A30 westbound Carland - lane 2 closure
ClearedA30 westbound Carland - lane 2 closure
- Start time
- Thu, Sep 24, 2026 7:00 PM
- Expected end
- Fri, Sep 25, 2026 5:00 AM
- Duration
- 15 minutes 2 seconds
- Road
- A30 – A30 Westbound Between A3076 And A39 Near Newquay (West)
- Category
- Construction Work
- Direction
- Westbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 2 closed, 1 of 1 lanes affected
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Sep 9, 2026 8:11 AM
- Last updated
- Thu, Sep 24, 2026 6:54 PM
- Cleared
- Thu, Sep 24, 2026 7:15 PM
- Latest update: A30 westbound Carland - lane 2 closure
- Coordinates
- 50.351994, -5.012679
- Latitude span
- 50.350237 – 50.353904
- Longitude span
- -5.019114 – -5.007194
- Bounding box centre
- 50.352071, -5.013154
- Location descriptions
-
- A30 westbound between A3076 and A39 near Newquay (west)
- Feed validity status
- Planned
- Overall feed start
- Thu, Sep 24, 2026 7:00 PM
- Overall feed end
- Fri, Sep 25, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- A30 westbound between A3076 and A39 near Newquay (west)
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- West Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {4575B864-9AEB-4731-8AB5-72D4CB19310D}
- Linear Element Type
- A Carriageway
- From Distance
- 269 m
- To Distance
- 271 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.353904 -5.007194 50.353897 -5.007232
Segment 2
8 coordinate pairs- Description
- A30 westbound between A3076 and A39 near Newquay (west)
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- West Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {13237FA4-4CB7-4D95-BFB3-8322A8CF781D}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 333 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.351043 -5.01463 50.350851 -5.01531 50.350702 -5.015888 50.35055 -5.016609 50.350467 -5.017142 50.350399 -5.017661 50.350306 -5.018467 50.350237 -5.019114
Segment 3
14 coordinate pairs- Description
- A30 westbound between A3076 and A39 near Newquay (west)
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- West Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {E3A51D9A-D40A-430A-A417-EFD2A71DEC0C}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 617 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.353897 -5.007232 50.353749 -5.007891 50.353605 -5.008441 50.353366 -5.00921 50.353184 -5.009736 50.353001 -5.010202 50.352838 -5.010607 50.352647 -5.011041 50.352256 -5.011863 50.35189 -5.012645 50.351535 -5.013392 50.351315 -5.013902 50.35118 -5.014263 50.351043 -5.01463
- Geometry type
- MultiLineString
- Geometry points
- 24
- First coordinate pair
- -5.007194, 50.353904
- Road section segments
- 1
- Road section points
- 24
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-5.007194,
50.353904
],
[
-5.007232,
50.353897
],
[
-5.01463,
50.351043
],
[
-5.01531,
50.350851
],
[
-5.015888,
50.350702
],
[
-5.016609,
50.35055
],
[
-5.017142,
50.350467
],
[
-5.017661,
50.350399
],
[
-5.018467,
50.350306
],
[
-5.019114,
50.350237
],
[
-5.007232,
50.353897
],
[
-5.007891,
50.353749
],
[
-5.008441,
50.353605
],
[
-5.00921,
50.353366
],
[
-5.009736,
50.353184
],
[
-5.010202,
50.353001
],
[
-5.010607,
50.352838
],
[
-5.011041,
50.352647
],
[
-5.011863,
50.352256
],
[
-5.012645,
50.35189
],
[
-5.013392,
50.351535
],
[
-5.013902,
50.351315
],
[
-5.014263,
50.35118
],
[
-5.01463,
50.351043
]
]
]
}
View road section coordinates
[
[
[
-5.007194,
50.353904
],
[
-5.007232,
50.353897
],
[
-5.01463,
50.351043
],
[
-5.01531,
50.350851
],
[
-5.015888,
50.350702
],
[
-5.016609,
50.35055
],
[
-5.017142,
50.350467
],
[
-5.017661,
50.350399
],
[
-5.018467,
50.350306
],
[
-5.019114,
50.350237
],
[
-5.007232,
50.353897
],
[
-5.007891,
50.353749
],
[
-5.008441,
50.353605
],
[
-5.00921,
50.353366
],
[
-5.009736,
50.353184
],
[
-5.010202,
50.353001
],
[
-5.010607,
50.352838
],
[
-5.011041,
50.352647
],
[
-5.011863,
50.352256
],
[
-5.012645,
50.35189
],
[
-5.013392,
50.351535
],
[
-5.013902,
50.351315
],
[
-5.014263,
50.35118
],
[
-5.01463,
50.351043
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed region label
- Newquay
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Wed, Sep 9, 2026 8:11 AM
- Record versioned
- Thu, Sep 24, 2026 6:54 PM
- Coordinate source
- Geometry
Driving on the A30? See every live closure, roadwork and planned restriction on this road.
A30 live closuresRelated incidents
A38 eastbound Moorswater to Liskeard lane closure 20/0-21/2
Planned Roadworks National HighwaysExpected to clear in 4 hours 9 minutes
A38 eastbound Moorswater to Liskeard lane closure 20/0-21/2
A38 eastbound Liskeard layby closure
Planned Roadworks National HighwaysExpected to clear in 3 days 4 hours
A38 eastbound Liskeard layby closure
Lane 1 closure
Planned Roadworks National HighwaysStarts in 6 hours 9 minutes
lane 1 closure
A30 Both Directions Penzance to Exeter Mobile Lane Closures
Planned Roadworks National HighwaysStarts in 5 hours 9 minutes
A30 Both Directions Penzance to Exeter Mobile Lane Closures
A30 Eastbound Town Lane to Clockhouse Lane 2 closure
Cleared Roadworks National HighwaysCleared 55 minutes 53 seconds ago
A30 Eastbound Town Lane to Clockhouse Lane 2 closure
A30 Both Directions Penzance to Exeter Mobile Lane Closures
Cleared Roadworks National HighwaysCleared 55 minutes 53 seconds ago
A30 Both Directions Penzance to Exeter Mobile Lane Closures