A46 northbound Dyrham Park to Tormarton road narrows
ClearedA46 northbound Dyrham Park to Tormarton road narrows
- Start time
- Mon, Sep 14, 2026 5:00 AM
- Expected end
- Mon, Sep 14, 2026 5:00 PM
- Duration
- 12 hours
- Road
- A46 – A46 Northbound Between A420 And M4
- Category
- Road Maintenance
- Direction
- Northbound
- Carriageway
- Singlecarriageway
- Lanes affected
- Lane 1 narrow
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Aug 3, 2026 2:32 PM
- Last updated
- Mon, Sep 14, 2026 4:40 PM
- Cleared
- Mon, Sep 14, 2026 5:00 PM
- Latest update: A46 northbound Dyrham Park to Tormarton road narrows
- Coordinates
- 51.489531, -2.357756
- Latitude span
- 51.486957 – 51.490961
- Longitude span
- -2.360218 – -2.356578
- Bounding box centre
- 51.488959, -2.358398
- Location descriptions
-
- A46 northbound between A420 and M4
- Feed validity status
- Planned
- Overall feed start
- Mon, Sep 14, 2026 5:00 AM
- Overall feed end
- Mon, Sep 14, 2026 5:00 PM
- Feed window length
- 12 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- true
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
8 coordinate pairs- Description
- A46 northbound between A420 and M4
- Carriageway
- Single Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Narrow
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Both
- Height Grade
- Start1 End1
- Linear Element Road
- A46
- Linear Element Model
- The Network Model
- Linear Element Id
- {817B8DCA-B533-40F0-B568-71F1FA83CDC7}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 83 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.490249 -2.356934 51.490312 -2.356887 51.490615 -2.356714 51.49068 -2.356678 51.490764 -2.356648 51.490772 -2.356645 51.490926 -2.356583 51.490961 -2.356578
Segment 2
13 coordinate pairs- Description
- A46 northbound between A420 and M4
- Carriageway
- Single Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Narrow
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Both
- Height Grade
- Start1 End1
- Linear Element Road
- A46
- Linear Element Model
- The Network Model
- Linear Element Id
- {73E1621D-33FC-478D-815B-59A55B4DE1AD}
- Linear Element Type
- A Carriageway
- From Distance
- 99 m
- To Distance
- 532 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.486957 -2.360218 51.487804 -2.359561 51.487904 -2.359475 51.488048 -2.359347 51.488192 -2.359218 51.488363 -2.359018 51.489149 -2.358032 51.489275 -2.357873 51.489483 -2.35763 51.489618 -2.357487 51.489771 -2.357344 51.49006 -2.357073 51.490249 -2.356934
- Geometry type
- MultiLineString
- Geometry points
- 21
- First coordinate pair
- -2.356934, 51.490249
- Road section segments
- 1
- Road section points
- 21
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.356934,
51.490249
],
[
-2.356887,
51.490312
],
[
-2.356714,
51.490615
],
[
-2.356678,
51.49068
],
[
-2.356648,
51.490764
],
[
-2.356645,
51.490772
],
[
-2.356583,
51.490926
],
[
-2.356578,
51.490961
],
[
-2.360218,
51.486957
],
[
-2.359561,
51.487804
],
[
-2.359475,
51.487904
],
[
-2.359347,
51.488048
],
[
-2.359218,
51.488192
],
[
-2.359018,
51.488363
],
[
-2.358032,
51.489149
],
[
-2.357873,
51.489275
],
[
-2.35763,
51.489483
],
[
-2.357487,
51.489618
],
[
-2.357344,
51.489771
],
[
-2.357073,
51.49006
],
[
-2.356934,
51.490249
]
]
]
}
View road section coordinates
[
[
[
-2.356934,
51.490249
],
[
-2.356887,
51.490312
],
[
-2.356714,
51.490615
],
[
-2.356678,
51.49068
],
[
-2.356648,
51.490764
],
[
-2.356645,
51.490772
],
[
-2.356583,
51.490926
],
[
-2.356578,
51.490961
],
[
-2.360218,
51.486957
],
[
-2.359561,
51.487804
],
[
-2.359475,
51.487904
],
[
-2.359347,
51.488048
],
[
-2.359218,
51.488192
],
[
-2.359018,
51.488363
],
[
-2.358032,
51.489149
],
[
-2.357873,
51.489275
],
[
-2.35763,
51.489483
],
[
-2.357487,
51.489618
],
[
-2.357344,
51.489771
],
[
-2.357073,
51.49006
],
[
-2.356934,
51.490249
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Restrictions in effect
- Width restriction
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Aug 3, 2026 2:32 PM
- Record versioned
- Mon, Sep 14, 2026 4:40 PM
- Coordinate source
- Geometry
Driving on the A46? See every live closure, roadwork and planned restriction on this road.
A46 live closuresRelated incidents
M4 eastbound Jct 18 to 17 lane closure (166/5 to 162/1)
Active Roadworks National HighwaysExpected to clear in 2 hours 45 minutes
M4 eastbound Jct 18 to 17 lane closure (166/5 to 162/1)
Contra flow westbound with eastbound closed from Horseshoe Drive
Planned Roadworks National HighwaysExpected to clear in 1 week 5 hours
contra flow westbound with eastbound closed from Horseshoe Drive
M48 eastbound Jct 2 to Jct 1 hard shoulder closure 199/9-194/6
Planned Roadworks National HighwaysExpected to clear in 5 days 2 hours
M48 eastbound Jct 2 to Jct 1 hard shoulder closure 199/9-194/6
Contra flow westbound with eastbound closed from Horseshoe Drive
Active Roadworks National HighwaysExpected to clear in 2 months 3 weeks
contra flow westbound with eastbound closed from Horseshoe Drive
A466 : Both directions : M48 J2 Newhouse to A48 Interchange : Resurfacing work : Road closed : Diversions in place : 12/10/26-15/10/26 2000-0600 :
Active Roadworks Traffic WalesDescription: A466 : Both directions : M48 J2 Newhouse to A48 Interchange : Resurfacing work : Road closed : Diversions in place : 12/10/26-15/10/26 2000-0600 :, Start time: 12/10/2026 20:00 , End Date: 15/10/2026 6:00, Severity: Road closure, Source: Welsh Government, Last updated: 09/10/2026 11:57
A40 eastbound lane 2 closure
Planned Roadworks National HighwaysStarts in 5 hours 45 minutes
A40 eastbound lane 2 closure