A1(M) northbound Jct 8 to Jct 9 lane 3 closure (MP 53/3 to 54/7)
ClearedA1(M) northbound Jct 8 to Jct 9 lane 3 closure (MP 53/3 to 54/7)
- Start time
- Thu, Sep 24, 2026 8:26 PM
- Expected end
- Fri, Sep 25, 2026 4:00 AM
- Duration
- 3 hours 34 minutes 2 seconds
- Road
- A1(M) – A1(M) Northbound Between J8 And J9
- Category
- Road Maintenance
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 3 closed, 1 of 3 lanes affected
- Reason
- Repair Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Sep 24, 2026 8:26 PM
- Last updated
- Thu, Sep 24, 2026 11:25 PM
- Cleared
- Fri, Sep 25, 2026 12:00 AM
- Latest update: A1(M) northbound Jct 8 to Jct 9 lane 3 closure (MP 53/3 to 54/7)
- Coordinates
- 51.944202, -0.212952
- Latitude span
- 51.939190 – 51.951549
- Longitude span
- -0.214816 – -0.211406
- Bounding box centre
- 51.945370, -0.213111
- Location descriptions
-
- A1(M) northbound between J8 and J9
- Feed validity status
- Active
- Overall feed start
- Thu, Sep 24, 2026 8:26 PM
- Overall feed end
- Fri, Sep 25, 2026 4:00 AM
- Feed window length
- 7 hours 34 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
15 coordinate pairs- Description
- A1(M) northbound between J8 and J9
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl3
- Lane Number
- 3
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- A1(M)
- Linear Element Model
- The Network Model
- Linear Element Id
- {A32EBA41-2EC1-4C44-9CA5-14F6550FD2AE}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 1,263 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.940369 -0.214288 51.940383 -0.21428 51.940556 -0.214202 51.942575 -0.213298 51.943067 -0.213104 51.943853 -0.212781 51.943862 -0.212778 51.944068 -0.212714 51.944587 -0.212548 51.945921 -0.21219 51.946871 -0.211992 51.947452 -0.21191 51.947742 -0.21187 51.949025 -0.211717 51.951549 -0.211406
Segment 2
2 coordinate pairs- Description
- A1(M) northbound between J8 and J9
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl3
- Lane Number
- 3
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- A1(M)
- Linear Element Model
- The Network Model
- Linear Element Id
- {F1317841-8898-413E-BBDA-308F2AB4BAB6}
- Linear Element Type
- A Carriageway
- From Distance
- 732 m
- To Distance
- 868 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.93919 -0.214816 51.940369 -0.214288
- Geometry type
- MultiLineString
- Geometry points
- 17
- First coordinate pair
- -0.214288, 51.940369
- Road section segments
- 1
- Road section points
- 17
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.214288,
51.940369
],
[
-0.21428,
51.940383
],
[
-0.214202,
51.940556
],
[
-0.213298,
51.942575
],
[
-0.213104,
51.943067
],
[
-0.212781,
51.943853
],
[
-0.212778,
51.943862
],
[
-0.212714,
51.944068
],
[
-0.212548,
51.944587
],
[
-0.21219,
51.945921
],
[
-0.211992,
51.946871
],
[
-0.21191,
51.947452
],
[
-0.21187,
51.947742
],
[
-0.211717,
51.949025
],
[
-0.211406,
51.951549
],
[
-0.214816,
51.93919
],
[
-0.214288,
51.940369
]
]
]
}
View road section coordinates
[
[
[
-0.214288,
51.940369
],
[
-0.21428,
51.940383
],
[
-0.214202,
51.940556
],
[
-0.213298,
51.942575
],
[
-0.213104,
51.943067
],
[
-0.212781,
51.943853
],
[
-0.212778,
51.943862
],
[
-0.212714,
51.944068
],
[
-0.212548,
51.944587
],
[
-0.21219,
51.945921
],
[
-0.211992,
51.946871
],
[
-0.21191,
51.947452
],
[
-0.21187,
51.947742
],
[
-0.211717,
51.949025
],
[
-0.211406,
51.951549
],
[
-0.214816,
51.93919
],
[
-0.214288,
51.940369
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Repair Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Sep 24, 2026 8:26 PM
- Record versioned
- Thu, Sep 24, 2026 11:25 PM
- Coordinate source
- Geometry
Driving on the A1(M)? See every live closure, roadwork and planned restriction on this road.
A1(M) live closuresRelated incidents
A1(M) both directions Jct 14 to 17 mobile lane 3 closure
Cleared Roadworks National HighwaysExpected to clear in 11 hours 40 minutes
A1(M) both directions Jct 14 to 17 mobile lane 3 closure
A1(M) northbound Jct 7 to Jct 10 IPV works
Planned Roadworks National HighwaysStarts in 3 hours 40 minutes
A1(M) northbound Jct 7 to Jct 10 IPV works
A1M southbound Jct 10 to Jct 7 mobile lane closures
Planned Roadworks National HighwaysStarts in 3 hours 40 minutes
A1M southbound Jct 10 to Jct 7 mobile lane closures
A1M Jct 56 to Jct 57 Northbound Lane 2 Closure
Planned Roadworks National HighwaysStarts in 2 hours 40 minutes
A1M Jct 56 to Jct 57 Northbound Lane 2 Closure
A1M Jct 59 to Jct 60 Northbound Lane 1 and HS Closure
Planned Roadworks National HighwaysStarts in 2 hours 40 minutes
A1M Jct 59 to Jct 60 Northbound Lane 1 and HS Closure
A1M northbound Jct 35 to Jct 36 lane 1 closure (13/0 to 13/9)
Planned Roadworks National HighwaysStarts in 2 hours 40 minutes
A1M northbound Jct 35 to Jct 36 lane 1 closure (13/0 to 13/9)