A2 both directions Duke of York roundabout to Eastern Docks roundabout carriageway closure

Cleared

A2 both directions Duke of York roundabout to Eastern Docks roundabout carriageway closure

Start time
Thu, Oct 1, 2026 7:00 PM
Expected end
Fri, Oct 2, 2026 5:00 AM
Duration
10 hours
Road
A2 – A2 Westbound Between A20 And A258
Category
Road Maintenance
Direction
Westbound
Carriageway
Dual Carriageway
Reason
Maintenance Work
Live incident
Active roadworks
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Mon, Jan 12, 2026 9:59 AM
Last updated
Fri, Oct 2, 2026 4:41 AM
Cleared
Fri, Oct 2, 2026 5:00 AM
  • Latest update: A2 both directions Duke of York roundabout to Eastern Docks roundabout carriageway closure
Coordinates
51.125914, 1.327691
Latitude span
51.125707 – 51.126173
Longitude span
1.327425 – 1.328046
Bounding box centre
51.125940, 1.327736
Location descriptions
  • A2 westbound between A20 and A258
Feed validity status
Planned
Overall feed start
Thu, Oct 1, 2026 7:00 PM
Overall feed end
Fri, Oct 2, 2026 5:00 AM
Feed window length
10 hours
Probability code (raw)
probable
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
carriagewayClosures (Carriageway Closures)
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

2 coordinate pairs
Description
A2 westbound between A20 and A258
Carriageway
Dual Carriageway
Lanes Restricted
2 lanes restricted
Operational Lanes
0 operational lanes
Direction On Section
West Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
A2
Linear Element Model
The Network Model
Linear Element Id
{0E59BF7B-9F88-4F17-ADCE-3AF186E28D4D}
Linear Element Type
B Carriageway
From Distance
0 m
To Distance
15 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
51.125794 1.327874
51.125707 1.328046

Segment 2

7 coordinate pairs
Description
A2 westbound between A20 and A258
Carriageway
Dual Carriageway
Lanes Restricted
1 lane restricted
Operational Lanes
0 operational lanes
Direction On Section
West Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
A2
Linear Element Model
The Network Model
Linear Element Id
{66C5F6A4-2872-4739-8CB2-5A1BACD84B6C}
Linear Element Type
B Carriageway
From Distance
7 m
To Distance
61 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
51.126173 1.327425
51.126048 1.327492
51.125993 1.327531
51.125955 1.327585
51.125908 1.327653
51.125852 1.327735
51.125794 1.327874
Geometry type
MultiLineString
Geometry points
9
First coordinate pair
1.327874, 51.125794
Road section segments
1
Road section points
9
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                1.327874,
                51.125794
            ],
            [
                1.328046,
                51.125707
            ],
            [
                1.327425,
                51.126173
            ],
            [
                1.327492,
                51.126048
            ],
            [
                1.327531,
                51.125993
            ],
            [
                1.327585,
                51.125955
            ],
            [
                1.327653,
                51.125908
            ],
            [
                1.327735,
                51.125852
            ],
            [
                1.327874,
                51.125794
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            1.327874,
            51.125794
        ],
        [
            1.328046,
            51.125707
        ],
        [
            1.327425,
            51.126173
        ],
        [
            1.327492,
            51.126048
        ],
        [
            1.327531,
            51.125993
        ],
        [
            1.327585,
            51.125955
        ],
        [
            1.327653,
            51.125908
        ],
        [
            1.327735,
            51.125852
        ],
        [
            1.327874,
            51.125794
        ]
    ]
]
Cause type
Road Maintenance
Detailed cause
Maintenance Work
Compliance
Mandatory
Probability
Probable
Validity status
Planned
Road management
Carriageway Closures
Feed provider
National Highways
Data source
Roadworks
Feed version
1
Record created
Mon, Jan 12, 2026 9:59 AM
Record versioned
Fri, Oct 2, 2026 4:41 AM
Coordinate source
Geometry

Driving on the A2? See every live closure, roadwork and planned restriction on this road.

A2 live closures

Related incidents

A2 eastbound lane 2 closure switch to Lane 1 closure (107.6 - 108.4)

Active Roadworks National Highways
Canterbury A2 · A2 Eastbound Between A260 And A256 Near Whitfield (West)

Expected to clear in 3 weeks 3 days

Started 12 Oct 2026, 04:01 Expected clear 5 Nov 2026, 20:00

A2 eastbound lane 2 closure switch to Lane 1 closure (107.6 - 108.4)

Category: Authority Operation
View update

A2 eastbound lane 2 closure (117/2a to 118/8a)

Planned Roadworks National Highways
Dover A2 · A2 Eastbound Within The A256 Near Whitfield (East) Junction

Starts in 1 hour 8 minutes

Starts 12 Oct 2026, 19:00 Expected clear 13 Oct 2026, 05:00

A2 eastbound lane 2 closure (117/2a to 118/8a)

Category: Road Maintenance
View update

A2 eastbound Cobham exit slip road closure

Planned Roadworks National Highways
Gravesend A2 · A2 Eastbound Exit At A Minor Junction Between A227 And M2/A289

Starts in 1 hour 8 minutes

Starts 12 Oct 2026, 19:00 Expected clear 13 Oct 2026, 05:00

A2 eastbound Cobham exit slip road closure

Category: Construction Work
View update

A2 eastbound lane 1 closure (40/6A to 42/1)

Planned Roadworks National Highways
Gravesend A2 · A2 Eastbound Between A227 And M2/A289

Starts in 1 hour 8 minutes

Starts 12 Oct 2026, 19:00 Expected clear 13 Oct 2026, 05:00

A2 eastbound lane 1 closure (40/6A to 42/1)

Category: Construction Work
View update

A2 eastbound lane 2 closure switch to Lane 1 closure (107.6 - 108.4)

Cleared Roadworks National Highways
Canterbury A2 · A2 Eastbound Between A260 And A256 Near Whitfield (West)

Cleared 12 hours 51 minutes ago

Started 12 Oct 2026, 05:00 Ended 12 Oct 2026, 05:00

A2 eastbound lane 2 closure switch to Lane 1 closure (107.6 - 108.4)

Category: Authority Operation
View update

A2 southbound Barham to Coldred carriageway closure

Cleared Roadworks National Highways
Canterbury A2 · A2 Eastbound Between A260 And A256 Near Whitfield (West)

Cleared 12 hours 51 minutes ago

Started 11 Oct 2026, 19:47 Ended 12 Oct 2026, 05:00

A2 southbound Barham to Coldred carriageway closure

Category: Authority Operation
View update