A47 both directions Thorney to Thorney Toll lane closure

Cleared

A47 both directions Thorney to Thorney Toll lane closure

Start time
Mon, Sep 21, 2026 7:00 PM
Expected end
Tue, Sep 22, 2026 4:00 AM
Duration
8 hours 35 minutes 1 second
Road
A47 – A47 Eastbound Between B1167 Near Thorney (East) And A141
Category
Road Maintenance
Direction
Eastbound
Carriageway
Dual Carriageway
Lanes affected
Lane 2 closed, 1 of 1 lanes affected
Reason
Roadworks
Live incident
Active roadworks
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Mon, Sep 21, 2026 12:15 PM
Last updated
Tue, Sep 22, 2026 3:21 AM
Cleared
Tue, Sep 22, 2026 3:35 AM
  • Latest update: A47 both directions Thorney to Thorney Toll lane closure
Coordinates
52.621261, -0.055059
Latitude span
52.620830 – 52.621760
Longitude span
-0.056396 – -0.053613
Bounding box centre
52.621295, -0.055005
Location descriptions
  • A47 eastbound between B1167 near Thorney (east) and A141
Feed validity status
Planned
Overall feed start
Mon, Sep 21, 2026 7:00 PM
Overall feed end
Tue, Sep 22, 2026 4:00 AM
Feed window length
9 hours
Probability code (raw)
probable
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
other
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

6 coordinate pairs
Description
A47 eastbound between B1167 near Thorney (east) and A141
Carriageway
Dual Carriageway
Lane Usage
Cl2
Lane Number
2
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
1 lane restricted
Operational Lanes
0 operational lanes
Direction On Section
East Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
A47
Linear Element Model
The Network Model
Linear Element Id
{9972C29A-C03B-40B2-8615-980544F7C2AD}
Linear Element Type
A Carriageway
From Distance
11 m
To Distance
160 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
52.62176 -0.056396
52.621753 -0.056377
52.621562 -0.055943
52.621359 -0.055395
52.621162 -0.054832
52.621024 -0.054556

Segment 2

3 coordinate pairs
Description
A47 eastbound between B1167 near Thorney (east) and A141
Carriageway
Single Carriageway
Lane Usage
Cl2
Lane Number
2
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
1 lane restricted
Operational Lanes
1 operational lane
Direction On Section
East Bound
Direction Relative
Both
Height Grade
Start1 End1
Linear Element Road
A47
Linear Element Model
The Network Model
Linear Element Id
{747C2B2F-BFFC-42B4-8180-AFEEF1E613E3}
Linear Element Type
A Carriageway
From Distance
0 m
To Distance
67 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
52.621024 -0.054556
52.620877 -0.053861
52.62083 -0.053613
Geometry type
MultiLineString
Geometry points
9
First coordinate pair
-0.056396, 52.621760
Road section segments
1
Road section points
9
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                -0.056396,
                52.62176
            ],
            [
                -0.056377,
                52.621753
            ],
            [
                -0.055943,
                52.621562
            ],
            [
                -0.055395,
                52.621359
            ],
            [
                -0.054832,
                52.621162
            ],
            [
                -0.054556,
                52.621024
            ],
            [
                -0.054556,
                52.621024
            ],
            [
                -0.053861,
                52.620877
            ],
            [
                -0.053613,
                52.62083
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            -0.056396,
            52.62176
        ],
        [
            -0.056377,
            52.621753
        ],
        [
            -0.055943,
            52.621562
        ],
        [
            -0.055395,
            52.621359
        ],
        [
            -0.054832,
            52.621162
        ],
        [
            -0.054556,
            52.621024
        ],
        [
            -0.054556,
            52.621024
        ],
        [
            -0.053861,
            52.620877
        ],
        [
            -0.053613,
            52.62083
        ]
    ]
]
Cause type
Road Maintenance
Detailed cause
Roadworks
Compliance
Mandatory
Probability
Probable
Validity status
Planned
Road management
Other
Feed region label
Thorney
Feed provider
National Highways
Data source
Roadworks
Feed version
1
Record created
Mon, Sep 21, 2026 12:15 PM
Record versioned
Tue, Sep 22, 2026 3:21 AM
Coordinate source
Geometry

Driving on the A47? See every live closure, roadwork and planned restriction on this road.

A47 live closures

Related incidents

A1 southbound Stibbington to Water Newton 50mph speed restriction (MP 31/9 to 31/1)

Planned Roadworks National Highways
Peterborough A1 · A1 Southbound Between A47 And A605

Expected to clear in 5 months 2 weeks

Started 17 Dec 2025, 03:25 Expected clear 31 Mar 2027, 04:00

A1 southbound Stibbington to Water Newton 50mph speed restriction (MP 31/9 to 31/1)

Category: Construction Work
View update

A47 eastbound Thickthorn Interchange entry slip lane 1 closure

Active Roadworks National Highways
Norwich A47 · A47 Eastbound Between A11 And A140

Expected to clear in 5 months 2 weeks

Started 30 Oct 2025, 06:00 Expected clear 1 Apr 2027, 05:00

A47 eastbound Thickthorn Interchange entry slip lane 1 closure

Category: Construction Work
View update

A1 southbound Stamford to Wittering lane closure

Planned Roadworks National Highways
Peterborough A1 · A1 Southbound Between A43 And B1081 Near Stamford (South)

Starts in 4 hours 52 minutes

Starts 12 Oct 2026, 20:00 Expected clear 13 Oct 2026, 04:00

A1 southbound Stamford to Wittering lane closure

Category: Road Maintenance
View update

A47 eastbound approach to New Cut roundabout lane 1 closure

Planned Roadworks National Highways
Peterborough A47 · A47 Eastbound Between B1040 And B1167 Near Thorney (East)

Starts in 3 hours 52 minutes

Starts 12 Oct 2026, 19:00 Expected clear 13 Oct 2026, 05:00

A47 eastbound approach to New Cut roundabout lane 1 closure

Category: Road Maintenance
View update

A47 Guyhirn roundabout lane closure

Planned Roadworks National Highways
Fenland A47 · Roundabout At A47/A141

Starts in 3 hours 52 minutes

Starts 12 Oct 2026, 19:00 Expected clear 13 Oct 2026, 05:00

A47 Guyhirn roundabout lane closure

Category: Road Maintenance
View update

A47 both directions New Cut roundabout to Guyhirn roundabout carriageway closure

Planned Roadworks National Highways
Fenland A47 · A47 Eastbound Between B1167 Near Thorney (East) And A141

Starts in 3 hours 52 minutes

Starts 12 Oct 2026, 19:00 Expected clear 13 Oct 2026, 05:00

A47 both directions New Cut roundabout to Guyhirn roundabout carriageway closure

Category: Road Maintenance
View update