A50 westbound Toyota roundabout entry slip road closure
ClearedA50 westbound Toyota roundabout entry slip road closure
- Start time
- Mon, Sep 28, 2026 7:00 PM
- Expected end
- Tue, Sep 29, 2026 5:00 AM
- Duration
- 8 hours 20 minutes 1 second
- Road
- A50 – A50 Westbound Access From A38
- Category
- Construction Work
- Direction
- Westbound
- Reason
- Construction Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Sep 22, 2026 5:00 AM
- Last updated
- Tue, Sep 29, 2026 2:58 AM
- Cleared
- Tue, Sep 29, 2026 3:20 AM
- Latest update: A50 westbound Toyota roundabout entry slip road closure
- Coordinates
- 52.867095, -1.575610
- Latitude span
- 52.865578 – 52.868355
- Longitude span
- -1.579803 – -1.570388
- Bounding box centre
- 52.866967, -1.575096
- Location descriptions
-
- A50 westbound access from A38
- Feed validity status
- Planned
- Overall feed start
- Mon, Sep 28, 2026 7:00 PM
- Overall feed end
- Tue, Sep 29, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- A50 westbound access from A38
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- West Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A50
- Linear Element Model
- The Network Model
- Linear Element Id
- {8AF213E7-A112-4B1C-89F4-E8C0F377A480}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 116 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.86786 -1.578279 52.867873 -1.578322 52.868273 -1.579551 52.868321 -1.579699 52.868355 -1.579803
Segment 2
9 coordinate pairs- Description
- A50 westbound access from A38
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- West Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A50
- Linear Element Model
- The Network Model
- Linear Element Id
- {D089F0C9-4751-4A6C-BA2E-C5140715BBB0}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 6 m
- To Distance
- 595 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.865578 -1.570388 52.865653 -1.570664 52.86568 -1.570767 52.865962 -1.571671 52.866636 -1.574071 52.866736 -1.574426 52.866973 -1.575271 52.867573 -1.577344 52.86786 -1.578279
- Geometry type
- MultiLineString
- Geometry points
- 14
- First coordinate pair
- -1.578279, 52.867860
- Road section segments
- 1
- Road section points
- 14
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.578279,
52.86786
],
[
-1.578322,
52.867873
],
[
-1.579551,
52.868273
],
[
-1.579699,
52.868321
],
[
-1.579803,
52.868355
],
[
-1.570388,
52.865578
],
[
-1.570664,
52.865653
],
[
-1.570767,
52.86568
],
[
-1.571671,
52.865962
],
[
-1.574071,
52.866636
],
[
-1.574426,
52.866736
],
[
-1.575271,
52.866973
],
[
-1.577344,
52.867573
],
[
-1.578279,
52.86786
]
]
]
}
View road section coordinates
[
[
[
-1.578279,
52.86786
],
[
-1.578322,
52.867873
],
[
-1.579551,
52.868273
],
[
-1.579699,
52.868321
],
[
-1.579803,
52.868355
],
[
-1.570388,
52.865578
],
[
-1.570664,
52.865653
],
[
-1.570767,
52.86568
],
[
-1.571671,
52.865962
],
[
-1.574071,
52.866636
],
[
-1.574426,
52.866736
],
[
-1.575271,
52.866973
],
[
-1.577344,
52.867573
],
[
-1.578279,
52.86786
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Construction Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 6
- Record created
- Tue, Sep 22, 2026 5:00 AM
- Record versioned
- Tue, Sep 29, 2026 2:58 AM
- Coordinate source
- Geometry
Driving on the A50? See every live closure, roadwork and planned restriction on this road.
A50 live closuresRelated incidents
Full Closure A518 Rbt to A515 Int
Planned Roadworks National HighwaysStarts in 2 hours 28 minutes
Full Closure A518 Rbt to A515 Int
Full Closure A518 Rbt to A515 Int
Cleared Roadworks National HighwaysCleared 2 days 12 hours ago
Full Closure A518 Rbt to A515 Int
Lane 2,3 closure eastbound
Cleared Roadworks National HighwaysCleared 2 days 11 hours ago
Lane 2,3 closure eastbound
Junction 1 EB Exit Slip
Cleared Roadworks National HighwaysCleared 2 days 12 hours ago
Junction 1 EB Exit Slip
Lane 2 closure eastbound
Cleared Roadworks National HighwaysCleared 3 days 11 hours ago
Lane 2 closure eastbound
Full Closure A518 Rbt to A515 Int
Cleared Roadworks National HighwaysCleared 3 days 12 hours ago
Full Closure A518 Rbt to A515 Int