A66 Eastbound Temple Sowerby (NW) Entry slip road closure
ClearedA66 Eastbound Temple Sowerby (NW) Entry slip road closure
- Start time
- Wed, Oct 14, 2026 10:59 PM
- Expected end
- Thu, Oct 15, 2026 5:00 AM
- Duration
- 4 hours 6 minutes 2 seconds
- Road
- A66 – A66 Eastbound Exit For B6412
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Singlecarriageway
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Oct 14, 2026 10:57 AM
- Last updated
- Thu, Oct 15, 2026 2:47 AM
- Cleared
- Thu, Oct 15, 2026 3:05 AM
- Latest update: A66 Eastbound Temple Sowerby (NW) Entry slip road closure
- Coordinates
- 54.649293, -2.625046
- Latitude span
- 54.648863 – 54.649988
- Longitude span
- -2.625494 – -2.624539
- Bounding box centre
- 54.649426, -2.625017
- Location descriptions
-
- A66 eastbound exit for B6412
- Feed validity status
- Planned
- Overall feed start
- Wed, Oct 14, 2026 10:59 PM
- Overall feed end
- Thu, Oct 15, 2026 5:00 AM
- Feed window length
- 6 hours 1 minute
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
7 coordinate pairs- Description
- A66 eastbound exit for B6412
- Carriageway
- Single Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Both
- Height Grade
- Start1 End1
- Linear Element Road
- A66
- Linear Element Model
- The Network Model
- Linear Element Id
- {23322EFA-4C6D-413D-AEFE-AAF6DE8C52B5}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 134 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
54.648887 -2.625384 54.648973 -2.625278 54.649167 -2.625081 54.649367 -2.62491 54.649632 -2.624744 54.649873 -2.624604 54.649988 -2.624539
Segment 2
2 coordinate pairs- Description
- A66 eastbound exit for B6412
- Carriageway
- Single Carriageway
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A66
- Linear Element Model
- The Network Model
- Linear Element Id
- {59A78CE3-2523-47EB-A43E-3CEF289EC9F1}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 25 m
- To Distance
- 33 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
54.648863 -2.625494 54.648887 -2.625384
- Geometry type
- MultiLineString
- Geometry points
- 9
- First coordinate pair
- -2.625384, 54.648887
- Road section segments
- 1
- Road section points
- 9
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.625384,
54.648887
],
[
-2.625278,
54.648973
],
[
-2.625081,
54.649167
],
[
-2.62491,
54.649367
],
[
-2.624744,
54.649632
],
[
-2.624604,
54.649873
],
[
-2.624539,
54.649988
],
[
-2.625494,
54.648863
],
[
-2.625384,
54.648887
]
]
]
}
View road section coordinates
[
[
[
-2.625384,
54.648887
],
[
-2.625278,
54.648973
],
[
-2.625081,
54.649167
],
[
-2.62491,
54.649367
],
[
-2.624744,
54.649632
],
[
-2.624604,
54.649873
],
[
-2.624539,
54.649988
],
[
-2.625494,
54.648863
],
[
-2.625384,
54.648887
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Wed, Oct 14, 2026 10:57 AM
- Record versioned
- Thu, Oct 15, 2026 2:47 AM
- Coordinate source
- Geometry
Driving on the A66? See every live closure, roadwork and planned restriction on this road.
A66 live closuresRelated incidents
M6 Northbound Jct 39 entry slip road Lane 1 closure
Planned Roadworks National HighwaysExpected to clear in 4 years 2 months
M6 Northbound Jct 39 entry slip road Lane 1 closure
A66 Eastbound Brough Entry slip road closure
Planned Roadworks National HighwaysStarts in 15 hours 18 minutes
A66 Eastbound Brough Entry slip road closure
A66 Eastbound Kemplay Roundabout to Temple Sowerby Carriageway closure
Cleared Roadworks National HighwaysCleared 51 minutes 42 seconds ago
A66 Eastbound Kemplay Roundabout to Temple Sowerby Carriageway closure
A66 Elton eastbound lane 2 closure
Cleared Roadworks National HighwaysCleared 8 hours 11 minutes ago
A66 Elton eastbound lane 2 closure
M6 Southbound Jct 40 Exit slip road lane 1 closure
Cleared Roadworks National HighwaysCleared 36 minutes 42 seconds ago
M6 Southbound Jct 40 Exit slip road lane 1 closure
M6 Northbound Junction 39 to 40 lane 1 and 2 closure (450/0A to 451/5A)
Cleared Roadworks National HighwaysCleared 11 minutes 42 seconds ago
M6 Northbound Junction 39 to 40 lane 1 and 2 closure (450/0A to 451/5A)