A3M northbound hard shoulder closure (4.2 - 4.4)
ClearedA3M northbound hard shoulder closure (4.2 - 4.4)
- Start time
- Mon, Jul 20, 2026 8:30 AM
- Expected end
- Mon, Jul 20, 2026 2:00 PM
- Duration
- 5 hours 30 minutes
- Category
- Authority Operation
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Jul 7, 2026 7:49 AM
- Last updated
- Mon, Jul 20, 2026 1:29 PM
- Cleared
- Mon, Jul 20, 2026 2:00 PM
- Latest update: A3M northbound hard shoulder closure (4.2 - 4.4)
- Feed validity status
- Planned
- Overall feed start
- Mon, Jul 20, 2026 8:30 AM
- Overall feed end
- Mon, Jul 20, 2026 2:00 PM
- Feed window length
- 5 hours 30 minutes
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
- Cause type
- Authority Operation
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Tue, Jul 7, 2026 7:49 AM
- Record versioned
- Mon, Jul 20, 2026 1:29 PM
Related incidents
M1 Northbound Jct 5 to Jct 6 Carriageway and Slip Road closure
Active Roadworks National HighwaysExpected to clear in 3 hours 20 minutes
M1 Northbound Jct 5 to Jct 6 Carriageway and Slip Road closure
M25 anticlockwise Jct 11 to Jct 10 carriageway closure
Active Roadworks National HighwaysExpected to clear in 3 hours 20 minutes
M25 anticlockwise Jct 11 to Jct 10 carriageway closure
A3 Northbound WIsley carriageway closure between the exit and entry slip road
Active Roadworks National HighwaysExpected to clear in 3 hours 20 minutes
A3 Northbound WIsley carriageway closure between the exit and entry slip road
A417 Southbound from A46 Shurdington to Air Balloon Roundabout carriageway closure
Active Roadworks National HighwaysExpected to clear in 2 days 3 hours
A417 Southbound from A46 Shurdington to Air Balloon Roundabout carriageway closure
M1 southbound Jct 13 to Jct 11A lane 1 and 2 closure (MP 64/1 to 60/1)
Active Roadworks National HighwaysExpected to clear in 2 hours 20 minutes
M1 southbound Jct 13 to Jct 11A lane 1 and 2 closure (MP 64/1 to 60/1)
A421 clockwise Brogborough Roundabout outer ring management
Planned Roadworks National HighwaysExpected to clear in 2 hours 20 minutes
A421 clockwise Brogborough Roundabout outer ring management