To Distance
- 424 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.860499 -1.31951 52.86039 -1.318845
Segment 3
16 coordinate pairs- Description
- A50 eastbound between B6540 and M1
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- A50
- Linear Element Model
- The Network Model
- Linear Element Id
- {499DE226-F7F8-4BDF-9A27-1101328A8076}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 740 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.86039 -1.318845 52.86024 -1.318196 52.860006 -1.31726 52.859822 -1.316639 52.85961 -1.316048 52.859493 -1.315722 52.859151 -1.314907 52.858956 -1.314512 52.85855 -1.313686 52.858386 -1.313362 52.858266 -1.313146 52.857542 -1.311846 52.857388 -1.311541 52.857054 -1.310908 52.856802 -1.310333 52.856651 -1.309858
Segment 4
2 coordinate pairs- Description
- link road from A50 eastbound to M1 J24A northbound
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M1
- Linear Element Model
- The Network Model
- Linear Element Id
- {D7967784-3F05-4270-86F3-9F74295F94E0}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 28 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.856006 -1.305915 52.856015 -1.305493
- Geometry type
- MultiLineString
- Geometry points
- 27
- First coordinate pair
- -1.309858, 52.856651
- Road section segments
- 1
- Road section points
- 27
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.309858,
52.856651
],
[
-1.309703,
52.856602
],
[
-1.309007,
52.856398
],
[
-1.308257,
52.856253
],
[
-1.307141,
52.856104
],
[
-1.306794,
52.856067
],
[
-1.305915,
52.856006
],
[
-1.31951,
52.860499
],
[
-1.318845,
52.86039
],
[
-1.318845,
52.86039
],
[
-1.318196,
52.86024
],
[
-1.31726,
52.860006
],
[
-1.316639,
52.859822
],
[
-1.316048,
52.85961
],
[
-1.315722,
52.859493
],
[
-1.314907,
52.859151
],
[
-1.314512,
52.858956
],
[
-1.313686,
52.85855
],
[
-1.313362,
52.858386
],
[
-1.313146,
52.858266
],
[
-1.311846,
52.857542
],
[
-1.311541,
52.857388
],
[
-1.310908,
52.857054
],
[
-1.310333,
52.856802
],
[
-1.309858,
52.856651
],
[
-1.305915,
52.856006
],
[
-1.305493,
52.856015
]
]
]
}
View road section coordinates
[
[
[
-1.309858,
52.856651
],
[
-1.309703,
52.856602
],
[
-1.309007,
52.856398
],
[
-1.308257,
52.856253
],
[
-1.307141,
52.856104
],
[
-1.306794,
52.856067
],
[
-1.305915,
52.856006
],
[
-1.31951,
52.860499
],
[
-1.318845,
52.86039
],
[
-1.318845,
52.86039
],
[
-1.318196,
52.86024
],
[
-1.31726,
52.860006
],
[
-1.316639,
52.859822
],
[
-1.316048,
52.85961
],
[
-1.315722,
52.859493
],
[
-1.314907,
52.859151
],
[
-1.314512,
52.858956
],
[
-1.313686,
52.85855
],
[
-1.313362,
52.858386
],
[
-1.313146,
52.858266
],
[
-1.311846,
52.857542
],
[
-1.311541,
52.857388
],
[
-1.310908,
52.857054
],
[
-1.310333,
52.856802
],
[
-1.309858,
52.856651
],
[
-1.305915,
52.856006
],
[
-1.305493,
52.856015
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Fri, Jul 17, 2026 1:29 AM
- Record versioned
- Fri, Jul 17, 2026 5:32 PM
- Coordinate source
- Geometry
Driving on the A50? See every live closure, roadwork and planned restriction on this road.
A50 live closuresRelated incidents
Lane closure eastbound
Active Roadworks National HighwaysExpected to clear in 5 hours 26 minutes
Lane closure eastbound
Lane 2,3,4 closure northbound
Planned Roadworks National HighwaysExpected to clear in 6 hours 26 minutes
Lane 2,3,4 closure northbound
Exit slip road lane closure northbound
Planned Roadworks National HighwaysExpected to clear in 6 hours 26 minutes
Exit slip road lane closure northbound
Eastbound Catchems to Tean
Cleared Roadworks National HighwaysCleared 3 hours 33 minutes ago
Eastbound Catchems to Tean
Eastbound Tean to A522
Cleared Roadworks National HighwaysCleared 3 hours 33 minutes ago
Eastbound Tean to A522
Lane closure eastbound
Cleared Roadworks National HighwaysCleared 2 hours 38 minutes ago
Lane closure eastbound