Lane 1 closure northbound
ClearedLane 1 closure northbound
- Start time
- Mon, Sep 14, 2026 8:00 PM
- Expected end
- Tue, Sep 15, 2026 5:00 AM
- Duration
- 7 hours 50 minutes 1 second
- Road
- A500 – A500 Northbound Between A34 Near Stoke-On-Trent (North) And M6
- Category
- Road Maintenance
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 1 lanes affected
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Sep 1, 2026 9:41 AM
- Last updated
- Tue, Sep 15, 2026 3:30 AM
- Cleared
- Tue, Sep 15, 2026 3:50 AM
- Latest update: Lane 1 closure northbound
- Coordinates
- 53.069461, -2.324749
- Latitude span
- 53.068881 – 53.069880
- Longitude span
- -2.331915 – -2.316909
- Bounding box centre
- 53.069381, -2.324412
- Location descriptions
-
- A500 northbound between A34 near Stoke-on-Trent (north) and M6
- Feed validity status
- Planned
- Overall feed start
- Mon, Sep 14, 2026 8:00 PM
- Overall feed end
- Tue, Sep 15, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
13 coordinate pairs- Description
- A500 northbound between A34 near Stoke-on-Trent (north) and M6
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A500
- Linear Element Model
- The Network Model
- Linear Element Id
- {ED7BA1C6-CD05-4158-A881-B4F4ABB90783}
- Linear Element Type
- A Carriageway
- From Distance
- 431 m
- To Distance
- 971 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.068881 -2.316909 53.068881 -2.317128 53.068906 -2.317859 53.068922 -2.318292 53.068931 -2.318516 53.068974 -2.319128 53.069097 -2.320323 53.069244 -2.321241 53.06946 -2.322437 53.069619 -2.323256 53.069761 -2.324153 53.069802 -2.324547 53.069821 -2.324776
Segment 2
16 coordinate pairs- Description
- A500 northbound between A34 near Stoke-on-Trent (north) and M6
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A500
- Linear Element Model
- The Network Model
- Linear Element Id
- {232236F0-355D-4C79-B6F0-F5A58BDE682F}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 494 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.069821 -2.324776 53.069865 -2.325314 53.069873 -2.325702 53.069877 -2.32606 53.06988 -2.326389 53.06988 -2.326583 53.069851 -2.327164 53.069787 -2.327806 53.069759 -2.328149 53.069658 -2.328745 53.069612 -2.329028 53.06953 -2.329401 53.069448 -2.329788 53.069294 -2.330458 53.068979 -2.331878 53.068968 -2.331915
- Geometry type
- MultiLineString
- Geometry points
- 29
- First coordinate pair
- -2.316909, 53.068881
- Road section segments
- 1
- Road section points
- 29
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.316909,
53.068881
],
[
-2.317128,
53.068881
],
[
-2.317859,
53.068906
],
[
-2.318292,
53.068922
],
[
-2.318516,
53.068931
],
[
-2.319128,
53.068974
],
[
-2.320323,
53.069097
],
[
-2.321241,
53.069244
],
[
-2.322437,
53.06946
],
[
-2.323256,
53.069619
],
[
-2.324153,
53.069761
],
[
-2.324547,
53.069802
],
[
-2.324776,
53.069821
],
[
-2.324776,
53.069821
],
[
-2.325314,
53.069865
],
[
-2.325702,
53.069873
],
[
-2.32606,
53.069877
],
[
-2.326389,
53.06988
],
[
-2.326583,
53.06988
],
[
-2.327164,
53.069851
],
[
-2.327806,
53.069787
],
[
-2.328149,
53.069759
],
[
-2.328745,
53.069658
],
[
-2.329028,
53.069612
],
[
-2.329401,
53.06953
],
[
-2.329788,
53.069448
],
[
-2.330458,
53.069294
],
[
-2.331878,
53.068979
],
[
-2.331915,
53.068968
]
]
]
}
View road section coordinates
[
[
[
-2.316909,
53.068881
],
[
-2.317128,
53.068881
],
[
-2.317859,
53.068906
],
[
-2.318292,
53.068922
],
[
-2.318516,
53.068931
],
[
-2.319128,
53.068974
],
[
-2.320323,
53.069097
],
[
-2.321241,
53.069244
],
[
-2.322437,
53.06946
],
[
-2.323256,
53.069619
],
[
-2.324153,
53.069761
],
[
-2.324547,
53.069802
],
[
-2.324776,
53.069821
],
[
-2.324776,
53.069821
],
[
-2.325314,
53.069865
],
[
-2.325702,
53.069873
],
[
-2.32606,
53.069877
],
[
-2.326389,
53.06988
],
[
-2.326583,
53.06988
],
[
-2.327164,
53.069851
],
[
-2.327806,
53.069787
],
[
-2.328149,
53.069759
],
[
-2.328745,
53.069658
],
[
-2.329028,
53.069612
],
[
-2.329401,
53.06953
],
[
-2.329788,
53.069448
],
[
-2.330458,
53.069294
],
[
-2.331878,
53.068979
],
[
-2.331915,
53.068968
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Tue, Sep 1, 2026 9:41 AM
- Record versioned
- Tue, Sep 15, 2026 3:30 AM
- Coordinate source
- Geometry
Driving on the A500? See every live closure, roadwork and planned restriction on this road.
A500 live closuresRelated incidents
M6 southbound Jct 16 to Jct 15 carriageway closure
Planned Roadworks National HighwaysStarts in 10 hours 30 minutes
M6 southbound Jct 16 to Jct 15 carriageway closure
A500 northbound Campbell road link to Queensway roundabout carriageway closure
Planned Roadworks National HighwaysStarts in 9 hours 30 minutes
A500 northbound Campbell road link to Queensway roundabout carriageway closure
A500 northbound Campbell road link to Queensway roundabout carriageway closure
Cleared Roadworks National HighwaysCleared 2 days 4 hours ago
A500 northbound Campbell road link to Queensway roundabout carriageway closure
A500 southbound Wheldon exit slip road closure
Cleared Roadworks National HighwaysCleared 3 days 13 hours ago
A500 southbound Wheldon exit slip road closure
A500 southbound Wheldon exit slip road closure
Cleared Roadworks National HighwaysCleared 3 days 10 hours ago
A500 southbound Wheldon exit slip road closure
A500 northbound Campbell road link to Queensway roundabout carriageway closure
Cleared Roadworks National HighwaysCleared 3 days 9 hours ago
A500 northbound Campbell road link to Queensway roundabout carriageway closure