A27 eastbound lane 2 closure (including ring management at Ashcombe roundabout)

Cleared

A27 eastbound lane 2 closure (including ring management at Ashcombe roundabout)

Start time
Tue, Jul 14, 2026 6:42 PM
Expected end
Wed, Jul 15, 2026 5:00 AM
Duration
3 hours 48 minutes 1 second
Road
A27 – A27 Eastbound Between B2123 And A277
Category
Construction Work
Direction
Eastbound
Carriageway
Dual Carriageway
Lanes affected
Lane 2 closed, 1 of 1 lanes affected
Reason
Construction Work
Live incident
Active roadworks
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Tue, Jul 14, 2026 6:42 PM
Last updated
Tue, Jul 14, 2026 10:08 PM
Cleared
Tue, Jul 14, 2026 10:30 PM
  • Latest update: A27 eastbound lane 2 closure (including ring management at Ashcombe roundabout)
Coordinates
50.866552, -0.029044
Latitude span
50.865781 – 50.867116
Longitude span
-0.037327 – -0.023276
Bounding box centre
50.866449, -0.030302
Location descriptions
  • A27 eastbound between B2123 and A277
Feed validity status
Active
Overall feed start
Tue, Jul 14, 2026 6:42 PM
Overall feed end
Wed, Jul 15, 2026 5:00 AM
Feed window length
10 hours 18 minutes
Probability code (raw)
certain
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
other
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

10 coordinate pairs
Description
A27 eastbound between B2123 and A277
Carriageway
Dual Carriageway
Lane Usage
Cl2
Lane Number
2
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
1 lane restricted
Operational Lanes
1 operational lane
Direction On Section
East Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
A27
Linear Element Model
The Network Model
Linear Element Id
{C90619BE-8007-4C1E-9674-F4D250EF5E89}
Linear Element Type
A Carriageway
From Distance
0 m
To Distance
426 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
50.866547 -0.029252
50.866573 -0.028971
50.866841 -0.026055
50.866861 -0.025769
50.866893 -0.025288
50.867006 -0.023735
50.867034 -0.023498
50.867081 -0.023365
50.867098 -0.023317
50.867116 -0.023276

Segment 2

8 coordinate pairs
Description
A27 eastbound between B2123 and A277
Carriageway
Dual Carriageway
Lane Usage
Cl2
Lane Number
2
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
1 lane restricted
Operational Lanes
1 operational lane
Direction On Section
East Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
A27
Linear Element Model
The Network Model
Linear Element Id
{959D198F-B26F-46EA-B7CA-029D6D9AEB0F}
Linear Element Type
A Carriageway
From Distance
978 m
To Distance
1,553 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
50.865781 -0.037327
50.865824 -0.036798
50.865826 -0.036755
50.865831 -0.036684
50.865998 -0.034846
50.866539 -0.029335
50.866546 -0.029266
50.866547 -0.029252
Geometry type
MultiLineString
Geometry points
18
First coordinate pair
-0.029252, 50.866547
Road section segments
1
Road section points
18
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                -0.029252,
                50.866547
            ],
            [
                -0.028971,
                50.866573
            ],
            [
                -0.026055,
                50.866841
            ],
            [
                -0.025769,
                50.866861
            ],
            [
                -0.025288,
                50.866893
            ],
            [
                -0.023735,
                50.867006
            ],
            [
                -0.023498,
                50.867034
            ],
            [
                -0.023365,
                50.867081
            ],
            [
                -0.023317,
                50.867098
            ],
            [
                -0.023276,
                50.867116
            ],
            [
                -0.037327,
                50.865781
            ],
            [
                -0.036798,
                50.865824
            ],
            [
                -0.036755,
                50.865826
            ],
            [
                -0.036684,
                50.865831
            ],
            [
                -0.034846,
                50.865998
            ],
            [
                -0.029335,
                50.866539
            ],
            [
                -0.029266,
                50.866546
            ],
            [
                -0.029252,
                50.866547
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            -0.029252,
            50.866547
        ],
        [
            -0.028971,
            50.866573
        ],
        [
            -0.026055,
            50.866841
        ],
        [
            -0.025769,
            50.866861
        ],
        [
            -0.025288,
            50.866893
        ],
        [
            -0.023735,
            50.867006
        ],
        [
            -0.023498,
            50.867034
        ],
        [
            -0.023365,
            50.867081
        ],
        [
            -0.023317,
            50.867098
        ],
        [
            -0.023276,
            50.867116
        ],
        [
            -0.037327,
            50.865781
        ],
        [
            -0.036798,
            50.865824
        ],
        [
            -0.036755,
            50.865826
        ],
        [
            -0.036684,
            50.865831
        ],
        [
            -0.034846,
            50.865998
        ],
        [
            -0.029335,
            50.866539
        ],
        [
            -0.029266,
            50.866546
        ],
        [
            -0.029252,
            50.866547
        ]
    ]
]
Cause type
Construction Work
Detailed cause
Construction Work
Compliance
Mandatory
Probability
Certain
Validity status
Active
Road management
Other
Feed provider
National Highways
Data source
Roadworks
Feed version
1
Record created
Tue, Jul 14, 2026 6:42 PM
Record versioned
Tue, Jul 14, 2026 10:08 PM
Coordinate source
Geometry

