A66 Eastbound redhill to Jct 40 Lane 1 closure
ClearedA66 Eastbound redhill to Jct 40 Lane 1 closure
- Start time
- Wed, Sep 30, 2026 6:00 PM
- Expected end
- Thu, Oct 1, 2026 5:00 AM
- Duration
- 2 hours 50 minutes 2 seconds
- Road
- A66 – A66 Eastbound Between A592 And M6
- Category
- Construction Work
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 1 lanes affected
- Reason
- Road Improvement Or Upgrading
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Sep 22, 2026 10:14 AM
- Last updated
- Wed, Sep 30, 2026 8:20 PM
- Cleared
- Wed, Sep 30, 2026 8:50 PM
- Latest update: A66 Eastbound redhill to Jct 40 Lane 1 closure
- Coordinates
- 54.651824, -2.765603
- Latitude span
- 54.650183 – 54.652686
- Longitude span
- -2.773551 – -2.761676
- Bounding box centre
- 54.651435, -2.767614
- Location descriptions
-
- A66 eastbound between A592 and M6
- Feed validity status
- Planned
- Overall feed start
- Wed, Sep 30, 2026 6:00 PM
- Overall feed end
- Thu, Oct 1, 2026 5:00 AM
- Feed window length
- 11 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
6 coordinate pairs- Description
- A66 eastbound between A592 and M6
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A66
- Linear Element Model
- The Network Model
- Linear Element Id
- {C6FAF00A-1E33-4D88-B173-BC36FA4F88CF}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 184 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
54.652031 -2.764964 54.652096 -2.764671 54.652282 -2.763745 54.652432 -2.76274 54.65247 -2.762431 54.652498 -2.76223
Segment 2
6 coordinate pairs- Description
- A66 eastbound between A592 and M6
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A66
- Linear Element Model
- The Network Model
- Linear Element Id
- {4C2A8810-B938-483B-8C39-FC7942803002}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 42 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
54.652498 -2.76223 54.652542 -2.761992 54.652608 -2.761816 54.652657 -2.761728 54.652681 -2.761685 54.652686 -2.761676
Segment 3
8 coordinate pairs- Description
- A66 eastbound between A592 and M6
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A66
- Linear Element Model
- The Network Model
- Linear Element Id
- {40E842C2-4440-47A7-923F-45F9B275300E}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 241 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
54.651183 -2.768406 54.651247 -2.768111 54.651284 -2.767957 54.651454 -2.767252 54.651467 -2.767194 54.651615 -2.766634 54.651818 -2.765825 54.652031 -2.764964
Segment 4
5 coordinate pairs- Description
- A66 eastbound between A592 and M6
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A66
- Linear Element Model
- The Network Model
- Linear Element Id
- {C34459E3-DF27-4669-A4B9-99D4BFDAE759}
- Linear Element Type
- A Carriageway
- From Distance
- 508 m
- To Distance
- 858 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
54.650183 -2.773551 54.650639 -2.771221 54.650928 -2.769735 54.651088 -2.768903 54.651183 -2.768406
- Geometry type
- MultiLineString
- Geometry points
- 25
- First coordinate pair
- -2.764964, 54.652031
- Road section segments
- 1
- Road section points
- 25
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.764964,
54.652031
],
[
-2.764671,
54.652096
],
[
-2.763745,
54.652282
],
[
-2.76274,
54.652432
],
[
-2.762431,
54.65247
],
[
-2.76223,
54.652498
],
[
-2.76223,
54.652498
],
[
-2.761992,
54.652542
],
[
-2.761816,
54.652608
],
[
-2.761728,
54.652657
],
[
-2.761685,
54.652681
],
[
-2.761676,
54.652686
],
[
-2.768406,
54.651183
],
[
-2.768111,
54.651247
],
[
-2.767957,
54.651284
],
[
-2.767252,
54.651454
],
[
-2.767194,
54.651467
],
[
-2.766634,
54.651615
],
[
-2.765825,
54.651818
],
[
-2.764964,
54.652031
],
[
-2.773551,
54.650183
],
[
-2.771221,
54.650639
],
[
-2.769735,
54.650928
],
[
-2.768903,
54.651088
],
[
-2.768406,
54.651183
]
]
]
}
View road section coordinates
[
[
[
-2.764964,
54.652031
],
[
-2.764671,
54.652096
],
[
-2.763745,
54.652282
],
[
-2.76274,
54.652432
],
[
-2.762431,
54.65247
],
[
-2.76223,
54.652498
],
[
-2.76223,
54.652498
],
[
-2.761992,
54.652542
],
[
-2.761816,
54.652608
],
[
-2.761728,
54.652657
],
[
-2.761685,
54.652681
],
[
-2.761676,
54.652686
],
[
-2.768406,
54.651183
],
[
-2.768111,
54.651247
],
[
-2.767957,
54.651284
],
[
-2.767252,
54.651454
],
[
-2.767194,
54.651467
],
[
-2.766634,
54.651615
],
[
-2.765825,
54.651818
],
[
-2.764964,
54.652031
],
[
-2.773551,
54.650183
],
[
-2.771221,
54.650639
],
[
-2.769735,
54.650928
],
[
-2.768903,
54.651088
],
[
-2.768406,
54.651183
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Road Improvement Or Upgrading
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Tue, Sep 22, 2026 10:14 AM
- Record versioned
- Wed, Sep 30, 2026 8:20 PM
- Coordinate source
- Geometry
Driving on the A66? See every live closure, roadwork and planned restriction on this road.
A66 live closuresRelated incidents
A66 Eastbound Temple Sowerby (NW) Entry slip road closure
Planned Roadworks National HighwaysStarts in 4 hours 59 minutes
A66 Eastbound Temple Sowerby (NW) Entry slip road closure
A66 Elton eastbound lane 2 closure
Planned Roadworks National HighwaysStarts in 1 hour 21 seconds
A66 Elton eastbound lane 2 closure
A66 Eastbound Brough Entry slip road closure
Planned Roadworks National HighwaysStarts in 1 hour 21 seconds
A66 Eastbound Brough Entry slip road closure
A66 Hulands Quarry to Boldron eastbound lane 1 closure
Planned Roadworks National HighwaysStarts in 1 hour 21 seconds
A66 Hulands Quarry to Boldron eastbound lane 1 closure
M6 Southbound Jct 40 Exit slip road lane 1 closure
Planned Roadworks National HighwaysStarts in 21 seconds
M6 Southbound Jct 40 Exit slip road lane 1 closure
A66 Eastbound and Westbound Kirkby Thore Traffic signals
Cleared Roadworks National HighwaysCleared 1 day 16 hours ago
A66 Eastbound and Westbound Kirkby Thore Traffic signals