A55 eastbound jct 40 entry slip road closure
ClearedA55 eastbound jct 40 entry slip road closure
- Start time
- Sat, Sep 26, 2026 8:00 PM
- Expected end
- Sun, Sep 27, 2026 5:00 AM
- Duration
- 1 second
- Road
- A55 – A55 Eastbound Access From A51
- Category
- Road Maintenance
- Direction
- Eastbound
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Jul 2, 2026 12:56 PM
- Last updated
- Sat, Sep 26, 2026 3:20 AM
- Cleared
- Sat, Sep 26, 2026 8:00 PM
- Latest update: A55 eastbound jct 40 entry slip road closure
- Coordinates
- 53.196787, -2.844755
- Latitude span
- 53.195228 – 53.198376
- Longitude span
- -2.845385 – -2.844241
- Bounding box centre
- 53.196802, -2.844813
- Location descriptions
-
- A55 eastbound access from A51
- Feed validity status
- Planned
- Overall feed start
- Sat, Sep 26, 2026 8:00 PM
- Overall feed end
- Sun, Sep 27, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
10 coordinate pairs- Description
- A55 eastbound access from A51
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A55
- Linear Element Model
- The Network Model
- Linear Element Id
- {BD3C0C7A-6571-4BCF-B716-6EB5DB66FF60}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 12 m
- To Distance
- 291 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.195228 -2.845385 53.195619 -2.845145 53.195908 -2.844986 53.196052 -2.844929 53.196205 -2.844872 53.19643 -2.844817 53.196466 -2.844808 53.197097 -2.84465 53.197556 -2.844539 53.197673 -2.844512
Segment 2
3 coordinate pairs- Description
- A55 eastbound access from A51
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A55
- Linear Element Model
- The Network Model
- Linear Element Id
- {C05740C5-262F-4169-8A9B-F814E8698AB2}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 80 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.197673 -2.844512 53.197952 -2.844413 53.198376 -2.844241
- Geometry type
- MultiLineString
- Geometry points
- 13
- First coordinate pair
- -2.845385, 53.195228
- Road section segments
- 1
- Road section points
- 13
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.845385,
53.195228
],
[
-2.845145,
53.195619
],
[
-2.844986,
53.195908
],
[
-2.844929,
53.196052
],
[
-2.844872,
53.196205
],
[
-2.844817,
53.19643
],
[
-2.844808,
53.196466
],
[
-2.84465,
53.197097
],
[
-2.844539,
53.197556
],
[
-2.844512,
53.197673
],
[
-2.844512,
53.197673
],
[
-2.844413,
53.197952
],
[
-2.844241,
53.198376
]
]
]
}
View road section coordinates
[
[
[
-2.845385,
53.195228
],
[
-2.845145,
53.195619
],
[
-2.844986,
53.195908
],
[
-2.844929,
53.196052
],
[
-2.844872,
53.196205
],
[
-2.844817,
53.19643
],
[
-2.844808,
53.196466
],
[
-2.84465,
53.197097
],
[
-2.844539,
53.197556
],
[
-2.844512,
53.197673
],
[
-2.844512,
53.197673
],
[
-2.844413,
53.197952
],
[
-2.844241,
53.198376
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Thu, Jul 2, 2026 12:56 PM
- Record versioned
- Sat, Sep 26, 2026 3:20 AM
- Coordinate source
- Geometry
Driving on the A55? See every live closure, roadwork and planned restriction on this road.
A55 live closuresRelated incidents
A55 Westbound Jct 39 entry slip road closure
Cleared Roadworks National HighwaysCleared 48 minutes 51 seconds ago
A55 Westbound Jct 39 entry slip road closure
A55 Eastbound lane 1 closure (MP 134/0 to 135/4)
Cleared Roadworks National HighwaysCleared 3 hours 53 minutes ago
A55 Eastbound lane 1 closure (MP 134/0 to 135/4)
A55 Westbound Jct 39 entry slip road closure
Cleared Roadworks National HighwaysCleared 3 hours 53 minutes ago
A55 Westbound Jct 39 entry slip road closure
M53 southbound jct 9 exit slip road closure
Cleared Roadworks National HighwaysCleared 2 days 2 hours ago
M53 southbound jct 9 exit slip road closure
M56 Eastbound lanes 1 and 2 closure (MP 52/5 to 49/4)
Cleared Roadworks National HighwaysCleared 5 days 3 hours ago
M56 Eastbound lanes 1 and 2 closure (MP 52/5 to 49/4)
A55 Northbound lane 2 closure (MP 132/4 to 133/5)
Cleared Roadworks National HighwaysCleared 5 days 22 hours ago
A55 Northbound lane 2 closure (MP 132/4 to 133/5)