A27 eastbound lane 1 closure (127/3 to 128/9)
ClearedA27 eastbound lane 1 closure (127/3 to 128/9)
- Start time
- Mon, Jul 20, 2026 7:02 PM
- Expected end
- Tue, Jul 21, 2026 5:00 AM
- Duration
- 4 hours 58 minutes 2 seconds
- Road
- A27 – A27 Eastbound Between B2123 And A277
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 1 lanes affected
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Jul 20, 2026 7:02 PM
- Last updated
- Mon, Jul 20, 2026 11:44 PM
- Cleared
- Tue, Jul 21, 2026 12:00 AM
- Latest update: A27 eastbound lane 1 closure (127/3 to 128/9)
- Coordinates
- 50.866767, -0.026760
- Latitude span
- 50.866055 – 50.867116
- Longitude span
- -0.034261 – -0.023276
- Bounding box centre
- 50.866586, -0.028769
- Location descriptions
-
- A27 eastbound between B2123 and A277
- Feed validity status
- Active
- Overall feed start
- Mon, Jul 20, 2026 7:02 PM
- Overall feed end
- Tue, Jul 21, 2026 5:00 AM
- Feed window length
- 9 hours 58 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
10 coordinate pairs- Description
- A27 eastbound between B2123 and A277
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A27
- Linear Element Model
- The Network Model
- Linear Element Id
- {C90619BE-8007-4C1E-9674-F4D250EF5E89}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 426 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.866547 -0.029252 50.866573 -0.028971 50.866841 -0.026055 50.866861 -0.025769 50.866893 -0.025288 50.867006 -0.023735 50.867034 -0.023498 50.867081 -0.023365 50.867098 -0.023317 50.867116 -0.023276
Segment 2
4 coordinate pairs- Description
- A27 eastbound between B2123 and A277
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A27
- Linear Element Model
- The Network Model
- Linear Element Id
- {959D198F-B26F-46EA-B7CA-029D6D9AEB0F}
- Linear Element Type
- A Carriageway
- From Distance
- 1,196 m
- To Distance
- 1,553 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.866055 -0.034261 50.866539 -0.029335 50.866546 -0.029266 50.866547 -0.029252
- Geometry type
- MultiLineString
- Geometry points
- 14
- First coordinate pair
- -0.029252, 50.866547
- Road section segments
- 1
- Road section points
- 14
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.029252,
50.866547
],
[
-0.028971,
50.866573
],
[
-0.026055,
50.866841
],
[
-0.025769,
50.866861
],
[
-0.025288,
50.866893
],
[
-0.023735,
50.867006
],
[
-0.023498,
50.867034
],
[
-0.023365,
50.867081
],
[
-0.023317,
50.867098
],
[
-0.023276,
50.867116
],
[
-0.034261,
50.866055
],
[
-0.029335,
50.866539
],
[
-0.029266,
50.866546
],
[
-0.029252,
50.866547
]
]
]
}
View road section coordinates
[
[
[
-0.029252,
50.866547
],
[
-0.028971,
50.866573
],
[
-0.026055,
50.866841
],
[
-0.025769,
50.866861
],
[
-0.025288,
50.866893
],
[
-0.023735,
50.867006
],
[
-0.023498,
50.867034
],
[
-0.023365,
50.867081
],
[
-0.023317,
50.867098
],
[
-0.023276,
50.867116
],
[
-0.034261,
50.866055
],
[
-0.029335,
50.866539
],
[
-0.029266,
50.866546
],
[
-0.029252,
50.866547
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Jul 20, 2026 7:02 PM
- Record versioned
- Mon, Jul 20, 2026 11:44 PM
- Coordinate source
- Geometry
Driving on the A27? See every live closure, roadwork and planned restriction on this road.
A27 live closuresRelated incidents
A27 eastbound Langstone carriageway closure between the exit and entry slip roads
Planned Roadworks National HighwaysStarts in 7 hours 30 minutes
A27 eastbound Langstone carriageway closure between the exit and entry slip roads
A27 eastbound lane 4 closure (49/3 to 54/3)
Planned Roadworks National HighwaysStarts in 7 hours 41 seconds
A27 eastbound lane 4 closure (49/3 to 54/3)
A27 eastbound lane 2 closure (73/5 to 76/7)
Planned Roadworks National HighwaysStarts in 6 hours 30 minutes
A27 eastbound lane 2 closure (73/5 to 76/7)
A27 eastbound Adur entry slip road closure
Planned Roadworks National HighwaysStarts in 6 hours 30 minutes
A27 eastbound Adur entry slip road closure
A27 eastbound lane 1 closure (113/6 to 116/6)
Cleared Roadworks National HighwaysCleared 9 hours 39 minutes ago
A27 eastbound lane 1 closure (113/6 to 116/6)
A27 eastbound Langstone carriageway closure between the exit and entry slip roads
Cleared Roadworks National HighwaysCleared 12 hours 4 minutes ago
A27 eastbound Langstone carriageway closure between the exit and entry slip roads