A63 eastbound western Interchange exit slip road closure
ClearedA63 eastbound western Interchange exit slip road closure
- Start time
- Wed, Jul 1, 2026 6:59 PM
- Expected end
- Thu, Jul 2, 2026 5:00 AM
- Duration
- 5 hours 1 minute 1 second
- Category
- Road Maintenance
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Jul 1, 2026 6:59 PM
- Last updated
- Wed, Jul 1, 2026 11:54 PM
- Cleared
- Thu, Jul 2, 2026 12:00 AM
- Latest update: A63 eastbound western Interchange exit slip road closure
- Feed validity status
- Active
- Overall feed start
- Wed, Jul 1, 2026 6:59 PM
- Overall feed end
- Thu, Jul 2, 2026 5:00 AM
- Feed window length
- 10 hours 1 minute
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, Jul 1, 2026 6:59 PM
- Record versioned
- Wed, Jul 1, 2026 11:54 PM
Related incidents
A1M Jct 50 northhbound exit slip road lane 1 closure with switch
Active Roadworks National HighwaysExpected to clear in 1 hour 24 minutes
A1M Jct 50 northhbound exit slip road lane 1 closure with switch
M1 southbound Jct 15 to Jct 14 lane closure (MP 83/5 to 81/2)
Active Roadworks National HighwaysExpected to clear in 6 hours 25 minutes
M1 southbound Jct 15 to Jct 14 lane closure (MP 83/5 to 81/2)
M48 eastbound Jct 2 to 1 lane 1 closure (199/9B to 194/6B)
Active Roadworks National HighwaysExpected to clear in 1 hour 26 minutes
M48 eastbound Jct 2 to 1 lane 1 closure (199/9B to 194/6B)
A282 Northbound Dartford Crossing West Tunnel closure
Active Roadworks National HighwaysExpected to clear in 6 hours 55 minutes
A282 Northbound Dartford Crossing West Tunnel closure
A3M northbound Jct 1 entry slip road closure
Active Roadworks National HighwaysExpected to clear in 7 hours 25 minutes
A3M northbound Jct 1 entry slip road closure
A14 both directions Spaldwick to Ellington lane 2 closures (MP 63/6 to 65/8)
Active Roadworks National HighwaysExpected to clear in 7 hours 25 minutes
A14 both directions Spaldwick to Ellington lane 2 closures (MP 63/6 to 65/8)