Grindley Eastbound Exit Slip
ClearedGrindley Eastbound Exit Slip
- Start time
- Wed, Jul 29, 2026 7:00 PM
- Expected end
- Thu, Jul 30, 2026 4:00 AM
- Duration
- 1 second
- Road
- A50 – A50 Eastbound Exit For B5029
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Reason
- Repair Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Jul 29, 2026 1:52 AM
- Last updated
- Wed, Jul 29, 2026 5:30 PM
- Cleared
- Wed, Jul 29, 2026 7:00 PM
- Latest update: Grindley Eastbound Exit Slip
- Coordinates
- 52.967926, -2.079907
- Latitude span
- 52.967050 – 52.968500
- Longitude span
- -2.081360 – -2.077453
- Bounding box centre
- 52.967775, -2.079407
- Location descriptions
-
- A50 eastbound exit for B5029
- A50 eastbound between A521 near Cheadle (west) and B5029
- Feed validity status
- Planned
- Overall feed start
- Wed, Jul 29, 2026 7:00 PM
- Overall feed end
- Thu, Jul 30, 2026 4:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- A50 eastbound exit for B5029
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A50
- Linear Element Model
- The Network Model
- Linear Element Id
- {8513924B-1CE0-4CD7-8A4C-DB53EFE16BF4}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 234 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.968097 -2.080479 52.967908 -2.079868 52.967101 -2.077634 52.96705 -2.077453
Segment 2
4 coordinate pairs- Description
- A50 eastbound between A521 near Cheadle (west) and B5029
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A50
- Linear Element Model
- The Network Model
- Linear Element Id
- {53A71A21-0CB4-4529-909A-5C3CB91920C0}
- Linear Element Type
- B Carriageway
- From Distance
- 312 m
- To Distance
- 387 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.9685 -2.08136 52.96842 -2.081191 52.968231 -2.080792 52.968097 -2.080479
- Geometry type
- MultiLineString
- Geometry points
- 8
- First coordinate pair
- -2.080479, 52.968097
- Road section segments
- 1
- Road section points
- 8
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.080479,
52.968097
],
[
-2.079868,
52.967908
],
[
-2.077634,
52.967101
],
[
-2.077453,
52.96705
],
[
-2.08136,
52.9685
],
[
-2.081191,
52.96842
],
[
-2.080792,
52.968231
],
[
-2.080479,
52.968097
]
]
]
}
View road section coordinates
[
[
[
-2.080479,
52.968097
],
[
-2.079868,
52.967908
],
[
-2.077634,
52.967101
],
[
-2.077453,
52.96705
],
[
-2.08136,
52.9685
],
[
-2.081191,
52.96842
],
[
-2.080792,
52.968231
],
[
-2.080479,
52.968097
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Repair Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed region label
- Cheadle
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, Jul 29, 2026 1:52 AM
- Record versioned
- Wed, Jul 29, 2026 5:30 PM
- Coordinate source
- Geometry
Driving on the A50? See every live closure, roadwork and planned restriction on this road.
A50 live closuresRelated incidents
Eastbound Full Closure
Planned Roadworks National HighwaysStarts in 5 hours 18 minutes
Eastbound Full Closure
Eastbound Lane 2 Closure
Planned Roadworks National HighwaysStarts in 4 hours 18 minutes
Eastbound Lane 2 Closure
A522 to B5030 Roundabout Eastbound Full Closure
Cleared Roadworks National HighwaysCleared 9 hours 41 minutes ago
A522 to B5030 Roundabout Eastbound Full Closure
Catchems Eastbound Entry Slip
Cleared Roadworks National HighwaysCleared 18 hours 41 minutes ago
Catchems Eastbound Entry Slip
B5030 to A518 Rbt full Closure
Cleared Roadworks National HighwaysCleared 13 hours 16 minutes ago
B5030 to A518 Rbt full Closure
Catchems Eastbound Entry Slip
Cleared Roadworks National HighwaysCleared 10 hours 51 minutes ago
Catchems Eastbound Entry Slip