A43 southbound Syresham entry slip road closure
ClearedA43 southbound Syresham entry slip road closure
- Start time
- Wed, Oct 14, 2026 7:00 PM
- Expected end
- Thu, Oct 15, 2026 5:00 AM
- Duration
- 10 hours
- Category
- Construction Work
- Reason
- Road Improvement Or Upgrading
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Oct 7, 2026 6:49 PM
- Last updated
- Thu, Oct 15, 2026 4:45 AM
- Cleared
- Thu, Oct 15, 2026 5:00 AM
- Latest update: A43 southbound Syresham entry slip road closure
- Feed validity status
- Planned
- Overall feed start
- Wed, Oct 14, 2026 7:00 PM
- Overall feed end
- Thu, Oct 15, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
- Cause type
- Construction Work
- Detailed cause
- Road Improvement Or Upgrading
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 237
- Record created
- Wed, Oct 7, 2026 6:49 PM
- Record versioned
- Thu, Oct 15, 2026 4:45 AM
Related incidents
A30 Both Directions Penzance to Exeter Mobile Lane Closures
Planned Roadworks National HighwaysExpected to clear in 11 hours 25 minutes
A30 Both Directions Penzance to Exeter Mobile Lane Closures
Both directions mobile lane closures
Planned Roadworks National HighwaysExpected to clear in 11 hours 25 minutes
Both directions mobile lane closures
A628 eastbound Tintwistle Layby closure
Planned Roadworks National HighwaysExpected to clear in 25 minutes 23 seconds
A628 eastbound Tintwistle Layby closure
A35 Morcombelake traffic lights in place
Planned Roadworks National HighwaysExpected to clear in 1 day 9 hours
A35 Morcombelake traffic lights in place
A2 eastbound lane 2 closure switch to Lane 1 closure (107.6 - 108.4)
Active Roadworks National HighwaysExpected to clear in 3 weeks 14 hours
A2 eastbound lane 2 closure switch to Lane 1 closure (107.6 - 108.4)
Contra flow westbound with eastbound closed from Horseshoe Drive
Planned Roadworks National HighwaysExpected to clear in 4 days 14 hours
contra flow westbound with eastbound closed from Horseshoe Drive