A3 northbound Milford entry slip road closure
ClearedA3 northbound Milford entry slip road closure
- Start time
- Thu, Jul 30, 2026 8:00 PM
- Expected end
- Fri, Jul 31, 2026 5:00 AM
- Duration
- 8 hours 5 minutes 2 seconds
- Category
- Road Maintenance
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Jul 22, 2026 9:50 AM
- Last updated
- Fri, Jul 31, 2026 3:48 AM
- Cleared
- Fri, Jul 31, 2026 4:05 AM
- Latest update: A3 northbound Milford entry slip road closure
- Feed validity status
- Planned
- Overall feed start
- Thu, Jul 30, 2026 8:00 PM
- Overall feed end
- Fri, Jul 31, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, Jul 22, 2026 9:50 AM
- Record versioned
- Fri, Jul 31, 2026 3:48 AM
Related incidents
M60 Anticlockwise hardshoulder closure (MP 2/6 to 2/2)
Active Roadworks National HighwaysExpected to clear in 41 minutes 31 seconds
M60 Anticlockwise hardshoulder closure (MP 2/6 to 2/2)
A585 Northbound West Drive to Bourne Way
Planned Roadworks National HighwaysExpected to clear in 41 minutes 31 seconds
A585 Northbound West Drive to Bourne Way
M40 Southbound, Jct 8a exit slip road lane one closure
Planned Roadworks National HighwaysExpected to clear in 2 hours 41 minutes
M40 Southbound, Jct 8a exit slip road lane one closure
A30 Both Directions Penzance to Exeter Mobile Lane Closures
Planned Roadworks National HighwaysExpected to clear in 1 hour 41 minutes
A30 Both Directions Penzance to Exeter Mobile Lane Closures
Both directions mobile lane closures
Planned Roadworks National HighwaysExpected to clear in 1 hour 41 minutes
Both directions mobile lane closures
A417 Southbound from A46 Shurdington to Air Balloon Roundabout carriageway closure
Active Roadworks National HighwaysExpected to clear in 1 day 13 hours
A417 Southbound from A46 Shurdington to Air Balloon Roundabout carriageway closure