A1M On approach to Jct 60 Southbound Hard Shoulder and Lane 1 Closure
ClearedA1M On approach to Jct 60 Southbound Hard Shoulder and Lane 1 Closure
- Start time
- Mon, Sep 28, 2026 7:00 PM
- Expected end
- Tue, Sep 29, 2026 5:00 AM
- Duration
- 10 minutes 1 second
- Category
- Road Maintenance
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Sep 25, 2026 10:08 PM
- Last updated
- Mon, Sep 28, 2026 6:45 PM
- Cleared
- Mon, Sep 28, 2026 7:10 PM
- Latest update: A1M On approach to Jct 60 Southbound Hard Shoulder and Lane 1 Closure
- Feed validity status
- Planned
- Overall feed start
- Mon, Sep 28, 2026 7:00 PM
- Overall feed end
- Tue, Sep 29, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 6
- Record created
- Fri, Sep 25, 2026 10:08 PM
- Record versioned
- Mon, Sep 28, 2026 6:45 PM
Related incidents
A14 eastbound Jct 23 exit slip road lane 2 closure
Planned Roadworks National HighwaysExpected to clear in 7 minutes 53 seconds
A14 eastbound Jct 23 exit slip road lane 2 closure
M56 eastbound hard shoulder and lanes 1 and 2 closure (MP 24/4 to 20/5)
Planned Roadworks National HighwaysExpected to clear in 1 hour 7 minutes
M56 eastbound hard shoulder and lanes 1 and 2 closure (MP 24/4 to 20/5)
A64 eastbound Tadcaster to Bilbrough lane 1 closure (8/0 to 9/7)
Planned Roadworks National HighwaysExpected to clear in 1 hour 7 minutes
A64 eastbound Tadcaster to Bilbrough lane 1 closure (8/0 to 9/7)
M65 Eastbound Jct 5 entry slip road closure
Planned Roadworks National HighwaysExpected to clear in 1 hour 7 minutes
M65 Eastbound Jct 5 entry slip road closure
A5 eastbound Malborough Way between slips carriageway closure
Planned Roadworks National HighwaysExpected to clear in 1 hour 7 minutes
A5 eastbound Malborough Way between slips carriageway closure
M6 southbound Jct 16 to Jct 15 carriageway closure
Planned Roadworks National HighwaysExpected to clear in 1 hour 7 minutes
M6 southbound Jct 16 to Jct 15 carriageway closure