Driving on the A27? See every live closure, roadwork and planned restriction on this road.

A27 live closures

Related incidents

A27 eastbound lane 1 closure (113/6 to 116/6)

Planned Roadworks National Highways
Brighton And Hove A27 · A27 Eastbound Within The A2038 Junction

Expected to clear in 6 hours 47 minutes

Started 3 Aug 2026, 19:00 Expected clear 4 Aug 2026, 04:00

A27 eastbound lane 1 closure (113/6 to 116/6)

Category: Road Maintenance
View update

A27 eastbound lane 2 closure

Active Roadworks National Highways
Chichester A27 · A27 Eastbound Between A285 Near Chichester (East) And A29 Near Bognor Regis (West)

Expected to clear in 7 hours 47 minutes

Started 3 Aug 2026, 18:41 Expected clear 4 Aug 2026, 05:00

A27 eastbound lane 2 closure

Category: Road Maintenance
View update

A27 eastbound Langstone carriageway closure between the exit and entry slip roads

Cleared Roadworks National Highways
Havant A27 · A27 Eastbound Between A3023 And A259 Near Emsworth

Cleared 1 hour 12 minutes ago

Started 3 Aug 2026, 20:00 Ended 3 Aug 2026, 20:00

A27 eastbound Langstone carriageway closure between the exit and entry slip roads

Category: Road Maintenance
View update

A27 eastbound lane 2 closure

Cleared Roadworks National Highways
Chichester A27 · A27 Eastbound Between A285 Near Chichester (East) And A29 Near Bognor Regis (West)

Cleared 2 hours 12 minutes ago

Started 3 Aug 2026, 19:00 Ended 3 Aug 2026, 19:00

A27 eastbound lane 2 closure

Category: Road Maintenance
View update

A27 eastbound Langstone carriageway closure between the exit and entry slip roads

Cleared Roadworks National Highways
Havant A27 · A27 Eastbound Between A3023 And A259 Near Emsworth

Cleared 3 days 1 hour ago

Started 31 Jul 2026, 20:00 Ended 31 Jul 2026, 20:00

A27 eastbound Langstone carriageway closure between the exit and entry slip roads

Category: Road Maintenance
View update

A27 eastbound lane 2 closure

Cleared Roadworks National Highways
Brighton And Hove A27 · A27 Eastbound Between A23 And A270 Near Brighton (East)

Cleared 2 days 19 hours ago

Started 31 Jul 2026, 19:12 Ended 1 Aug 2026, 01:20

A27 eastbound lane 2 closure

Category: Road Maintenance
View update